Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

Bhoiwada Chandra Bhuvan CHS Ltd. is a Residential / Group Housing project by Avadhoot Techno Consultant And Engineers in Mumbai City, Maharashtra, registered with MahaRERA as P51900053967 on 18 Dec 2023. Possession is promised by 31 Dec 2026.

At a glance

Project

  • NameBhoiwada Chandra Bhuvan CHS Ltd.
  • TypeResidential / Group Housing
  • Location
    • St. Xavier street
    • Bhoiwada
    • Mumbai City
    • 400012
  • Pincode400012
  • RERA no.P51900053967
  • ReraGenie IDRG-MH-05898

Builder

  • NameAvadhoot Techno Consultant And Engineers
  • Entity typePartnership
  • PartnersKunal Prabhakar Deshmukh, Mayuri Prabhakar Deshmukh, Prabhakar Yashwant Deshmukh, Sarita Sanjay Sonawane, Mangesh Bhikaji Shinde, Ketan Rajendra Patil, Ketan Rajendra Patil, Prabhakar Yashwant Deshmukh, Sarita Sanjay Sonawane, Mayuri Prabhakar Deshmukh, Mangesh Bhikaji Shinde, Kunal Prabhakar Deshmukh

Key dates

this monthRegisteredDec 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 Dec 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed77 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Bhoiwada Chandra BhuvanNA220000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Bhoiwada Chandra Bhuvan: 27% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 4 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed24

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots24
Closed/Covered24

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area499 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Bhoiwada Chandrabhuvan CHS LtdLOHGAONMumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2749.48
Proposed, not sanctioned2,749 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPlot No 37, Wagle Estate, Thane

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr Sushant Patil
EngineerMr Vikas Gokhale
Chartered AccountantMr Abhijit Salian
PartnerRole in project
Avadhoot Techno Consultant And Engineers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: 1 april 2026 signed.pdf4 Jun 2026
Form 2File: 1 April 2026 form2 signed.pdf4 Jun 2026
Form 3File: Form 3 31032026 Signed.pdf4 Jun 2026
Disclosure of Sold and Booked InventoryFile: Unity Sold Mar 2026.pdf4 Jun 2026
Form 1File: 1 Oct 2025 form 1.pdf1 Apr 2026
Form 2File: form 2 oct 2025.pdf1 Apr 2026
Form 3File: Form 3 signed 1st oct 2025.pdf1 Apr 2026
Disclosure of Sold and Booked InventoryFile: Unity Sold Oct 2025.pdf1 Apr 2026
Form 1File: 1 Jan 2026 form 1.pdf1 Apr 2026
Form 2File: 1 Jan 2026 form 1.pdf1 Apr 2026
Form 3File: 1st jan 2026 form 3.pdf1 Apr 2026
Disclosure of Sold and Booked InventoryFile: Unity Sold Jan 2026.pdf1 Apr 2026
Form 3File: 30 june 2025 Form 3.pdf28 Aug 2025
Form 1File: 1 july 2025 form 1.pdf28 Aug 2025
Form 2File: 1 july 2025 form 2.pdf28 Aug 2025
Disclosure of Sold and Booked InventoryFile: Unity Sold July 2025.pdf28 Aug 2025
Form 1File: Form 1 1 4 2025.pdf26 May 2025
Form 2File: Form 2 1 april 2025.pdf26 May 2025
Form 3File: Form 3 1 april 2025.pdf26 May 2025
Disclosure of Sold and Booked InventoryFile: Number of Units sold.pdf26 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect's Certificate 6th Dec 2024 (1)_compressed.pdf26 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Adobe Scan 26-Dec-2024 (1)_compressed.pdf26 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 (1).pdf26 Dec 2024
Disclosure of sold/ booked inventoryFile: unsold inventory 5th Dec_compressed.pdf26 Dec 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION SHEET CHANDRA BHUVAN 18-10-2024.pdf24 Nov 2024
Proforma of Agreement for saleFile: AGREEMENT FOR SALE- CHANDRA BHUVAN PROJECT-FINAL 18-10-2024.pdf24 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: 2431756_FurtherCC_signed.pdf4 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 May 2024 revised.pdf18 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 May 2024 new.pdf18 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf4 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final form 3 may 2024 compressed.pdf4 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 May 2024.pdf4 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 may 2024 signed compressed.pdf23 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM_1_.pdf21 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jan 2024.pdf21 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 May 2024.pdf21 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM_2.pdf21 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf21 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Adobe Scan 18 May 2024_compressed.pdf21 May 2024
Disclosure of sold/ booked inventoryFile: Disclourse Sold:Unsold.pdf15 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_8 Jan 2024_compressed.pdf12 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf12 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Annexure A.pdf12 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Self Declaration.pdf12 Apr 2024
Declaration in FORM BFile: img08854_compressed.pdf11 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect's Certificate (1) (1)-compressed.pdf11 Dec 2023
Other - TechnicalFile: Drawing 1.pdf7 Dec 2023
Copy of the legal title reportFile: TITLE AND FLOW REPORT- AVDHOOT.pdf29 Nov 2023
Building plan approvalFile: Sanctioned Plan.pdf18 Oct 2023
Building plan approvalFile: Sanctioned Plan 2.pdf18 Oct 2023
Building plan approvalFile: Sanctioned Plan 3.pdf18 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan.pdf18 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan 2.pdf18 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan 3.pdf18 Oct 2023
Declaration about Commencement CertificateFile: Format D Declar.pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate_Form 2_31082023.pdf18 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf26 Sep 2023
Details of encumbrances concerned to FinanceFile: Latest No Financial Obligation.pdf22 Sep 2023
Details of encumbrances concerned to FinanceFile: Latest No Legal en.pdf22 Sep 2023
Details of encumbrances concerned to LegalFile: Latest No Financial Obligation.pdf22 Sep 2023
Details of encumbrances concerned to LegalFile: Latest No Legal en.pdf22 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other Real est Mayuri Deshmukh.pdf15 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other Real est P Y Deshmukh.pdf15 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other Real est Sarita Sonawane.pdf15 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other Real est Kunal Deshmukh.pdf15 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other Real est Mangesh Shinde.pdf15 Sep 2023
CERSAI detailsFile: CERSAI_Cersai Search_Report_200280389453_For_Asset_Based_Search_14_09_2023_17_39_29_261.pd14 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other Real est Ketan Patil.pdf14 Sep 2023
Proforma of Agreement for saleFile: Final draft of Agreement.pdf14 Sep 2023
Proforma of Allotment letterFile: Final ALLOTMENT LETTER .pdf14 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Bank Account.pdf14 Sep 2023
Deviation Report with respect to Allotment letterFile: No Deviation Allotmentn Letter .pdf14 Sep 2023
Deviation Report with respect to model copy of AgreementFile: No Deviation Agreement for sale.pdf14 Sep 2023
Layout approvalFile: Sanctioned Plan.pdf31 Aug 2023
PAN CardFile: IMG_0925 Pan Card.pdf31 Aug 2023
Copy of Layout Approval (in case of layout)File: Sanctioned Plan.pdf31 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: Plinth CC.pdf31 Aug 2023

How this compares with Mumbai City

33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Bhoiwada Chandra Bhuvan CHS Ltd. on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhoiwada780+ in Mumbai City

Builder: Avadhoot Techno Consultant And Engineers

Avadhoot Techno Consultant And Engineers has 1 registration on MahaRERA, including Bhoiwada Chandra Bhuvan CHS Ltd.. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if Bhoiwada Chandra Bhuvan CHS Ltd. is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Bhoiwada Chandra Bhuvan CHS Ltd.?

The registered promoter entity is Avadhoot Techno Consultant And Engineers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Bhoiwada Chandra Bhuvan CHS Ltd.?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Bhoiwada Chandra Bhuvan CHS Ltd.?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Bhoiwada Chandra Bhuvan CHS Ltd.?

The professionals named in the filing: Architect: Mr Sushant Patil; Engineer: Mr Vikas Gokhale; Chartered Accountant: Mr Abhijit Salian. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Bhoiwada Chandra Bhuvan CHS Ltd.?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Bhoiwada Chandra Bhuvan CHS Ltd.. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Bhoiwada Chandra Bhuvan CHS Ltd. to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.