Home / Browse projects / Belmac Residences A

Completed No litigation declared Residential / Group Housing project

Belmac Residences A

By SUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED

RG-MH-08993 · RERA P52100000899 · Last updated on MahaRERA portal: 1 Jun 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 9 other registrations and every project registered within 2 km.

See what the report covers Free either way: .
Dec 2022Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

Belmac Residences A is a Residential / Group Housing project by SUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED in PUNE, 411014, registered with MahaRERA as P52100000899 on 25 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2022.

At a glance

Project

  • NameBelmac Residences A
  • TypeResidential / Group Housing
  • Location
    • VADGAONSHERI
    • PUNE
    • 411014
  • Pincode411014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100000899
  • ReraGenie IDRG-MH-08993

Builder

  • NameSUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED
  • Entity typeCompany
  • Managing DirectorVIDIP VINOD JATIA
  • Other registrations9 more →
  • Completed10 of 10
  • Declared earlier projects2 →

Key dates

this monthRegisteredJul 2017PromisedDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Jul 2017
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed79 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Belmac Residences ANA180000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Jun 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Belmac Residences A: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 1 Jun 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed88

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots88
Closed/Covered88

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,360 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI4255.89
Proposed, not sanctioned4,256 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNARIMAN POINT, TULSIANA CHAMBERS, MUMBAI

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSangeeta Kalayan Mojage
EngineerSHRIMANT DYAMAGOL
Chartered AccountantMittal Agarwal & Company
PartnerRole in project
SUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED-

Litigation declared2

CaseCourtStatus
5272/2012Civil Judge Junior Division PuneDisposal of Suit application filed pending for order
5582/2012Civil Judge Junior Division PuneDisposal of Suit application filed pending for order

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Sep 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Dec 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Mar 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 29 Nov 2021

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 Tower A 30092021.pdf1 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 Tower A 31122021.pdf1 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Tower A 30092021.pdf1 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Tower A 31122021.pdf1 Jun 2023
Certificates of CA (Form 3)File: Form 3 Tower A 30092021.pdf8 May 2023
Certificates of CA (Form 3)File: Form 3 Tower A 31122021.pdf8 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A _ Tower A.pdf21 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RERA-Form-5 Tower A Belmac Residences.pdf6 Feb 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Index II - TA.pdf4 Mar 2022
Status of ConveyanceFile: Index II - TA.pdf4 Mar 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate - Tower A.PDF29 Nov 2021
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - Tower A.PDF29 Nov 2021
Certificates of CA (Form 3)File: Form 3 Tower A 310321.pdf1 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: TA_compressed (1).pdf22 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TA Form 1_compressed.pdf18 Sep 2021
Declaration about Commencement CertificateFile: Tower A.pdf15 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Tower A_compressed.pdf15 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Tower A_compressed.pdf15 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2A Form Tower A_compressed.pdf15 Sep 2021
Disclosure of sold/ booked inventoryFile: Tower A.pdf15 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 Tower A Done.pdf15 Sep 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: TA_compressed (1).pdf15 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Tower A compressed.pdf22 Apr 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Tower A_compressed.pdf22 Apr 2021
Certificates of CA (Form 3)File: Form 3 Tower A.pdf22 Apr 2021
Certificates of CA (Form 3)File: Form 3 Tower A.pdf22 Apr 2021
Certificates of CA (Form 3)File: Form 3 Tower A compressed.pdf22 Apr 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Tower A signed.pdf18 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Tower A signed.pdf18 Nov 2020
Certificates of CA (Form 3)File: FORM 5 Tower A.pdf18 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Tower A.pdf12 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Tower A.pdf12 Nov 2020
Certificates of CA (Form 5)File: Form 3 Tower A.pdf12 Nov 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 Tower A.pdf12 Oct 2020
Copy of the legal title reportFile: Compressed Title report Date 04 07 2020.pdf17 Sep 2020
Copy of the legal title reportFile: Title Certificate dated 04th July 2020.PDF3 Sep 2020
OtherFile: Abhijeet Certificate dated 02nd July 2020.PDF3 Sep 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Tower A.PDF12 Nov 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Tower A.pdf9 Nov 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Tower A.pdf9 Nov 2019
Certificates of CA (Form 3)File: Form 3 Tower A compressed.pdf9 Nov 2019
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certifcate_compressed.pdf9 Aug 2019
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_compressed.pdf9 Aug 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TA Form 1 Archi Cer 31122018.pdf17 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: TA_Form 2 Engi Cer 311218.pdf17 Apr 2019
Certificates of CA (Form 3)File: TA_Form 3 CA Rera Certificate 31122018.pdf17 Apr 2019
Building plan approvalFile: BP A.pdf8 Mar 2019
Building Plan Approval (IOD)File: BP A.pdf8 Mar 2019
Layout approvalFile: Layout Plan.PDF24 Dec 2018
Copy of Layout Approval (in case of layout)File: Layout Plan.PDF24 Dec 2018
Commencement Certificates / NA Order for plotted developmentFile: Comencement Certificate.pdf24 Dec 2018
Certificates of CA (Form 5)File: FORM 5 Tower A.pdf12 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 Tower A.pdf27 Jun 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Tower A.pdf27 Jun 2018
Certificates of CA (Form 3)File: FORM 3 Tower A.pdf27 Jun 2018
Layout approvalFile: layout final.pdf30 Jan 2018
Building plan approvalFile: Tower A Building plan.pdf30 Jan 2018
Copy of Layout Approval (in case of layout)File: layout final.pdf30 Jan 2018
Building Plan Approval (IOD)File: Tower A Building plan.pdf30 Jan 2018
Commencement Certificates / NA Order for plotted developmentFile: Building CC.pdf30 Jan 2018
Copy of the legal title reportFile: Supplymentry Report.pdf9 Jan 2018
Details of encumbrancesFile: Indenture of mortgage.pdf11 Dec 2017
Declaration in FORM BFile: SHHIL-Residence.pdf11 Dec 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.PDF5 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: compressed_TOWER A.pdf5 Oct 2017
Certificates of CA (Form 3)File: TOWER A.pdf5 Oct 2017
Certificates of CA (Form 3)File: CA Certificate- Tower A.pdf21 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cerificate Form-1.PDF20 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate- Signed.pdf20 Jul 2017
Building plan approvalFile: Building Plan Tower A.pdf14 Jul 2017
Building Plan Approval (IOD)File: Building Plan Tower A.pdf14 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate- Revised.pdf14 Jul 2017
Layout approvalFile: Layout Sanction_opt2.pdf8 Jul 2017
PAN CardFile: pan shhl.pdf8 Jul 2017
Copy of the legal title reportFile: Annexure B- Revised Title Certificate.pdf8 Jul 2017
Details of encumbrancesFile: No Encumbrances Certificate.pdf8 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout Sanction_opt2.pdf8 Jul 2017
Declaration in FORM BFile: download.pdf8 Jul 2017
Proforma of Allotment letterFile: Model Agreement.pdf8 Jul 2017

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
BELMAC RESIDENCES BBELMAC RESIDENCES Opposite Bramha Suncity Wadgaonsheri Pune.46OngoingJun 2024Late, Jun 2025
BELMAC RESIDENCES ABELMAC RESIDENCES Opposite Bramha Suncity Wadgaonsheri Pune.45CompletedDec 2021Oct 2021

Keep Belmac Residences A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUNE

2 kmBelmac Residences ACompleted 25Lapsed / revoked 9Other 25Dot size: filed unitsN

Filed coordinates, straight-line distance. 59 registered projects within 2 km.

Builder: SUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED

SUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED has 10 registrations on MahaRERA, including Belmac Residences E and Belmac Residences D. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record.

Frequently asked questions

What are my rights if Belmac Residences A is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Belmac Residences A?

The registered promoter entity is SUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Belmac Residences A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Belmac Residences A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Belmac Residences A?

The professionals named in the filing: Architect: Sangeeta Kalayan Mojage; Engineer: SHRIMANT DYAMAGOL; Chartered Accountant: Mittal Agarwal & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Belmac Residences A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Belmac Residences A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Belmac Residences A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.