Home / Browse projects / Bramhacorp Business Park T9-A2

Registered No litigation declared Commercial project

Bramhacorp Business Park T9-A2

By Bramhacorp Limited

RG-MH-13199 · RERA P52100023050 · Last updated on MahaRERA portal: 30 Jun 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 25 other registrations and every project registered within 2 km.

See what the report covers Free either way: .
Dec 2029Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Staircases, 98%
0Complaints at MahaRERAon this registration
Jump to the 143 documents Report an error

Bramhacorp Business Park T9-A2 is a Commercial project by Bramhacorp Limited in Vadgaonsheri, 411014, registered with MahaRERA as P52100023050 on 22 Nov 2019. Possession is promised by 30 Dec 2029.

At a glance

Project

  • NameBramhacorp Business Park T9-A2
  • TypeCommercial
  • Location
    • Vadgaonsheri- Kalyaninagar road
    • Vadgaonsheri
    • 411014
  • Pincode411014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100023050
  • ReraGenie IDRG-MH-13199

Builder

  • NameBramhacorp Limited
  • Entity typeCompany
  • CINU70101PN2012PLC142705
  • GSTIN27AAFCB0273N1ZI
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Other registrations25 more →
  • Completed8 of 26
  • No longer live1 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects4 →

Key dates

this monthRegisteredNov 2019PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Nov 2019
  • Promised completion30 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed143 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
T9-A2NA100000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 98%.

T9-A2: 86% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises65%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%

Progress on shared amenities15

As on 30 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes90%
Street LightingYes95%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes98%
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed238

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots238
Closed/Covered238

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,283 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI11081.03
Proposed, not sanctioned11,081 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch2413, PARMAR HOUSE, EAST STREET, CAMP, PUNE, 411001

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectFOURTH DIMENSION ARCHITECT PVT LTD
ArchitectSACHIN SHAH
EngineerPankajkumar Somawanshi
EngineerMahimtura consultants Pvt. Ltd.
Chartered AccountantFaiz shaikh & Co
Chartered AccountantF A A & Associates LLP
PartnerRole in project
Bramhacorp Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Oct 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2029

Documents filed143

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 143 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: Business Park T9 A2.pdf30 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Mar 25_T9 A2.pdf27 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Dec 24_T9 A2.pdf23 Jan 2025
Disclosure of sold/ booked inventoryFile: T9 A2.pdf23 Jan 2025
Disclosure of sold/ booked inventoryFile: T9 A2.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Dec 24_BP T9 A2.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Dec 24_BP T9 A2.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Sep 24_BP T9 A2.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Sep 24_BP T9 A2.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: T9 A2.pdf21 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_2023-24_BP T9 A2.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: T9 A2.pdf8 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_June 24_T9 A2.pdf25 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Jun 24_T9 A2.pdf25 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Jun 24_BP T9 A2.pdf13 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_Jun 24_B Tower A2.pdf13 Jul 2024
Disclosure of sold/ booked inventoryFile: BP T9 A2.pdf30 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Mar 24_Business Park T9 A2.pdf30 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Mar 24_BP T9 A2.pdf29 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_Mar 24_T9 A2.pdf29 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Mar 24_BP T9A2.pdf27 Apr 2024
Details of encumbrancesFile: Encumbrance Details Certificate - BBP - T 9 A2.pdf17 Feb 2024
Declaration in FORM BFile: Form B - T9 A2.pdf17 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 _T9 A2_Jan 24.pdf17 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 _T9 A2_Jan 24.pdf17 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 _T9 A2_Jan 24.pdf17 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration for Bank details - T9 A2.pdf17 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Dec 23_Business Park T9 A2.pdf16 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Dec 23_Business Park T9 A2.pdf16 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_Dec 23_Business Park T9 A2.pdf16 Jan 2024
Disclosure of sold/ booked inventoryFile: BUSINESS PARK T9 A2.pdf16 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Dec 23_Business Park T9 A2.pdf16 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_BP T9 A2_Sep 23.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: BUSINESS PARK T9A2.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: BUSINESS PARK T9A2.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_BP T9 A2_Sep 23.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_BP T9 A2_Sep 23.pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_BP T9 A2_Sep 23.pdf18 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_T9 A2_Sep 23.pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Business Park T9 A2_June 23.pdf3 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Business Park T9 A2 Form 3_ Jun 2023_.pdf3 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Business Park T9 A2.pdf30 Sep 2023
Disclosure of sold/ booked inventoryFile: Inventory_ Business Park T9­A2.pdf7 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Business Park T9 A2 _June 2023.pdf31 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate Form 2A- Business Park T9-A2.pdf31 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Business Park T9 A2 Form 3_ Mar 2023.pdf20 Apr 2023
Declaration in FORM BFile: BUSINESS PARK T9 A2.pdf18 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Business Park T9 A2 _Mar 2023.pdf18 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BUSINESS PARK T9A2_MAR 2023.pdf18 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate Form 2A- Business Park T9-A2.pdf18 Apr 2023
Disclosure of sold/ booked inventoryFile: Bramhacorp Business Park T9­A2.pdf12 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A_Business Prk T9-A2.pdf27 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Business Park T9 A2 Mar 22.pdf24 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Business Park T9 A2 Dec 22.pdf30 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BUSINESS PARK T9A2_Dec 2022 (2).pdf24 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate Form 2A- Business Park T9-A2.pdf20 Jan 2023
Disclosure of sold/ booked inventoryFile: Bramhacorp Business Park T9­A2.pdf20 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Business Park T9 A2.pdf17 Jan 2023
Proforma of Agreement for saleFile: Business Park T9-A2- ESD.pdf9 Dec 2022
Proforma of Agreement for saleFile: Business Park T9-A2- ISD.pdf9 Dec 2022
Building plan approvalFile: Sheet 12 - T9 Wing Commercial Floor Plan.pdf23 Nov 2022
Building plan approvalFile: Sheet 13 - T9 Wing Commercial Floor Plan.pdf23 Nov 2022
Building plan approvalFile: Sheet 14 - T9 Wing Commercial Floor Plan Calculation.pdf23 Nov 2022
Building plan approvalFile: Sheet 15 - T9 Wing Commercial Floor Plan Calculation.pdf23 Nov 2022
Building plan approvalFile: Sheet 16 - T9 Wing Commercial Floor Plan Calculation.pdf23 Nov 2022
Building plan approvalFile: Sheet 17 - T9 Wing Commercial Floor Plan Calculation.pdf23 Nov 2022
Layout approvalFile: sheet 1 - revised sanction.pdf23 Nov 2022
Copy of Layout Approval (in case of layout)File: sheet 1 - revised sanction.pdf23 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: Sheet 12 - T9 Wing Commercial Floor Plan.pdf23 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: Sheet 13 - T9 Wing Commercial Floor Plan.pdf23 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: Sheet 14 - T9 Wing Commercial Floor Plan Calculation.pdf23 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: Sheet 15 - T9 Wing Commercial Floor Plan Calculation.pdf23 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: Sheet 16 - T9 Wing Commercial Floor Plan Calculation.pdf23 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: Sheet 17 - T9 Wing Commercial Floor Plan Calculation.pdf23 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificates.pdf23 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BUSINESS PARK T9 A2.pdf11 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Business Park T9 A2_compressed.pdf11 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BUSINESS PARK T9A2.pdf14 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Business Park T9 A2 Form 3_ Sep 2022.pdf14 Oct 2022
Disclosure of sold/ booked inventoryFile: Bramhacorp Business Park T9­A2.pdf12 Oct 2022

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Bramha Exuberance CP52100001076KONDHWA, Pune-Jul 2017CompletedDec 2021Jan 2019
Bramha Vantage A / BSurvey No 6 Hissa No 10 1B Bavdhan Khurd Taluka Mulshi District Pune51-CompletedAug 2017Apr 2017
Bramha BaugSurvey No 55B Hissa No 1A 2B at Village Ghorpadi Taluka Haveli District Pune8-CompletedJan 2017Late, Feb 2017
Bramha Suncity PlatinumS No 7 Hissa No 1 to 5 S No 8 Hissa No 1 1 2 S No 38A Hissa No 1B 1 S No 38A Hissa No 1A S No 38B Village Wadgaon Sheri Pune134-CompletedSep 2014Sep 2014

Keep Bramhacorp Business Park T9-A2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vadgaonsheri

2 kmBramhacorp Business ParkCompleted 33Lapsed / revoked 11Other 38Dot size: filed unitsN

Filed coordinates, straight-line distance. 82 registered projects within 2 km.

Builder: Bramhacorp Limited

Bramhacorp Limited has 26 registrations on MahaRERA, including Bramha Exuberance C and F RESIDENCES T5 T6 and T7. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 4 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if Bramhacorp Business Park T9-A2 is delayed beyond 30 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Bramhacorp Business Park T9-A2?

The registered promoter entity is Bramhacorp Limited, a company as per the filing. Its CIN U70101PN2012PLC142705 and GSTIN 27AAFCB0273N1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Bramhacorp Business Park T9-A2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Bramhacorp Business Park T9-A2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Bramhacorp Business Park T9-A2?

The professionals named in the filing: Architect: FOURTH DIMENSION ARCHITECT PVT LTD; Architect: SACHIN SHAH; Engineer: Pankajkumar Somawanshi; Engineer: Mahimtura consultants Pvt. Ltd.; Chartered Accountant: Faiz shaikh & Co; Chartered Accountant: F A A & Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Bramhacorp Business Park T9-A2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Bramhacorp Business Park T9-A2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Bramhacorp Business Park T9-A2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.