Home / Browse projects / Belmac Residences B
Belmac Residences B
By SUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED
RG-MH-04839 · RERA P52100020497 · Last updated on MahaRERA portal: 8 Aug 2025
Source: official MahaRERA filing
Red flags
- 1 complaint at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Belmac Residences B is a Residential / Group Housing project by SUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED in Pune, 411014, registered with MahaRERA as P52100020497 on 18 Apr 2019. The registration is recorded completed; possession was promised by 14 Jun 2025. The completion date has moved by 12 months from the original filing. 1 complaint is on record with the regulator.
At a glance
Project
- NameBelmac Residences B
- TypeResidential / Group Housing
- Location
- VADGAONSHERI
- Pune
- 411014
- Pincode411014
- RERA no.P52100020497
- ReraGenie IDRG-MH-04839
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on18 Apr 2019
- Promised completion14 Jun 2025
- Revised completionRevised to 14 Jun 2025 (originally 15 Jun 2024)
- Buildings1 building record
- Documents filed106 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Belmac Residences B | NA | 18 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 8 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 98%.
Belmac Residences B: 98% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 96% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 98% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 97% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 96% |
Progress on shared amenities15
As on 8 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 94% |
| Water Supply | Yes | 97% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 97% |
| Storm Water Drains | Yes | 95% |
| Landscaping & Tree Planting | Yes | 96% |
| Street Lighting | Yes | 94% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 98% |
| Solid Waste Management And Disposal | Yes | 97% |
| Water conservation /Rain water harvesting | Yes | 97% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed95
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| SUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe outbreak of the COVID-19 pandemic and the inflation in construction prices have had immense impact onto the under-construction buildings due to which we have delayed the completion of one of our buildings namely ‘Belmac Residences B’, by a small margin. We look forward to complete the said building within the next couple of months while we have delivered the other 5 buildings in the same project well on time within the MahaRERA completion dates. We request you to kindly grant us with the extension
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 5272/2012 | Civil Judge Junior Division Pune | Disposal of Suit application filed pending for order |
| 5582/2012 | Civil Judge Junior Division Pune | Disposal of Suit application filed pending for order |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000371037 | Mahendra Sahebrao Salvi | Supreme Holdings & Hospitality (India) ltd. Through its Director Mr. Vidip Jatia | 30/05/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Sep 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Apr 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Apr 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 17 May 2025
Documents filed106
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 106 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1.pdf | 8 Aug 2025 |
| Form 2File: Form 2.pdf | 8 Aug 2025 |
| Form 3File: Form 3.pdf | 8 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold inventory.pdf | 8 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 19 Jul 2025 |
| Certificates of CA (Form 3)File: Form 3.pdf | 19 Jul 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Tower B OC.pdf | 17 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A TB.pdf | 21 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A TB.pdf | 21 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 TB.PDF | 19 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 TB.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 TB.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 New Format Tower B December 2024 (1).pdf | 25 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 Tower B December 2024.pdf | 25 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1 New Format Tower B December 2024 (2).pdf | 25 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 Belmac Residences TB.pdf | 14 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Belmac Residences TB.pdf | 14 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Tower B (1).pdf | 5 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 recidences B june 2024.pdf | 12 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 recidences B june 2024.pdf | 12 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 recidences B june 2024.pdf | 12 Aug 2024 |
| Certificates of CA (Form 3)File: form 3 recidences B june 2024.pdf | 12 Aug 2024 |
| Certificates of CA (Form 3)File: Revised FORM 3 TB.pdf | 19 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: TB Form 5.pdf | 19 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 TB.pdf | 10 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 TB.pdf | 28 May 2024 |
| Certificates of CA (Form 3)File: FORM 3 TB.pdf | 28 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Belmac Residences B.pdf | 24 May 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrances - Legal.pdf | 2 May 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrances Finance.pdf | 2 May 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrances - Legal.pdf | 2 May 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrances Finance.pdf | 2 May 2024 |
| Declaration in FORM BFile: Form B.pdf | 2 May 2024 |
| Disclosure of sold/ booked inventoryFile: Promoter's Disclosure of Sold Booked Inventory.pdf | 2 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations- Namita Jatia.pdf | 2 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations- Vidip Jatia.pdf | 2 May 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account.pdf | 2 May 2024 |
| Certificates of CA (Form 3)File: Form 3 TB_.pdf | 2 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 TB.pdf | 1 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 TB.pdf | 1 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1TowerBSeptember2023.pdf | 16 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Tower C.pdf | 16 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2TowerBSeptember2023.pdf | 16 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Tower C.pdf | 16 Nov 2023 |
| Certificates of CA (Form 3)File: Form3TowerBSeptember2023.pdf | 16 Nov 2023 |
| Certificates of CA (Form 3)File: Form3TowerBSeptember2023.pdf | 16 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1TowerB30062023.pdf | 6 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Tower B 30062023.pdf | 6 Sep 2023 |
| Certificates of CA (Form 3)File: Form 3 Tower B 30062023.pdf | 6 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 New Format Tower B 31032023.pdf | 4 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Belmac Residences B 31032023.pdf | 4 Jul 2023 |
| Certificates of CA (Form 3)File: Form 3 Tower B as on 31032023.pdf | 4 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A TB - FY 2022-23.pdf | 22 Jun 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 TB FY 2022-23.pdf | 22 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -TB_compressed.pdf | 22 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 _ Tower B_compressed.pdf | 22 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A _ Tower B.pdf | 21 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RERA-Form-5 Tower B Belmac Residences.pdf | 6 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 New Format Tower B.pdf | 3 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 New Format Engineer Certificate Tower B_compressed (3).pdf | 3 Feb 2023 |
| Certificates of CA (Form 3)File: Form 3 B wing September 2022.pdf | 3 Feb 2023 |
| Certificates of CA (Form 3)File: Form 3 B wing Dec 2022.pdf | 3 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 New Format Tower B.pdf | 16 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 New Format Tower B.pdf | 16 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 New Format Engineer Certificate Tower B_.pdf | 16 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 New Format Engineer Certificate Tower B.pdf | 16 Dec 2022 |
| Certificates of CA (Form 3)File: Form 3_CA Certificate _Tower B.pdf | 16 Dec 2022 |
| Certificates of CA (Form 3)File: Form 3 Tower B JUNE 2022.pdf | 16 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 TB 31122021.PDF | 27 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 TB 31122021_compressed.pdf | 27 Apr 2022 |
| Certificates of CA (Form 3)File: Form 3 TB_compressed.pdf | 27 Apr 2022 |
| Certificates of CA (Form 3)File: Form 3 Tower B 310321.pdf | 1 Oct 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: TB_compressed.pdf | 22 Sep 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TB form 1.pdf | 18 Sep 2021 |
| Declaration about Commencement CertificateFile: Tower B.pdf | 15 Sep 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Tower B_compressed.pdf | 15 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2A Form Tower B_compressed (1).pdf | 15 Sep 2021 |
| Disclosure of sold/ booked inventoryFile: Tower B.pdf | 15 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 Tower B Done.pdf | 15 Sep 2021 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: TB_compressed.pdf | 15 Sep 2021 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| BELMAC RESIDENCES B | BELMAC RESIDENCES Opposite Bramha Suncity Wadgaonsheri Pune. | 46 | Ongoing | Jun 2024 | Late, Jun 2025 |
| BELMAC RESIDENCES A | BELMAC RESIDENCES Opposite Bramha Suncity Wadgaonsheri Pune. | 45 | Completed | Dec 2021 | Oct 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 9 other registrations, which the RERA portal never shows together
- All 106 filed documents as one ZIP, foldered, with a manifest
Keep Belmac Residences B on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Pune
VJ IndiLife Kharadi
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
VJ Central Avenue
Vilas Javdekar Eco Homes
VJ IndiWorks Kharadi Central
Vilas Javdekar Eco Homes
RIVERDALE GRAND
DUVILLE ESTATES PRIVATE LIMITED
Yashwin Orizzonte Phase II
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
ZEN ESTATE
DESTINATION KHARADI DEVELOPERS LLP
Builder: SUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED
SUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED has 10 registrations on MahaRERA, including Belmac Residences E and Belmac Residences D. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record.
Frequently asked questions
What are my rights if Belmac Residences B is delayed beyond 14 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Belmac Residences B?
The registered promoter entity is SUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Belmac Residences B?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Belmac Residences B?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Belmac Residences B?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in Belmac Residences B?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback