Home / Browse projects / Pune, Maharashtra / BHALCHANDRA VIHAR PHASE-III/M1,M2
BHALCHANDRA VIHAR PHASE-III/M1,M2
RG-MH-69185 · RERA P52100046946 · Last updated on MahaRERA portal: 17 Jan 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 16 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
BHALCHANDRA VIHAR PHASE-III/M1,M2 is a Residential / Group Housing project by N B BHONDVE BUILDERS in Pune, Maharashtra, registered with MahaRERA as P52100046946 on 26 Sep 2022. Possession was promised by 29 Jun 2025 and is now 16 months past that date. The completion date has moved by 12 months from the original filing. 1 complaint is on record with the regulator.
At a glance
Project
- NameBHALCHANDRA VIHAR PHASE-III/M1,M2
- TypeResidential / Group Housing
- Location
- BHONDVE BAUG
- RAVET
- Haveli
- Pune
- 412101
- Pincode412101
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100046946
- ReraGenie IDRG-MH-69185
Builder
- NameN B BHONDVE BUILDERS
- Entity typePartnership
- PartnersSHREYAS NANDKUMAR BHONDVE, SUMEET SOMNATH BHONDVE
- Other registrations1 more →
- Completed1 of 2
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on26 Sep 2022
- Promised completion29 Jun 2025
- Revised completionRevised to 29 Jun 2025 (originally 30 Jun 2024)
- Buildings2 building records
- Documents filed65 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING M1 | NA | 14 | 0 | 0 | 0 | 0 |
| WING M2 | NA | 14 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 17 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
16 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.
WING M173%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING M273%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 17 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 90% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed166
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| WING M1 | 48 | 20 | 68 |
| WING M2 | 78 | 20 | 98 |
Land and ownership12
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| UMESH SHIVAJI MANE | Pimpri Chinchawad (M Corp.) | Pune |
| SANDHYA VILAS DESHMUKH | Pimpri Chinchawad (M Corp.) | Pune |
| MOHAN SHIVAJI PATEL | Pimpri Chinchawad (M Corp.) | Pune |
| CHETAN MOHAN PATEL | Pimpri Chinchawad (M Corp.) | Pune |
| PRATIBHA SUBHASH PATKE | Pune (M Corp.) | Pune |
| JITENDRA ARJUNBHAI PATEL | Pimpri Chinchawad (M Corp.) | Pune |
| KISHOR ARJUNBHAI PATEL | Pimpri Chinchawad (M Corp.) | Pune |
| JAYANTILAL SHIVJI PATEL | Pimpri Chinchawad (M Corp.) | Pune |
| JOYKUMAR JAYANTILAL PATEL | Pimpri Chinchawad (M Corp.) | Pune |
| RAHUL VALMIK MANE | Pimpri Chinchawad (M Corp.) | Pune |
| ASHOK TUKARAM DEVKAR | Pimpri Chinchawad (M Corp.) | Pune |
| SANDEEP VITTHAL JADHAV | Pimpale Gurav | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MAHENDRA THAKUR |
| Engineer | RAVINDRA A. KARNAVAT |
| Engineer | ASHOK MOTE |
| Chartered Accountant | DHIRAJ MANOJ BALDOTA |
| Partner | Role in project |
|---|---|
| N B BHONDVE BUILDERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe have completed 90% construction of our project but no objection certificates from our Town Planning Department are yet to come so we are submitting this extension application to you requesting your approval.
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 608/2024 | Civil Judge Senior Division Pune | Pending |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000371038 | Sunilkumar Vinodbhai Patel | N B BHONDVE BUILDERS | 30/05/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Feb 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Sep 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Sep 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 28 Jun 2024
Documents filed65
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 17 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Final.pdf | 17 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 17 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 M1-M2.PDF | 17 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 31.pdf | 17 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 17 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: N B BHONDAVE BUILDER.pdf | 14 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30062024.pdf | 18 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 II.pdf | 18 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold-Unsold Information.pdf | 18 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 II.pdf | 18 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Xerox Scan_16072024122027.PDF | 16 Jul 2024 |
| Declaration in FORM BFile: FORM B BHARCHANDRA VIHAR.pdf | 3 Jul 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Part N B bhondve 109 Vihar_11zon.pdf | 28 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 19-4-24_compressed.pdf | 7 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.PDF | 23 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Bhalchandra Vihar Phase III Form 2.pdf | 23 Apr 2024 |
| Copy of the legal title reportFile: Vihar Search Feb 2024.pdf | 28 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.PDF | 15 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 15 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 15 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.PDF | 29 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Adobe Scan 29 Dec 2023 (3).pdf | 29 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 28-12-2023.pdf | 29 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30092023.PDF | 23 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.PDF | 20 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.PDF | 20 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 46946.pdf | 19 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form - 2A 22-23.pdf | 8 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 M1, M2.PDF | 21 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2.pdf | 21 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3.pdf | 21 Aug 2023 |
| Declaration about Commencement CertificateFile: Polite Buildtech Format D.pdf | 15 Sep 2022 |
| Declaration in FORM BFile: Form B Vihar M1,M2.pdf | 15 Sep 2022 |
| CERSAI detailsFile: Polite Cersai Report.pdf | 15 Sep 2022 |
| CERSAI detailsFile: CERSAI Search.pdf | 15 Sep 2022 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold M1_merged.pdf | 15 Sep 2022 |
| Proforma of Allotment letterFile: Allotment Letter_merged_organized.pdf | 15 Sep 2022 |
| Proforma of Allotment letterFile: Draft Agreement to Sale Model for M1,M2 Final.pdf | 15 Sep 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account.pdf | 15 Sep 2022 |
| Deviation Report with respect to Allotment letterFile: Deviation Report.pdf | 15 Sep 2022 |
| Deviation Report with respect to model copy of AgreementFile: Deviation AFS.pdf | 15 Sep 2022 |
| Layout approvalFile: 0001.pdf | 14 Sep 2022 |
| Layout approvalFile: 0002.pdf | 14 Sep 2022 |
| Building plan approvalFile: MYSCAN_20220504_0009_compressed.pdf | 14 Sep 2022 |
| Building plan approvalFile: MYSCAN_20220504_0008_compressed.pdf | 14 Sep 2022 |
| Building plan approvalFile: MYSCAN_20220504_0007_compressed.pdf | 14 Sep 2022 |
| Building plan approvalFile: MYSCAN_20220504_0006_compressed.pdf | 14 Sep 2022 |
| Building plan approvalFile: MYSCAN_20220504_0005.PDF | 14 Sep 2022 |
| PAN CardFile: Pan.pdf | 14 Sep 2022 |
| Copy of the legal title reportFile: REVISED TITLE VERIFICATION and SEARCH REPORT 1-16.pdf | 14 Sep 2022 |
| Copy of the legal title reportFile: REVISED TITLE VERIFICATION and SEARCH REPORT-17-33.pdf | 14 Sep 2022 |
| Copy of the legal title reportFile: REVISED TITLE VERIFICATION and SEARCH REPORT-34-48.pdf | 14 Sep 2022 |
| Details of encumbrances concerned to FinanceFile: To Finance.pdf | 14 Sep 2022 |
| Details of encumbrances concerned to LegalFile: To Legal.pdf | 14 Sep 2022 |
| Copy of Layout Approval (in case of layout)File: 0001.pdf | 14 Sep 2022 |
| Copy of Layout Approval (in case of layout)File: 0002.pdf | 14 Sep 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20220504_0009_compressed.pdf | 14 Sep 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20220504_0008_compressed.pdf | 14 Sep 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20220504_0007_compressed.pdf | 14 Sep 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20220504_0006_compressed.pdf | 14 Sep 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20220504_0005.PDF | 14 Sep 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE NEW_repaired.pdf | 14 Sep 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Bldg M1, M2 Form-1.pdf | 14 Sep 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bhalchandra Vihar M1, M2.pdf | 14 Sep 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 65 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep BHALCHANDRA VIHAR PHASE-III/M1,M2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near RAVET13,700+ in Pune
Filed coordinates, straight-line distance. 256 registered projects within 2 km.
Godrej Park Greens
Godrej Skyline Developers Limited
FOREST GROVE AT GODREJ PARK GREENS
Godrej Skyline Developers Limited
Om Mangalam Samruddhi
NDG Homes LLP
PCMC EWS KIWALE
Pimpri Chinchwad Municipal Corporation
Godrej Nurture
Godrej Skyline Developers Limited
My Home Sanctuary Phase I
MAMURDI DEVELOPERS LLP
Builder: N B BHONDVE BUILDERS
N B BHONDVE BUILDERS has 2 registrations on MahaRERA, including BHALCHANDRA VIHAR PHASE - IV/M3 and BHALCHANDRA VIHAR PHASE-III/M1,M2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that BHALCHANDRA VIHAR PHASE-III/M1,M2 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if BHALCHANDRA VIHAR PHASE-III/M1,M2 is delayed beyond 29 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of BHALCHANDRA VIHAR PHASE-III/M1,M2?
The registered promoter entity is N B BHONDVE BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in BHALCHANDRA VIHAR PHASE-III/M1,M2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against BHALCHANDRA VIHAR PHASE-III/M1,M2?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for BHALCHANDRA VIHAR PHASE-III/M1,M2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at BHALCHANDRA VIHAR PHASE-III/M1,M2?
The professionals named in the filing: Architect: MAHENDRA THAKUR; Engineer: RAVINDRA A. KARNAVAT; Engineer: ASHOK MOTE; Chartered Accountant: DHIRAJ MANOJ BALDOTA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in BHALCHANDRA VIHAR PHASE-III/M1,M2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback