Home / Browse projects / Mumbai City, Maharashtra / BUILDARCH DAISY

Completed No litigation declared Residential / Group Housing project

BUILDARCH DAISY

By BUILDARCH LAND DEVLOPERS PVT. LTD.

RG-MH-29497 · RERA P51900030673 · Last updated on MahaRERA portal: 17 Feb 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

BUILDARCH DAISY is a Residential / Group Housing project by BUILDARCH LAND DEVLOPERS PVT. LTD. in Mumbai City, Maharashtra, registered with MahaRERA as P51900030673 on 8 Sep 2021. The registration is recorded completed; possession was promised by 31 Dec 2024.

At a glance

Project

  • NameBUILDARCH DAISY
  • TypeResidential / Group Housing
  • Location
    • RANADE ROAD EXTENSION
    • DADAR SHIVAJI PARK
    • GNorth-400028
    • Ward GNorth
    • Mumbai City
    • 400028
  • Pincode400028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900030673
  • ReraGenie IDRG-MH-29497

Builder

  • NameBUILDARCH LAND DEVLOPERS PVT. LTD.
  • Entity typeCompany
  • CINU74210MH1995PTC084344
  • DirectorsMONISH LAXMIKANT THAKOOR, GAYATRI MONISH THAKOOR
  • Other registrations3 more →
  • Completed3 of 4
  • Declared earlier projects4 →

Key dates

this monthRegisteredSep 2021PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on8 Sep 2021
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed67 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDARCH DAISYNA170000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

BUILDARCH DAISY: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 17 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area216 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI858.16
Proposed, not sanctioned858 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPAREL MUMBAI

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANIL R PATIL
EngineerSATISH C DUPELIA
Chartered AccountantGOKHALE & SATHE
PartnerRole in project
BUILDARCH LAND DEVLOPERS PVT. LTD.-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Jul 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Jul 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 May 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 9 May 2024

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf17 Feb 2025
Other - FinanceFile: Reply to Query.pdf13 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf12 Feb 2025
Disclosure of sold/ booked inventoryFile: 11 Disclosure of Sold_ Booked Inventory.pdf12 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf9 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf3 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2418031_OC_signed.pdf9 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate 15042024.pdf15 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate 15042024.pdf15 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold unsold 31032024.pdf15 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA 15042024.pdf15 Apr 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registation Certificate.pdf28 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Q3.pdf8 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Q3.pdf8 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold and unsold Q3.pdf8 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf26 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf26 Oct 2023
Disclosure of sold/ booked inventoryFile: SOLD AND UNSOLD.pdf10 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Daisy Job.pdf10 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect's Certificate.pdf4 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer's Certificate.pdf4 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3CA Certificate.pdf4 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineers Certificate.pdf12 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf12 Aug 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory .pdf7 Jul 2023
Disclosure of sold/ booked inventoryFile: Discloure of Sold and Unsold.pdf14 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf6 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf1 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf1 Feb 2023
Details of encumbrances concerned to FinanceFile: Details Mortagage Charge.pdf14 Jan 2023
Details of encumbrances concerned to LegalFile: Details Mortagage Charge.pdf14 Jan 2023
Disclosure of sold/ booked inventoryFile: SOLD AND UNSOLD.pdf14 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2 A.pdf5 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2 A.pdf7 Oct 2022
Disclosure of sold/ booked inventoryFile: Disclosure.pdf7 Oct 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Letter.pdf6 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM5.pdf30 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architech Certificate.pdf9 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Form 2.pdf9 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Form 2 CON.pdf9 Jul 2022
Disclosure of sold/ booked inventoryFile: Sold UNSOLD.pdf9 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3.pdf9 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architech Certificate.pdf8 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Form 2.pdf8 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2 A.pdf8 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2 A.pdf8 Jul 2022
CERSAI detailsFile: BUILDARCH CERSAI.PDF8 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 - Architect certificate.pdf4 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf4 Jul 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold unsold inventory.pdf4 Jul 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold unsold inventory.pdf4 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA.pdf4 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: Further CC.pdf6 May 2022
OtherFile: Agreement for Development.pdf1 Sep 2021
Copy of the legal title reportFile: Legal Titile Report (2).pdf23 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA.pdf30 Jul 2021
Building plan approvalFile: IOD Drawing.pdf15 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: IOD Drawing.pdf15 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: doc20210705183355.pdf15 Jul 2021
Declaration about Commencement CertificateFile: DEC CC.pdf15 Jul 2021
Layout approvalFile: Decelaration.pdf6 Jul 2021
PAN CardFile: BLDPL - PAN Card.pdf6 Jul 2021
Copy of Layout Approval (in case of layout)File: Decelaration.pdf6 Jul 2021
Details of encumbrancesFile: Details of Encumbrance.pdf5 Jul 2021
Declaration in FORM BFile: reAffidavit dum declaration.pdf5 Jul 2021
Proforma of Allotment letterFile: Sale Agreement Draft.pdf5 Jul 2021
Proforma of Allotment letterFile: Allotement Draft Letter.pdf5 Jul 2021

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise2 delivered late1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
BUILDARCH SAKURAP51900055573DADAR WEST, Mumbai City23Apr 2024OngoingDec 2026Not due yet
BUILDARCH DAISYF P 634 C S NO 7by1710 at Ward GNorth Mumbai City 4000287-OngoingDec 2024Dec 2024
DAFFODILBUILDARCH DAFFODIL RANADE ROAD EXTENSION SHIVAJI PARK DADAR33-CompletedApr 2019Late, Dec 2021
BUILDARCH OLIVEPLOT NO 103 Ward GNorth Mumbai City 40002811-CompletedDec 2017Late, May 2018

How this compares with Mumbai City

33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is completed

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BUILDARCH DAISY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DADAR SHIVAJI PARK780+ in Mumbai City

2 kmBUILDARCH DAISYCompleted 2Lapsed / revoked 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 5 registered projects within 2 km.

Builder: BUILDARCH LAND DEVLOPERS PVT. LTD.

BUILDARCH LAND DEVLOPERS PVT. LTD. has 4 registrations on MahaRERA, including DAFFODIL and BUILDARCH OLIVE. Its filings disclose 4 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if BUILDARCH DAISY is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BUILDARCH DAISY?

The registered promoter entity is BUILDARCH LAND DEVLOPERS PVT. LTD., a company as per the filing. Its CIN U74210MH1995PTC084344 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BUILDARCH DAISY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BUILDARCH DAISY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BUILDARCH DAISY?

The professionals named in the filing: Architect: ANIL R PATIL; Engineer: SATISH C DUPELIA; Chartered Accountant: GOKHALE & SATHE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BUILDARCH DAISY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BUILDARCH DAISY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BUILDARCH DAISY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.