ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / BHALCHANDRA VIHAR PHASE - II / C

Completed No litigation declared Residential / Group Housing project

BHALCHANDRA VIHAR PHASE - II / C

By POLITE BUILDTECH

RG-MH-21401 · RERA P52100029204 · Last updated on MahaRERA portal: 28 Feb 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2023Possession promisedregistration recorded completed
7 of 11Construction stages donefurthest along: Internal walls, 65%
0Complaints at MahaRERAon this registration
Jump to the 105 documents Report an error

BHALCHANDRA VIHAR PHASE - II / C is a Residential / Group Housing project by POLITE BUILDTECH in Pune, Maharashtra, registered with MahaRERA as P52100029204 on 10 May 2021. The registration is recorded completed; possession was promised by 30 Jun 2023.

At a glance

Project

  • NameBHALCHANDRA VIHAR PHASE - II / C
  • TypeResidential / Group Housing
  • Location
    • NEAR SB PATIL PUBLIC SCHOOL
    • RAVET
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100029204
  • ReraGenie IDRG-MH-21401

Builder

  • NamePOLITE BUILDTECH
  • Entity typePartnership
  • PartnersBHARATKUMAR MOHANBHAI PATEL, MITESHKUMAR ARVINDBHAI PATEL, PIYUSHKUMAR CHIMANBHAI PATEL, RAJESHKUMAR MANILAL PATEL, SWETABAHEN RAJESHKUMAR PATEL, TULSIDAS DEVSI PATEL, TULSIDAS HANSRAJ PATEL, NANDKUMAR BHALCHANDRA BHONDAVE, SUNILKUMAR VINODBHAI PATEL, DINESHBHAI PREMJIBHAI PATEL
  • Other registrations1 more →
  • Completed2 of 2

Key dates

this monthRegisteredMay 2021PromisedJun 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on10 May 2021
  • Promised completion30 Jun 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed105 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CNA180000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Feb 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 65%.

C: 75% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.55%

Progress on shared amenities15

As on 28 Feb 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes10%
Electrical meter room, sub-station, receiving stationYes10%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed35

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots35
Closed/Covered35

Land and ownership12

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,613 sq m
Land owned byThe promoter, with other names on the file
Named landowners12
LandownerVillageDistrict
UMESH SHIVAJI MANEPimpri Chinchawad (M Corp.)Pune
SANDHYA VILAS DESHMUKHPimpri Chinchawad (M Corp.)Pune
MOHAN SHIVJI PATELPimpri Chinchawad (M Corp.)Pune
CHETAN MOHAN PATELPimpri Chinchawad (M Corp.)Pune
PRATIBHA SUBHASH PATKEPune (M Corp.)Pune
JITENDRA ARJUNBHAI PATELPimpri Chinchawad (M Corp.)Pune
KISHOR ARJUNBHAI PATELPimpri Chinchawad (M Corp.)Pune
JAYANTILAL SHIVJI PATELPimpri Chinchawad (M Corp.)Pune
JOYKUMAR JAYANTILAL PATELPimpri Chinchawad (M Corp.)Pune
RAHUL VALMIK MANEPimpri Chinchawad (M Corp.)Pune
ASHOK TUKARAM DEVKARPimpri Chinchawad (M Corp.)Pune
SANDEEP VITTHAL JADHAVPimpale GuravPune

Approvals and building plan

Permissible FSI84782.23
Proposed, not sanctioned4,124 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO 1 SECTOR NO 27A PRADHIKARAN NIGDI PUNE MAHARASHTRA

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectOnkar A Vedpathak Firm Kalprachana and Company
ArchitectMahendra thakur And Associates
EngineerAjinkya A Lahigude
Chartered AccountantM S KUMBHAR AND ASSOCIATES
PartnerRole in project
POLITE BUILDTECH-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Apr 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Apr 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Apr 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Oct 2022

Documents filed105

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 105 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Copy of the legal title reportFile: Vihar Search Feb 2024.pdf28 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 29204-.pdf19 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 08-03-2021 C.pdf27 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Form 1 30-06-2021 C.pdf27 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Form 1 30-09-2021 C.pdf27 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 C Form 11-03-2021.pdf27 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 C 2 From 12-08-2021.pdf27 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 C 2 Form 01-10-2021.pdf27 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 C 2 Form 06-2022.pdf27 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 C 2 Form 10-2022.pdf27 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 4 Form 1 01-01-2022 C.pdf27 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 From 3 19-03-2021 C.pdf27 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 Form 3 08-2021 C.pdf27 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 06-10-2021 C.pdf27 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 Form 3 08-2022 C_compressed.pdf27 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 Form 3 10-2022 C_compressed.pdf27 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf27 Mar 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: complition Certificate.pdf4 Oct 2022
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 C.pdf4 Oct 2022
Copy of the legal title reportFile: REVISED TITLE 1-12.pdf6 Jul 2022
Copy of the legal title reportFile: REVISED TITLE 13-24.pdf6 Jul 2022
Copy of the legal title reportFile: REVISED TITLE 25-36.pdf6 Jul 2022
Copy of the legal title reportFile: REVISED TITLE 37-48.pdf6 Jul 2022
Proforma of Allotment letterFile: UPDATED DRAFT-C-WING-BHALCHANDRA VIHAR- 06-07-2022-1-53.pdf6 Jul 2022
Proforma of Allotment letterFile: UPDATED DRAFT-C-WING-BHALCHANDRA VIHAR- 06-07-2022-54-66.pdf6 Jul 2022
Proforma of Allotment letterFile: UPDATED DRAFT-C-WING-BHALCHANDRA VIHAR- 06-07-2022-67-74.pdf6 Jul 2022
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD-BOOKED INVENTORY (BUILDING-C) 30062022.pdf4 Jul 2022
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD-BOOKED INVENTORY (BUILDING-C) 31032022.pdf8 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A 2021 2022.pdf4 Apr 2022
Disclosure of sold/ booked inventoryFile: Disclouser of Sold Booked Inventory 31122021.pdf6 Jan 2022
Proforma of Allotment letterFile: Agreement To Sale Part 1.pdf15 Dec 2021
Proforma of Allotment letterFile: Agreement To Sale Part 2.pdf15 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A 2 SEPTEMBER 2021.pdf1 Oct 2021
Disclosure of sold/ booked inventoryFile: Disclouser of Sold Booked Inventory 30092021.pdf1 Oct 2021
OtherFile: C 801 CERSAI.pdf23 Sep 2021
Disclosure of sold/ booked inventoryFile: Disclouser of Sold Booked Inventory 14082021.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A 1 JUNE 2021.pdf12 Aug 2021
Copy of the legal title reportFile: Part 1 (2).pdf3 May 2021
Copy of the legal title reportFile: Part 2 (2).pdf3 May 2021
Copy of the legal title reportFile: Part 3.pdf3 May 2021
Copy of the legal title reportFile: Part 4.pdf3 May 2021
Declaration in FORM BFile: FORM - B.pdf26 Apr 2021
Proforma of Allotment letterFile: ALLOTMENT LETTER- For C.pdf26 Apr 2021
Proforma of Allotment letterFile: Agreement to Sale I.pdf26 Apr 2021
Proforma of Allotment letterFile: Agreement to Sale II.pdf26 Apr 2021
Proforma of Allotment letterFile: Agreement to Sale III.pdf26 Apr 2021
OtherFile: DECLARATION Notarised Sr No 22 2019 Dt 25 01 19.pdf26 Apr 2021
OtherFile: DECLARATION.pdf26 Apr 2021
OtherFile: POLITE BUILDTECH AFFIDAVIT NOTARY NO 23 25 01 2019.pdf26 Apr 2021
OtherFile: POLITE BUILDTECH UNDERTAKING NOTARY NO 24 2019 DT 25 01.pdf26 Apr 2021
Layout approvalFile: Layout Plan.pdf23 Apr 2021
Building plan approvalFile: Sanctioned Building Plan Approval 01.pdf23 Apr 2021
Building plan approvalFile: Sanctioned Plan 01.pdf23 Apr 2021
Building plan approvalFile: Sanctioned Plan 02.pdf23 Apr 2021
Building plan approvalFile: Sanctioned Plan 03.pdf23 Apr 2021
Building plan approvalFile: Sanctioned Plan 04.pdf23 Apr 2021
Building plan approvalFile: Sanctioned Plan 05.pdf23 Apr 2021
Building plan approvalFile: Sanctioned Plan 06.pdf23 Apr 2021
Building plan approvalFile: Sanctioned Plan 07.pdf23 Apr 2021
Building plan approvalFile: Sanctioned Plan 08.pdf23 Apr 2021
Building plan approvalFile: Sanctioned Plan 09.pdf23 Apr 2021
Building plan approvalFile: Sanctioned Plan 010.pdf23 Apr 2021
Building plan approvalFile: Sanctioned Plan 011.pdf23 Apr 2021
Building plan approvalFile: Sanctioned Plan 012.pdf23 Apr 2021
Building plan approvalFile: Sanctioned Plan 013.pdf23 Apr 2021
Building plan approvalFile: Sanctioned Plan 013.pdf23 Apr 2021
Building plan approvalFile: Sanctioned Plan 015.pdf23 Apr 2021
Building plan approvalFile: Sanctioned Plan 016.pdf23 Apr 2021
Building plan approvalFile: Sanctioned Plan 017.pdf23 Apr 2021
Building plan approvalFile: Sanctioned Plan 018.pdf23 Apr 2021
Building plan approvalFile: Sanctioned Plan 019.pdf23 Apr 2021
Building plan approvalFile: Sanctioned Plan 020.pdf23 Apr 2021
Building plan approvalFile: Sanctioned Plan 021.pdf23 Apr 2021
Building plan approvalFile: Sanctioned Plan 022.pdf23 Apr 2021
Building plan approvalFile: Sanctioned Plan 023.pdf23 Apr 2021
PAN CardFile: PAN CARD POLITE BUILDTECH.pdf23 Apr 2021
Details of encumbrancesFile: Encumbrance Certificate.pdf23 Apr 2021
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf23 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Building Plan Approval 01.pdf23 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan 01.pdf23 Apr 2021

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BHALCHANDRA VIHAR PHASE - II / C on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near RAVET13,700+ in Pune

2 kmBHALCHANDRA VIHAR PHASE Completed 98Lapsed / revoked 52Other 96Dot size: filed unitsN

Filed coordinates, straight-line distance. 246 registered projects within 2 km.

Builder: POLITE BUILDTECH

POLITE BUILDTECH has 2 registrations on MahaRERA, including BHALCHANDRA VIHAR PHASE - I / A and B and BHALCHANDRA VIHAR PHASE - II / C. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if BHALCHANDRA VIHAR PHASE - II / C is delayed beyond 30 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BHALCHANDRA VIHAR PHASE - II / C?

The registered promoter entity is POLITE BUILDTECH, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BHALCHANDRA VIHAR PHASE - II / C?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BHALCHANDRA VIHAR PHASE - II / C?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BHALCHANDRA VIHAR PHASE - II / C?

The professionals named in the filing: Architect: Onkar A Vedpathak Firm Kalprachana and Company; Architect: Mahendra thakur And Associates; Engineer: Ajinkya A Lahigude; Chartered Accountant: M S KUMBHAR AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BHALCHANDRA VIHAR PHASE - II / C?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BHALCHANDRA VIHAR PHASE - II / C. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BHALCHANDRA VIHAR PHASE - II / C to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.