Home / Browse projects / Thane, Maharashtra / Bhoomi Castle, Phase I

Registered Litigation declared Residential / Group Housing project

Bhoomi Castle, Phase I

By Gajra Ventures Private Limited

RG-MH-07125 · RERA P51700054644 · Last updated on MahaRERA portal: 11 May 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 3 cases
  • Rs 25.00 crore secured on the land, in favour of Aditya Birla Housing Finance Limited
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
5 of 22Construction stages doneacross 2 buildings; furthest along: Stilt Floor, 70%
226 of 318Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 117 documents Report an error

Bhoomi Castle, Phase I is a Residential / Group Housing project by Gajra Ventures Private Limited in Thane, Maharashtra, registered with MahaRERA as P51700054644 on 2 Feb 2024. Possession is promised by 31 Dec 2030. 92 of the 318 units on this registration are recorded sold or booked, and 5 of 22 construction stages are filed complete.

At a glance

Project

  • NameBhoomi Castle, Phase I
  • TypeResidential / Group Housing
  • Location
    • Kalyan Shil Road
    • Daighar
    • Thane (M Corp.)
    • Thane
    • 421204
  • Pincode421204
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700054644
  • ReraGenie IDRG-MH-07125

Builder

  • NameGajra Ventures Private Limited
  • Entity typeCompany
  • CINU45202MH2010PTC199829
  • GSTIN27AAICA6721H1ZO
  • DirectorsVinod Mangaldas Bhanushali, Bhavik Ramesh Gajra

Key dates

this monthRegisteredFeb 2024PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Feb 2024
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings2 building records
  • Documents filed117 files

Current status

29%92 of 318 units booked
13.3%Work done, per cost certificate

Figures as on 11 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building Type 3 Wing HighnessNA33301440144
Building Type 2 Wing MonarchNA33301740174

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 11 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Stilt Floor, at 70%.

Building Type 3 Wing Highness33%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure39%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building Type 2 Wing Monarch25%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor70%
Slabs of Super Structure3%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed150

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots150
Closed/Covered150
BuildingClosed/CoveredTotal
Building Type 3 Wing Highness5555
Building Type 2 Wing Monarch9595

Land and ownership5

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,062 sq m
Land owned byNot the promoter
Named landowners5
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Housing Finance Limited
Secured amountRs 25.00 crore
CERSAI search filedYes
Declared on15 Jul 2025
LandownerVillageDistrict
Shobha Sadanand PatilThane (M Corp.)Thane
Amey Sadanand PatilThane (M Corp.)Thane
Dhiraj Sadanand PatilThane (M Corp.)Thane
Manik Charya PatilThane (M Corp.)Thane
Mandar Sadanand PatilThane (M Corp.)Thane

Approvals and building plan

Permissible FSI24499.11
Proposed, not sanctioned21,522 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchEmerging Coporates Group, Penisula Business Park, Tower B, 5th Floor, Lower Parel, Mumbai - 40001
Estimated costRs 98.05 cr
Cost incurredRs 13.07 cr
Work done13.33%
BuildingWingEstimatedIncurred
Building Type 2 Wing MonarchNARs 51.25 crRs 3.94 cr
Building Type 3 Wing HighnessNARs 37.00 crRs 8.18 cr
-NARs 9.80 crRs 95.00 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJoshi Deshaware & Associates
EngineerBrixwell Engineering
Chartered AccountantManish K Ramawati and Company
Chartered AccountantHetal Gada & Associates
Chartered AccountantSwapnesh & Vinit
PartnerRole in project
Gajra Ventures Private Limited-

Litigation declared3

CaseCourtStatus
23/2018Civil Court Senior Division ThaneOngoing
28/2023Civil Court Senior Division ThaneClosed
23/2018Civil CourtClosed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Aug 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed117

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 117 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Q4 Mar GVPL.pdf11 May 2026
Withdrawal Update Form 2File: Form 2 Q4 Mar GVPL.pdf11 May 2026
Withdrawal Update Form 3File: Form 3 Q4 Mar 2026 GVPL.pdf11 May 2026
Withdrawal Update Form 1File: 01 Form 1 Q3 FY 25-26 GVPL .pdf6 Apr 2026
Withdrawal Update Form 2File: 02 Form 2 Q3 FY 25-26 GVPL .pdf6 Apr 2026
Withdrawal Update Form 3File: 3- Revised Form 3_Q3 of FY 2025-26 scanned 123456.pdf6 Apr 2026
Building plan approvalFile: Gajra Ventures Sanction Plans t_compressed-compressed-2.pdf3 Dec 2025
Building plan approvalFile: Gajra Ventures Sanction Plans t_compressed-compressed-1.pdf3 Dec 2025
Building plan approvalFile: Gajra Ventures Sanction Plans t_compressed-compressed-3.pdf3 Dec 2025
Building plan approvalFile: Gajra Ventures Sanction Plans t_compressed-compressed-4.pdf3 Dec 2025
Building plan approvalFile: Gajra Ventures Sanction Plans t_compressed-compressed-5.pdf3 Dec 2025
Building plan approvalFile: Gajra Ventures Sanction Plans t_compressed-compressed-6.pdf3 Dec 2025
Building plan approvalFile: Gajra Ventures Sanction Plans t_compressed-compressed-7.pdf3 Dec 2025
Building plan approvalFile: Gajra Ventures Sanction Plans t_compressed-compressed-8.pdf3 Dec 2025
Building plan approvalFile: Gajra Ventures Sanction Plans t_compressed-compressed-9.pdf3 Dec 2025
Withdrawal Update Form 1File: 01- Form 1 GVPL 30-09-2025 02.pdf6 Nov 2025
Withdrawal Update Form 2File: 02-Form 2 GVPL - Sep 2025.PDF6 Nov 2025
Withdrawal Update Form 3File: 03- Final Form 3 Q2 FY 25-26 GVPL SG .pdf6 Nov 2025
Form 5 (FY 2024-2025)File: Form-5-FY-2024-25.pdf30 Sep 2025
Withdrawal Update Form 1File: 1_Form-1 Architect Certificate 30_06_2025.pdf17 Sep 2025
Withdrawal Update Form 2File: 2_Form-2 Engineer Certificate 30-06-2025.pdf17 Sep 2025
Withdrawal Update Form 3File: 3_Form-3 CA Certificate 30-06-2025 .pdf17 Sep 2025
Form 1File: Form 1.pdf15 Jul 2025
Form 2File: Form 2.pdf15 Jul 2025
Form 3File: Form 3 - Bhoomi Castle - Scanned copy.pdf15 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf15 Jul 2025
Form 1File: 1_Form 1 - Architect's Certificate.pdf15 Jul 2025
Form 2File: 2_Form 2 - Engineer's Certificate.pdf15 Jul 2025
Form 3File: 3_Form 3 - signed and scanned.pdf15 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold.pdf15 Jul 2025
Form 1File: 1_Form 1 - GVPL.pdf15 Jul 2025
Form 2File: 2_Form 2 - GVPL.pdf15 Jul 2025
Form 3File: 3_Form 3 signed.pdf15 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold.pdf15 Jul 2025
Form 1File: 1_Form 1 - Q3 - 31-12-2024.pdf15 Jul 2025
Form 2File: 2_Form 2 - Q3 - 31-12-2024.pdf15 Jul 2025
Form 3File: 3_Form 3 - Q3 - 31-12-2024 .pdf15 Jul 2025
Disclosure of Sold and Booked InventoryFile: 4_Disclosure of sold Q3 Compressed.pdf15 Jul 2025
Form 1File: 1_Form 1 Q4 - 16-1-2025 .pdf15 Jul 2025
Form 2File: 2_Form 2 Engineer Certificate.pdf15 Jul 2025
Form 3File: 4- Form-3 GVPL-Q4_compressed.pdf15 Jul 2025
Disclosure of Sold and Booked InventoryFile: 5_Disclosure of Sold Q4.pdf15 Jul 2025
Form 2A (FY 2024-2025)File: 3_Form 2A Engineer Certificate for Quality Assurance.pdf15 Jul 2025
Form 2A (FY 2023-2024)File: Form 2A.pdf15 Jul 2025
Form 5 (FY 2023-2024)File: Form 5 - GVPL-signed.pdf15 Jul 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - GVPL-signed.pdf31 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Form 1- Q3 - 31-12-2024.pdf22 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Form 1 - Q3 - 31-12-2024.pdf22 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_Form 3 - Q3 - 31-12-2024 signed.pdf22 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Form 2 - Q3 - 31-12-2024.pdf22 Mar 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1_FORMAT-A - Declaration about Separate Bank Account.pdf16 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Form 1 - GVPL.pdf30 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_Form 3-signed.pdf30 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_Form 3 signed.pdf30 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Form 2 - GVPL.pdf30 Oct 2024
Disclosure of sold/ booked inventoryFile: 4_DOS - 30-09-2024.pdf30 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Bank letter HDFC.pdf30 Oct 2024
Disclosure of sold/ booked inventoryFile: 4_DOS-30-06-2024.pdf28 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_FORM 1.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Form 1 - Architect's Certificate.pdf20 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Form 2 - Engineer's Certificate.pdf20 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_Form 3 - signed and scanned.pdf20 Aug 2024
Copy of the legal title reportFile: Title_merged_compressed.pdf7 Aug 2024
Details of encumbrances concerned to FinanceFile: GVPL - Finance Encumbrances.pdf7 Aug 2024
Details of encumbrances concerned to LegalFile: GVPL - Finance Encumbrances.pdf7 Aug 2024
Proforma of Agreement for saleFile: AFS rera.pdf7 Aug 2024
Proforma of Allotment letterFile: Final Allotment Letter Draft2.pdf7 Aug 2024
Deviation Report with respect to Allotment letterFile: Deviation Report- Allotment .pdf7 Aug 2024
Deviation Report with respect to model copy of AgreementFile: GVPL - DEVIATION REPORT 060824_compressed.pdf7 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1 20-04-2024.pdf29 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Revised Rera Form 2A - Bhoomi Castle March 2024.pdf29 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Bhoomi Castle - Scanned copy.pdf28 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf30 Apr 2024
Disclosure of sold/ booked inventoryFile: GVPL-RERA SUBMISSION_compressed.pdf18 Apr 2024
Proforma of Agreement for saleFile: Rera_Agmnt_BhoomiCastle210324.pdf21 Mar 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATIONREPORT21032024_0001_compressed.pdf21 Mar 2024
Copy of the legal title reportFile: 2 Copy of the legal title report (11).pdf31 Jan 2024
Other - LegalFile: 2 Copy of the legal title report (11).pdf31 Jan 2024
Details of encumbrances concerned to FinanceFile: Finance Encum- Bhoomi.pdf29 Jan 2024
Details of encumbrances concerned to FinanceFile: Legal Encum- Bhoomi.pdf29 Jan 2024

How this compares with Thane

29%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Bhoomi Castle, Phase I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Daighar7,600+ in Thane

2 kmBhoomi Castle, Phase ICompleted 42Lapsed / revoked 15Other 43Dot size: filed unitsN

Filed coordinates, straight-line distance. 100 registered projects within 2 km.

Builder: Gajra Ventures Private Limited

Gajra Ventures Private Limited has 1 registration on MahaRERA, including Bhoomi Castle, Phase I. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Bhoomi Castle, Phase I is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Bhoomi Castle, Phase I?

The registered promoter entity is Gajra Ventures Private Limited, a company as per the filing. Its CIN U45202MH2010PTC199829 and GSTIN 27AAICA6721H1ZO can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Bhoomi Castle, Phase I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Bhoomi Castle, Phase I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Bhoomi Castle, Phase I?

The professionals named in the filing: Architect: Joshi Deshaware & Associates; Engineer: Brixwell Engineering; Chartered Accountant: Manish K Ramawati and Company; Chartered Accountant: Hetal Gada & Associates; Chartered Accountant: Swapnesh & Vinit. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Bhoomi Castle, Phase I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Bhoomi Castle, Phase I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Bhoomi Castle, Phase I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.