Home / Browse projects / Bramhacorp Business Park T9-A2
Bramhacorp Business Park T9-A2
RG-MH-13199 · RERA P52100023050 · Last updated on MahaRERA portal: 30 Jun 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 25 other registrations and every project registered within 2 km.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Bramhacorp Business Park T9-A2 is a Commercial project by Bramhacorp Limited in Vadgaonsheri, 411014, registered with MahaRERA as P52100023050 on 22 Nov 2019. Possession is promised by 30 Dec 2029.
At a glance
Project
- NameBramhacorp Business Park T9-A2
- TypeCommercial
- Location
- Vadgaonsheri- Kalyaninagar road
- Vadgaonsheri
- 411014
- Pincode411014
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100023050
- ReraGenie IDRG-MH-13199
Builder
- NameBramhacorp Limited
- Entity typeCompany
- CINU70101PN2012PLC142705
- GSTIN27AAFCB0273N1ZI
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- Other registrations25 more →
- Completed8 of 26
- No longer live1 lapsed, de-registered or revoked
- Past their filed date1
- Declared earlier projects4 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on22 Nov 2019
- Promised completion30 Dec 2029
- Revised completionNone
- Buildings1 building record
- Documents filed143 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| T9-A2 | NA | 10 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 98%.
T9-A2: 86% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 65% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 98% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 98% |
Progress on shared amenities15
As on 30 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 90% |
| Street Lighting | Yes | 95% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 98% |
| Fire protection and fire safety requirements | Yes | 80% |
| Electrical meter room, sub-station, receiving station | Yes | 90% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed238
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | FOURTH DIMENSION ARCHITECT PVT LTD |
| Architect | SACHIN SHAH |
| Engineer | Pankajkumar Somawanshi |
| Engineer | Mahimtura consultants Pvt. Ltd. |
| Chartered Accountant | Faiz shaikh & Co |
| Chartered Accountant | F A A & Associates LLP |
| Partner | Role in project |
|---|---|
| Bramhacorp Limited | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Oct 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Nov 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Nov 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2029
Documents filed143
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 143 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2024-2025)File: Business Park T9 A2.pdf | 30 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Mar 25_T9 A2.pdf | 27 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Dec 24_T9 A2.pdf | 23 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: T9 A2.pdf | 23 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: T9 A2.pdf | 23 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Dec 24_BP T9 A2.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Dec 24_BP T9 A2.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Sep 24_BP T9 A2.pdf | 21 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Sep 24_BP T9 A2.pdf | 21 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: T9 A2.pdf | 21 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_2023-24_BP T9 A2.pdf | 14 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: T9 A2.pdf | 8 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_June 24_T9 A2.pdf | 25 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Jun 24_T9 A2.pdf | 25 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Jun 24_BP T9 A2.pdf | 13 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_Jun 24_B Tower A2.pdf | 13 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: BP T9 A2.pdf | 30 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Mar 24_Business Park T9 A2.pdf | 30 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Mar 24_BP T9 A2.pdf | 29 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_Mar 24_T9 A2.pdf | 29 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Mar 24_BP T9A2.pdf | 27 Apr 2024 |
| Details of encumbrancesFile: Encumbrance Details Certificate - BBP - T 9 A2.pdf | 17 Feb 2024 |
| Declaration in FORM BFile: Form B - T9 A2.pdf | 17 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 _T9 A2_Jan 24.pdf | 17 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 _T9 A2_Jan 24.pdf | 17 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 _T9 A2_Jan 24.pdf | 17 Feb 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration for Bank details - T9 A2.pdf | 17 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Dec 23_Business Park T9 A2.pdf | 16 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Dec 23_Business Park T9 A2.pdf | 16 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_Dec 23_Business Park T9 A2.pdf | 16 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: BUSINESS PARK T9 A2.pdf | 16 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Dec 23_Business Park T9 A2.pdf | 16 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_BP T9 A2_Sep 23.pdf | 19 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: BUSINESS PARK T9A2.pdf | 19 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: BUSINESS PARK T9A2.pdf | 19 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_BP T9 A2_Sep 23.pdf | 19 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_BP T9 A2_Sep 23.pdf | 18 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_BP T9 A2_Sep 23.pdf | 18 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_T9 A2_Sep 23.pdf | 18 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Business Park T9 A2_June 23.pdf | 3 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Business Park T9 A2 Form 3_ Jun 2023_.pdf | 3 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Business Park T9 A2.pdf | 30 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: Inventory_ Business Park T9A2.pdf | 7 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Business Park T9 A2 _June 2023.pdf | 31 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate Form 2A- Business Park T9-A2.pdf | 31 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Business Park T9 A2 Form 3_ Mar 2023.pdf | 20 Apr 2023 |
| Declaration in FORM BFile: BUSINESS PARK T9 A2.pdf | 18 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Business Park T9 A2 _Mar 2023.pdf | 18 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BUSINESS PARK T9A2_MAR 2023.pdf | 18 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate Form 2A- Business Park T9-A2.pdf | 18 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Bramhacorp Business Park T9A2.pdf | 12 Apr 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A_Business Prk T9-A2.pdf | 27 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Business Park T9 A2 Mar 22.pdf | 24 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Business Park T9 A2 Dec 22.pdf | 30 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BUSINESS PARK T9A2_Dec 2022 (2).pdf | 24 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate Form 2A- Business Park T9-A2.pdf | 20 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Bramhacorp Business Park T9A2.pdf | 20 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Business Park T9 A2.pdf | 17 Jan 2023 |
| Proforma of Agreement for saleFile: Business Park T9-A2- ESD.pdf | 9 Dec 2022 |
| Proforma of Agreement for saleFile: Business Park T9-A2- ISD.pdf | 9 Dec 2022 |
| Building plan approvalFile: Sheet 12 - T9 Wing Commercial Floor Plan.pdf | 23 Nov 2022 |
| Building plan approvalFile: Sheet 13 - T9 Wing Commercial Floor Plan.pdf | 23 Nov 2022 |
| Building plan approvalFile: Sheet 14 - T9 Wing Commercial Floor Plan Calculation.pdf | 23 Nov 2022 |
| Building plan approvalFile: Sheet 15 - T9 Wing Commercial Floor Plan Calculation.pdf | 23 Nov 2022 |
| Building plan approvalFile: Sheet 16 - T9 Wing Commercial Floor Plan Calculation.pdf | 23 Nov 2022 |
| Building plan approvalFile: Sheet 17 - T9 Wing Commercial Floor Plan Calculation.pdf | 23 Nov 2022 |
| Layout approvalFile: sheet 1 - revised sanction.pdf | 23 Nov 2022 |
| Copy of Layout Approval (in case of layout)File: sheet 1 - revised sanction.pdf | 23 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 12 - T9 Wing Commercial Floor Plan.pdf | 23 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 13 - T9 Wing Commercial Floor Plan.pdf | 23 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 14 - T9 Wing Commercial Floor Plan Calculation.pdf | 23 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 15 - T9 Wing Commercial Floor Plan Calculation.pdf | 23 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 16 - T9 Wing Commercial Floor Plan Calculation.pdf | 23 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 17 - T9 Wing Commercial Floor Plan Calculation.pdf | 23 Nov 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificates.pdf | 23 Nov 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BUSINESS PARK T9 A2.pdf | 11 Nov 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Business Park T9 A2_compressed.pdf | 11 Nov 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BUSINESS PARK T9A2.pdf | 14 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Business Park T9 A2 Form 3_ Sep 2022.pdf | 14 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Bramhacorp Business Park T9A2.pdf | 12 Oct 2022 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Bramha Exuberance CP52100001076 | KONDHWA, Pune | - | Jul 2017 | Completed | Dec 2021 | Jan 2019 |
| Bramha Vantage A / B | Survey No 6 Hissa No 10 1B Bavdhan Khurd Taluka Mulshi District Pune | 51 | - | Completed | Aug 2017 | Apr 2017 |
| Bramha Baug | Survey No 55B Hissa No 1A 2B at Village Ghorpadi Taluka Haveli District Pune | 8 | - | Completed | Jan 2017 | Late, Feb 2017 |
| Bramha Suncity Platinum | S No 7 Hissa No 1 to 5 S No 8 Hissa No 1 1 2 S No 38A Hissa No 1B 1 S No 38A Hissa No 1A S No 38B Village Wadgaon Sheri Pune | 134 | - | Completed | Sep 2014 | Sep 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 25 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 143 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Bramhacorp Business Park T9-A2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Vadgaonsheri
Filed coordinates, straight-line distance. 82 registered projects within 2 km.
VJ IndiLife Kharadi
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
VJ Central Avenue
Vilas Javdekar Eco Homes
VJ IndiWorks Kharadi Central
Vilas Javdekar Eco Homes
RIVERDALE GRAND
DUVILLE ESTATES PRIVATE LIMITED
Yashwin Orizzonte Phase II
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
ZEN ESTATE
DESTINATION KHARADI DEVELOPERS LLP
Builder: Bramhacorp Limited
Bramhacorp Limited has 26 registrations on MahaRERA, including Bramha Exuberance C and F RESIDENCES T5 T6 and T7. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 4 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record.
Frequently asked questions
What are my rights if Bramhacorp Business Park T9-A2 is delayed beyond 30 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Bramhacorp Business Park T9-A2?
The registered promoter entity is Bramhacorp Limited, a company as per the filing. Its CIN U70101PN2012PLC142705 and GSTIN 27AAFCB0273N1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Bramhacorp Business Park T9-A2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Bramhacorp Business Park T9-A2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Bramhacorp Business Park T9-A2?
The professionals named in the filing: Architect: FOURTH DIMENSION ARCHITECT PVT LTD; Architect: SACHIN SHAH; Engineer: Pankajkumar Somawanshi; Engineer: Mahimtura consultants Pvt. Ltd.; Chartered Accountant: Faiz shaikh & Co; Chartered Accountant: F A A & Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Bramhacorp Business Park T9-A2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.