Home / Browse projects / Mumbai City, Maharashtra / BUILDARCH SAKURA

Registered Litigation declared Residential / Group Housing project

BUILDARCH SAKURA

By BUILDARCH LAND DEVLOPERS PVT. LTD.

RG-MH-17677 · RERA P51900055573 · Last updated on MahaRERA portal: 8 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 6 months from the original
4 of 9Construction stages donefurthest along: Internal walls, 90%
18 of 28Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

BUILDARCH SAKURA is a Residential / Group Housing project by BUILDARCH LAND DEVLOPERS PVT. LTD. in Mumbai City, Maharashtra, registered with MahaRERA as P51900055573 on 2 Apr 2024. Possession is promised by 30 Jun 2027. The completion date has moved by 6 months from the original filing. 10 of the 28 units on this registration are recorded sold or booked, and 4 of 9 construction stages are filed complete.

At a glance

Project

  • NameBUILDARCH SAKURA
  • TypeResidential / Group Housing
  • Location
    • GOVIND PATHWARDHAN MARG
    • DADAR WEST
    • Mumbai City
    • 400028
  • Pincode400028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900055573
  • ReraGenie IDRG-MH-17677

Builder

  • NameBUILDARCH LAND DEVLOPERS PVT. LTD.
  • Entity typeCompany
  • CINU74210MH1995PTC084344
  • DirectorsMONISH LAXMIKANT THAKOOR, GAYATRI MONISH THAKOOR
  • Other registrations3 more →
  • Completed3 of 4
  • Declared earlier projects4 →

Key dates

this monthRegisteredApr 2024First promiseDec 2026Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Apr 2024
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 31 Dec 2026)
  • Buildings1 building record
  • Documents filed81 files

Current status

36%10 of 28 units booked
65.7%Work done, per cost certificate

Figures as on 8 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDARCH SAKURANA201928028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 9 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

BUILDARCH SAKURA: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.35%

Progress on shared amenities15

As on 8 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYesNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed33

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots33
Closed/Covered33

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area366 sq m
Land owned byNot the promoter
Named landowners1
LandownerVillageDistrict
ANEESH CO OPERATIVE HOUSING SOCIETY LIMITEDGNorth-400028Mumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI1801.41
Proposed, not sanctioned1,801 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchC 10 and 11 Harganga Mahal Khodadad Circle Dadar TT Dr B A Road Mumbai 400014
Estimated costRs 15.34 cr
Cost incurredRs 10.07 cr
Work done65.65%
BuildingWingEstimatedIncurred
BUILDARCH SAKURANARs 15.34 crRs 10.07 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANIL RAMAKANT PATIL RAMAKANT PATIL
EngineerSAMEER S SAWANT
Chartered AccountantSHIRISH G BAG Chartered Accountant
Chartered AccountantGOKHALE & SATHE
PartnerRole in project
BUILDARCH LAND DEVLOPERS PVT. LTD.-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA13042620620Dec 2026 → Jun 2027

Reason as filed by the promoterDear Sir/Ma’am, we, BUILDARCH LAND DEVLOPERS PVT. LTD., hereby declare the following with respect to the project “BUILDARCH SAKURA” bearing registration number P51900055573 registered under MahaRERA 1. Status of Work Completed: We are pleased to inform you that we have completed the 100% of RCC (Reinforced Cement Concrete) work for the building. Currently, we are undertaking the finishing work, which includes plastering, flooring, electrical fittings, and other essential internal and external works. 2. Expected Timeline for Completion: We are committed to completing all balance works and apply

Litigation declared1

CaseCourtStatus
2153/2023HIGH COURT OF BOMBAYOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jan 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 March 2026.pdf8 Jun 2026
Withdrawal Update Form 1File: Form 1 March 2026.pdf8 Jun 2026
Withdrawal Update Form 2File: Form 2 March 2026.pdf8 Jun 2026
Withdrawal Update Form 2File: Form 2 March 2026.pdf8 Jun 2026
Withdrawal Update Form 3File: Form 3 March 2026.pdf8 Jun 2026
Withdrawal Update Form 3File: Form 3 March 2026.pdf8 Jun 2026
Form 2A (FY 2024-2025)File: Form 2A FY 24-25.pdf8 Jun 2026
Form 5 (FY 2024-2025)File: Form 5 FY 2024-25.pdf8 Jun 2026
Building plan approvalFile: Amended Binder 1- 7.pdf27 Jan 2026
Building plan approvalFile: Amended Binder 2 - 7.pdf27 Jan 2026
Building plan approvalFile: Amended Binder 3 - 7.pdf27 Jan 2026
Building plan approvalFile: Amended Binder 4 - 7.pdf27 Jan 2026
Building plan approvalFile: Amended Binder 5 - 7.pdf27 Jan 2026
Building plan approvalFile: Amended Binder 6 - 7.pdf27 Jan 2026
Building plan approvalFile: Amended Binder 7 - 7.pdf27 Jan 2026
Withdrawal Update Form 1File: Form 1.pdf22 Jan 2026
Withdrawal Update Form 1File: Form 1.pdf22 Jan 2026
Withdrawal Update Form 1File: Form 1.pdf22 Jan 2026
Withdrawal Update Form 2File: Form 2 sakura.pdf22 Jan 2026
Withdrawal Update Form 2File: Form 2 sakura.pdf22 Jan 2026
Withdrawal Update Form 2File: Form 2 sakura.pdf22 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf22 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf22 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf22 Jan 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf26 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Declaration about submission of Form 5 and Form 2A.pdf18 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Declaration about submission of Form 5 and Form 2A.pdf18 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect's Certificate - 15-01-2025.pdf17 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate.pdf17 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf5 Feb 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf4 Feb 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf4 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect's Certificate.pdf12 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate.pdf12 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure of SoldBooked Unsold.pdf12 Dec 2024
Details of encumbrances concerned to FinanceFile: Encumbrance.pdf7 Aug 2024
Details of encumbrances concerned to LegalFile: Encumbrance.pdf7 Aug 2024
Proforma of Agreement for saleFile: FINAL DRAFT Sale Agreement 070824.pdf7 Aug 2024
Other - FinanceFile: Allotment of 4th flat.pdf18 Mar 2024
Other - FinanceFile: PAA DIWATE.pdf11 Mar 2024
Other - FinanceFile: PAA - Satwalekar.pdf11 Mar 2024
Other - FinanceFile: PAA Manoj Malve.pdf11 Mar 2024
Other - FinanceFile: Declaration for Selling Flats before RERA.pdf11 Mar 2024
Building plan approvalFile: Binder1-3.pdf9 Mar 2024
Building plan approvalFile: Binder1-4.pdf9 Mar 2024
Building plan approvalFile: Binder1-5.pdf9 Mar 2024
Building plan approvalFile: Binder1-6.pdf9 Mar 2024
Building plan approvalFile: Binder1-7.pdf9 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Binder1-3.pdf9 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Binder1-4.pdf9 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Binder1-5.pdf9 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Binder1-6.pdf9 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Binder1-7.pdf9 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: 1 Other - Technical.pdf9 Mar 2024
Other - LegalFile: ORDER 50.pdf9 Mar 2024
Other - TechnicalFile: ORDER 50.pdf9 Mar 2024
Layout approvalFile: Binder1-1.pdf7 Feb 2024
Building plan approvalFile: Binder1-2.pdf7 Feb 2024
PAN CardFile: BLDPL - PAN Card.pdf7 Feb 2024
Copy of the legal title reportFile: Legal Title Report Buildarch SAkura1.pdf7 Feb 2024
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance.pdf7 Feb 2024
Details of encumbrances concerned to FinanceFile: 2 b Details of encumbrances concerned to Legal.pdf7 Feb 2024
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance.pdf7 Feb 2024
Details of encumbrances concerned to LegalFile: 2 b Details of encumbrances concerned to Legal.pdf7 Feb 2024
Copy of Layout Approval (in case of layout)File: Binder1-1.pdf7 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Binder1-2.pdf7 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: 2395233_FirstCC_signed.pdf7 Feb 2024
Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate.pdf7 Feb 2024
Declaration in FORM BFile: From B - BLDPL .pdf7 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 sakura.pdf7 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 sakura.pdf7 Feb 2024
CERSAI detailsFile: 1 CERSAI details.pdf7 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Latest.pdf7 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DIN Monish.pdf7 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DIN Gayatri.pdf7 Feb 2024
Proforma of Allotment letterFile: Format Allotment Letter.pdf7 Feb 2024
Proforma of Agreement for saleFile: AFS.pdf7 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow7 Feb 2024
Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter.pdf7 Feb 2024
Deviation Report with respect to model copy of AgreementFile: AFS Deviation.pdf7 Feb 2024

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
BUILDARCH DAISYF P 634 C S NO 7by1710 at Ward GNorth Mumbai City 4000287OngoingDec 2024Dec 2024
DAFFODILBUILDARCH DAFFODIL RANADE ROAD EXTENSION SHIVAJI PARK DADAR33CompletedApr 2019Late, Dec 2021
BUILDARCH OLIVEPLOT NO 103 Ward GNorth Mumbai City 40002811CompletedDec 2017Late, May 2018

How this compares with Mumbai City

36%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one moved by 6 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BUILDARCH SAKURA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DADAR WEST780+ in Mumbai City

2 kmBUILDARCH SAKURACompleted 57Lapsed / revoked 54Other 92Dot size: filed unitsN

Filed coordinates, straight-line distance. 203 registered projects within 2 km.

Builder: BUILDARCH LAND DEVLOPERS PVT. LTD.

BUILDARCH LAND DEVLOPERS PVT. LTD. has 4 registrations on MahaRERA, including DAFFODIL and BUILDARCH OLIVE. Its filings disclose 4 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if BUILDARCH SAKURA is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BUILDARCH SAKURA?

The registered promoter entity is BUILDARCH LAND DEVLOPERS PVT. LTD., a company as per the filing. Its CIN U74210MH1995PTC084344 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BUILDARCH SAKURA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BUILDARCH SAKURA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BUILDARCH SAKURA?

The professionals named in the filing: Architect: ANIL RAMAKANT PATIL RAMAKANT PATIL; Engineer: SAMEER S SAWANT; Chartered Accountant: SHIRISH G BAG Chartered Accountant; Chartered Accountant: GOKHALE & SATHE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BUILDARCH SAKURA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BUILDARCH SAKURA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BUILDARCH SAKURA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.