Home / Browse projects / Belmac Residences C
Belmac Residences C
By SUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED
RG-MH-26374 · RERA P52100013991 · Last updated on MahaRERA portal: 17 Jun 2024
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 9 other registrations and every project registered within 2 km.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Belmac Residences C is a Residential / Group Housing project by SUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED in PUNE, 411014, registered with MahaRERA as P52100013991 on 7 Nov 2017. The registration is recorded completed; possession was promised by 15 Jun 2023.
At a glance
Project
- NameBelmac Residences C
- TypeResidential / Group Housing
- Location
- VADGAONSHERI
- PUNE
- 411014
- Pincode411014
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100013991
- ReraGenie IDRG-MH-26374
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on7 Nov 2017
- Promised completion15 Jun 2023
- Revised completionNone
- Buildings1 building record
- Documents filed99 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Belmac Residences C | NA | 18 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 17 Jun 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
Belmac Residences C: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 17 Jun 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed126
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| SUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED | - |
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 5272/2012 | Civil Judge Junior Division Pune | Disposal of Suit application filed pending for order |
| 5582/2012 | Civil Judge Junior Division Pune | Disposal of Suit application filed pending for order |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Sep 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Dec 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 Mar 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 18 Jan 2024
Documents filed99
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 99 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: TC Form 5.pdf | 17 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Belmac Residences C.pdf | 24 May 2024 |
| Certificates of CA (Form 3)File: Form 3 TC_.pdf | 2 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 TC.pdf | 1 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 TC.pdf | 1 Feb 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate C 103.pdf | 18 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Tower C.pdf | 16 Nov 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Tower C.pdf | 16 Nov 2023 |
| Certificates of CA (Form 3)File: Form 3 Tower C.pdf | 16 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Tower C 30062023.pdf | 6 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 Tower C 30062023.pdf | 6 Sep 2023 |
| Certificates of CA (Form 3)File: Form 3 Tower C 30062023.pdf | 6 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 New Format Tower C 31032023.pdf | 4 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Belmac Residences C 31032023.pdf | 4 Jul 2023 |
| Certificates of CA (Form 3)File: Form 3 Tower C as on 31032023.pdf | 4 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 TC FY 2022-23.pdf | 22 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A TC FY 2022 23.pdf | 21 Jun 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Index 2.pdf | 27 Feb 2023 |
| Status of ConveyanceFile: Index 2.pdf | 27 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 -TC_compressed.pdf | 22 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 _ Tower C_compressed.pdf | 22 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A _ Tower C.pdf | 21 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RERA-Form-5 Tower C Belmac Residences.pdf | 6 Feb 2023 |
| Certificates of CA (Form 3)File: C wing September 2022_compressed.pdf | 3 Feb 2023 |
| Certificates of CA (Form 3)File: Form 3 C wing Dec 2022.pdf | 3 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 New Format Tower C.pdf | 2 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 New Format Engineer Certificate Tower C_compressed.pdf | 2 Feb 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - Tower C Belmac Residences.pdf | 28 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 New Format Tower C.pdf | 16 Dec 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 New Format Engineer Certificate Tower C.pdf | 16 Dec 2022 |
| Certificates of CA (Form 3)File: Form 3 Tower C.pdf | 16 Dec 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate Tower C.pdf | 6 Dec 2022 |
| Certificates of CA (Form 3)File: Form 3 _CA Certificate _Tower C.pdf | 21 Nov 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Tower C.pdf | 14 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Tower C.pdf | 14 Sep 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 TC 31122021.PDF | 27 Apr 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 TC 31122021_compressed.pdf | 27 Apr 2022 |
| Certificates of CA (Form 3)File: Form 3 TC_compressed.pdf | 27 Apr 2022 |
| Certificates of CA (Form 3)File: Form 3 Tower C 310321.pdf | 1 Oct 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: TC_compressed.pdf | 22 Sep 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TC form 1_compressed.pdf | 18 Sep 2021 |
| Declaration about Commencement CertificateFile: Tower C.pdf | 15 Sep 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Tower C_compressed.pdf | 15 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Tower C_compressed.pdf | 15 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2A Form Tower C_compressed.pdf | 15 Sep 2021 |
| Disclosure of sold/ booked inventoryFile: Tower C.pdf | 15 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 Tower C Done.pdf | 15 Sep 2021 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: TC_compressed.pdf | 15 Sep 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Tower C_compressed.pdf | 22 Apr 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Tower C.PDF | 22 Apr 2021 |
| Certificates of CA (Form 3)File: Form 3 Tower C 311219.pdf | 22 Apr 2021 |
| Certificates of CA (Form 3)File: Form 3 Tower C.pdf | 22 Apr 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Tower C signed.pdf | 18 Nov 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Tower C.pdf | 18 Nov 2020 |
| Certificates of CA (Form 3)File: Form 3 Tower C.pdf | 18 Nov 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Tower C.pdf | 12 Nov 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Tower C.pdf | 12 Nov 2020 |
| Certificates of CA (Form 5)File: Form 3 Tower C 311219.pdf | 12 Nov 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 Tower C.pdf | 12 Oct 2020 |
| Copy of the legal title reportFile: Compressed Title report Date 04 07 2020.pdf | 17 Sep 2020 |
| Copy of the legal title reportFile: Title Certificate dated 04th July 2020.PDF | 3 Sep 2020 |
| OtherFile: Abhijeet Certificate dated 02nd July 2020.PDF | 3 Sep 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Tower C.PDF | 12 Nov 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Tower C.pdf | 9 Nov 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Tower C.pdf | 9 Nov 2019 |
| Certificates of CA (Form 3)File: Form 3 Tower C_compressed.pdf | 9 Nov 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certifcate_compressed.pdf | 9 Aug 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_compressed.pdf | 9 Aug 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TC_Form 1_Archi Cer 31122018_compressed.pdf | 17 Apr 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: TC_Form 2_Engi Cer 311218_compressed.pdf | 17 Apr 2019 |
| Certificates of CA (Form 3)File: TC_Form 3_CA Rera Certificate 31122018_compressed.pdf | 17 Apr 2019 |
| Building plan approvalFile: BP C.pdf | 8 Mar 2019 |
| Building Plan Approval (IOD)File: BP C.pdf | 8 Mar 2019 |
| Layout approvalFile: Layout Plan.PDF | 24 Dec 2018 |
| Copy of Layout Approval (in case of layout)File: Layout Plan.PDF | 24 Dec 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Comencement Certificate.pdf | 24 Dec 2018 |
| Certificates of CA (Form 5)File: FORM 5 Tower C.pdf | 12 Dec 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 Tower C.pdf | 19 Jun 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Tower C.pdf | 19 Jun 2018 |
| Certificates of CA (Form 3)File: FORM 3 Tower C.pdf | 19 Jun 2018 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| BELMAC RESIDENCES B | BELMAC RESIDENCES Opposite Bramha Suncity Wadgaonsheri Pune. | 46 | Ongoing | Jun 2024 | Late, Jun 2025 |
| BELMAC RESIDENCES A | BELMAC RESIDENCES Opposite Bramha Suncity Wadgaonsheri Pune. | 45 | Completed | Dec 2021 | Oct 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 9 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 99 filed documents as one ZIP, foldered, with a manifest
Keep Belmac Residences C on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PUNE
Filed coordinates, straight-line distance. 90 registered projects within 2 km.
VJ IndiLife Kharadi
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
VJ Central Avenue
Vilas Javdekar Eco Homes
VJ IndiWorks Kharadi Central
Vilas Javdekar Eco Homes
RIVERDALE GRAND
DUVILLE ESTATES PRIVATE LIMITED
Yashwin Orizzonte Phase II
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
ZEN ESTATE
DESTINATION KHARADI DEVELOPERS LLP
Builder: SUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED
SUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED has 10 registrations on MahaRERA, including Belmac Residences E and Belmac Residences D. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record.
Frequently asked questions
What are my rights if Belmac Residences C is delayed beyond 15 Jun 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Belmac Residences C?
The registered promoter entity is SUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Belmac Residences C?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Belmac Residences C?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in Belmac Residences C?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback