ReraGenieLog inGet a buyer report

Home / Browse projects / Belmac Residences C

Completed No litigation declared Residential / Group Housing project

Belmac Residences C

By SUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED

RG-MH-26374 · RERA P52100013991 · Last updated on MahaRERA portal: 17 Jun 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 9 other registrations and every project registered within 2 km.

See what the report covers Free either way: .
Jun 2023Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 99 documents Report an error

Belmac Residences C is a Residential / Group Housing project by SUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED in PUNE, 411014, registered with MahaRERA as P52100013991 on 7 Nov 2017. The registration is recorded completed; possession was promised by 15 Jun 2023.

At a glance

Project

  • NameBelmac Residences C
  • TypeResidential / Group Housing
  • Location
    • VADGAONSHERI
    • PUNE
    • 411014
  • Pincode411014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100013991
  • ReraGenie IDRG-MH-26374

Builder

  • NameSUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED
  • Entity typeCompany
  • Managing DirectorVIDIP VINOD JATIA
  • Other registrations9 more →
  • Completed10 of 10
  • Declared earlier projects2 →

Key dates

this monthRegisteredNov 2017PromisedJun 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on7 Nov 2017
  • Promised completion15 Jun 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed99 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Belmac Residences CNA180000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Jun 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Belmac Residences C: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 17 Jun 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed126

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots126
Closed/Covered126

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,383 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI7529.09
Proposed, not sanctioned7,529 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNARIMAN POINT TULSIANI CHAMBERS MUMBAI 400021

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
SUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED-

Litigation declared2

CaseCourtStatus
5272/2012Civil Judge Junior Division PuneDisposal of Suit application filed pending for order
5582/2012Civil Judge Junior Division PuneDisposal of Suit application filed pending for order

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Sep 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Dec 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Mar 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 18 Jan 2024

Documents filed99

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 99 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: TC Form 5.pdf17 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Belmac Residences C.pdf24 May 2024
Certificates of CA (Form 3)File: Form 3 TC_.pdf2 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 TC.pdf1 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 TC.pdf1 Feb 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate C 103.pdf18 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Tower C.pdf16 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Tower C.pdf16 Nov 2023
Certificates of CA (Form 3)File: Form 3 Tower C.pdf16 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Tower C 30062023.pdf6 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 Tower C 30062023.pdf6 Sep 2023
Certificates of CA (Form 3)File: Form 3 Tower C 30062023.pdf6 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 New Format Tower C 31032023.pdf4 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Belmac Residences C 31032023.pdf4 Jul 2023
Certificates of CA (Form 3)File: Form 3 Tower C as on 31032023.pdf4 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 TC FY 2022-23.pdf22 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A TC FY 2022 23.pdf21 Jun 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Index 2.pdf27 Feb 2023
Status of ConveyanceFile: Index 2.pdf27 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 -TC_compressed.pdf22 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 _ Tower C_compressed.pdf22 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A _ Tower C.pdf21 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RERA-Form-5 Tower C Belmac Residences.pdf6 Feb 2023
Certificates of CA (Form 3)File: C wing September 2022_compressed.pdf3 Feb 2023
Certificates of CA (Form 3)File: Form 3 C wing Dec 2022.pdf3 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 New Format Tower C.pdf2 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 New Format Engineer Certificate Tower C_compressed.pdf2 Feb 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - Tower C Belmac Residences.pdf28 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 New Format Tower C.pdf16 Dec 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 New Format Engineer Certificate Tower C.pdf16 Dec 2022
Certificates of CA (Form 3)File: Form 3 Tower C.pdf16 Dec 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate Tower C.pdf6 Dec 2022
Certificates of CA (Form 3)File: Form 3 _CA Certificate _Tower C.pdf21 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Tower C.pdf14 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Tower C.pdf14 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 TC 31122021.PDF27 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 TC 31122021_compressed.pdf27 Apr 2022
Certificates of CA (Form 3)File: Form 3 TC_compressed.pdf27 Apr 2022
Certificates of CA (Form 3)File: Form 3 Tower C 310321.pdf1 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: TC_compressed.pdf22 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TC form 1_compressed.pdf18 Sep 2021
Declaration about Commencement CertificateFile: Tower C.pdf15 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Tower C_compressed.pdf15 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Tower C_compressed.pdf15 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2A Form Tower C_compressed.pdf15 Sep 2021
Disclosure of sold/ booked inventoryFile: Tower C.pdf15 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 Tower C Done.pdf15 Sep 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: TC_compressed.pdf15 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Tower C_compressed.pdf22 Apr 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Tower C.PDF22 Apr 2021
Certificates of CA (Form 3)File: Form 3 Tower C 311219.pdf22 Apr 2021
Certificates of CA (Form 3)File: Form 3 Tower C.pdf22 Apr 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Tower C signed.pdf18 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Tower C.pdf18 Nov 2020
Certificates of CA (Form 3)File: Form 3 Tower C.pdf18 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Tower C.pdf12 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Tower C.pdf12 Nov 2020
Certificates of CA (Form 5)File: Form 3 Tower C 311219.pdf12 Nov 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 Tower C.pdf12 Oct 2020
Copy of the legal title reportFile: Compressed Title report Date 04 07 2020.pdf17 Sep 2020
Copy of the legal title reportFile: Title Certificate dated 04th July 2020.PDF3 Sep 2020
OtherFile: Abhijeet Certificate dated 02nd July 2020.PDF3 Sep 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Tower C.PDF12 Nov 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Tower C.pdf9 Nov 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Tower C.pdf9 Nov 2019
Certificates of CA (Form 3)File: Form 3 Tower C_compressed.pdf9 Nov 2019
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certifcate_compressed.pdf9 Aug 2019
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_compressed.pdf9 Aug 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TC_Form 1_Archi Cer 31122018_compressed.pdf17 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: TC_Form 2_Engi Cer 311218_compressed.pdf17 Apr 2019
Certificates of CA (Form 3)File: TC_Form 3_CA Rera Certificate 31122018_compressed.pdf17 Apr 2019
Building plan approvalFile: BP C.pdf8 Mar 2019
Building Plan Approval (IOD)File: BP C.pdf8 Mar 2019
Layout approvalFile: Layout Plan.PDF24 Dec 2018
Copy of Layout Approval (in case of layout)File: Layout Plan.PDF24 Dec 2018
Commencement Certificates / NA Order for plotted developmentFile: Comencement Certificate.pdf24 Dec 2018
Certificates of CA (Form 5)File: FORM 5 Tower C.pdf12 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 Tower C.pdf19 Jun 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Tower C.pdf19 Jun 2018
Certificates of CA (Form 3)File: FORM 3 Tower C.pdf19 Jun 2018

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
BELMAC RESIDENCES BBELMAC RESIDENCES Opposite Bramha Suncity Wadgaonsheri Pune.46OngoingJun 2024Late, Jun 2025
BELMAC RESIDENCES ABELMAC RESIDENCES Opposite Bramha Suncity Wadgaonsheri Pune.45CompletedDec 2021Oct 2021

Keep Belmac Residences C on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUNE

2 kmBelmac Residences CCompleted 35Lapsed / revoked 15Other 40Dot size: filed unitsN

Filed coordinates, straight-line distance. 90 registered projects within 2 km.

Builder: SUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED

SUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED has 10 registrations on MahaRERA, including Belmac Residences E and Belmac Residences D. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record.

Frequently asked questions

What are my rights if Belmac Residences C is delayed beyond 15 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Belmac Residences C?

The registered promoter entity is SUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Belmac Residences C?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Belmac Residences C?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Belmac Residences C?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Belmac Residences C. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Belmac Residences C to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.