ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Bellacasa Royale Tower N2

Registered No litigation declared Residential / Group Housing project

Bellacasa Royale Tower N2

By Rachana Developer

RG-MH-53195 · RERA P52100047308 · Last updated on MahaRERA portal: 27 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Internal walls, 75%
4 of 84Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 109 documents Report an error

Bellacasa Royale Tower N2 is a Residential / Group Housing project by Rachana Developer in Pune, Maharashtra, registered with MahaRERA as P52100047308 on 19 Oct 2022. Possession is promised by 31 Dec 2027. 80 of the 84 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameBellacasa Royale Tower N2
  • TypeResidential / Group Housing
  • Location
    • Sus Road
    • Sus Pune
    • Sus
    • Mulshi
    • Pune
    • 411021
  • Pincode411021
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100047308
  • ReraGenie IDRG-MH-53195

Builder

  • NameRachana Developer
  • Entity typePartnership
  • Other registrations1 more →

Key dates

this monthRegisteredOct 2022PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Oct 2022
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed109 files

Current status

95%80 of 84 units booked
88.5%Work done, per cost certificate

Figures as on 27 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing N2 of Tower N1 N2NA252184084

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 75%.

Wing N2 of Tower N1 N2: 67% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.55%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%

Progress on shared amenities15

As on 27 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes30%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed168

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots168
Closed/Covered168

Land and ownership7

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area253 sq m
Land owned byThe promoter, with other names on the file
Named landowners7
Encumbrance on the landDeclared none
Declared on31 May 2025
LandownerVillageDistrict
KALURAM TUKARAM CHANDERESusPune
KISHOR KAULRAM CHANDERESusPune
VIMAL KALURAM CHANDERESusPune
RUPALI DINESH GADESusPune
DEEPALI SANDEEP BORDESusPune
ANUSAYA DNYANESHWAR NAWALESusPune
NIRMALA DAULAT KAWADESusPune

Approvals and building plan

Sanctioning authorityPMRDA
Permissible FSI10546.11
Proposed, not sanctioned10,546 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI BANK LTD 3rd Floor, Ramchandra Sabha Mandap, Shivajinagar, Pune 411005
Estimated costRs 36.60 cr
Cost incurredRs 32.41 cr
Work done88.54%
BuildingWingEstimatedIncurred
Wing N2 of Tower N1 N2NARs 33.29 crRs 30.12 cr
-NARs 3.31 crRs 2.29 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVikas Arunkumar Achalkat
EngineerDhananjay Kisanrao Patil
EngineerPRAFUL SHRIGIRIWAR
EngineerJW Consultants LLP
Chartered AccountantD. V. Joshi
Chartered AccountantS P A K & Co.
PartnerRole in project
Rachana Developer-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Oct 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Jan 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed109

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 109 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A Tower N2.pdf27 Apr 2026
Withdrawal Update Form 1File: Form 1 Tower N1 Q4.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1 Tower N2 Q4.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 Tower N1 Q4.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 Tower N2 Q4.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 Tower N2 Q4.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 Tower N2 Q4.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1 N2 Q3.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 Engineers certi N2 Q3.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3 Tower N2 Q3 FY 202526.pdf20 Jan 2026
Building plan approvalFile: N1 N2 Refuge Floor.pdf14 Jan 2026
Building plan approvalFile: N1 N2 Elevation.pdf14 Jan 2026
Building plan approvalFile: N1 N2 9th Floor.pdf14 Jan 2026
Building plan approvalFile: N1 N2 1st to 21 st Floor.pdf14 Jan 2026
Layout approvalFile: IOD Plan 2025.pdf17 Oct 2025
Withdrawal Update Form 1File: Form 1 Tower N2 Q2.pdf17 Oct 2025
Withdrawal Update Form 2File: Form 2 Wing N2.pdf17 Oct 2025
Withdrawal Update Form 3File: Form 3 Q2 202526 Tower N2.pdf17 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 Tower N2 FY 2024-25.pdf20 Sep 2025
Building plan approvalFile: N1 N2 Refuge area floor.pdf25 Aug 2025
Building plan approvalFile: N1 N2 Elevation sec.pdf25 Aug 2025
Building plan approvalFile: N1 N2 9th Floor.pdf25 Aug 2025
Building plan approvalFile: N1-N2 1st to 21th Floor.pdf25 Aug 2025
Withdrawal Update Form 1File: Form 1 Tower N2 Type N1 N2.pdf24 Jul 2025
Withdrawal Update Form 2File: Form 2 N2.pdf24 Jul 2025
Withdrawal Update Form 3File: Form 3 Q1 Tower N2.pdf24 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: TOWER N 2.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Wing N2 of Tower type N1 N2.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Wing N2.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: BC ROYAL TOWER N2001.pdf18 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: N2 QA.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From-3 N2 Tower.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Wing N2 of Tower N1N2 (Form 1).pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From-2 N2.pdf15 Jan 2025
Disclosure of sold/ booked inventoryFile: BC TOWER-N2.pdf15 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QAC N2.pdf15 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rachana Developer_Tower N2_Form 3_23 11 2024.pdf6 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TOWER N2.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: TOWER N2001.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: N2 From2 30 8 24.pdf14 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: N2 FROM-5.pdf14 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QA cert N2 tower.pdf14 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: N2 FROM-5.pdf14 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 BC N2.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From-1 N2 Building.pdf22 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QA - N2.pdf22 Jul 2024
Details of encumbrances concerned to FinanceFile: Bella Casa_ Tower N2_ RERA_Legal and Litigation Encumbrance-RD.pdf19 Jul 2024
Details of encumbrances concerned to FinanceFile: Bella Casa_ Tower N2_ RERA_Finance Encumbrance.pdf19 Jul 2024
Details of encumbrances concerned to LegalFile: Bella Casa_ Tower N2_ RERA_Legal and Litigation Encumbrance-RD.pdf19 Jul 2024
Details of encumbrances concerned to LegalFile: Bella Casa_ Tower N2_ RERA_Finance Encumbrance.pdf19 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificates.pdf19 Jul 2024
Declaration about Commencement CertificateFile: Bella Casa_ Tower N2_ RERA_Declaration for Commencement-RD.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From-2 N2 Tower.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Tower N2 Form-2 30 6 24.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: N2 From-3.pdf19 Jul 2024
Proforma of Allotment letterFile: 04_Allotment Letter- Final-N2 Building.pdf19 Jul 2024
Proforma of Agreement for saleFile: 01_Final Draft-Bella Casa_N2_ Agreement.pdf19 Jul 2024
Deviation Report with respect to Allotment letterFile: Bella Casa_ Tower N2_ RERA_Deviation for Allotment Letter.pdf19 Jul 2024
Deviation Report with respect to model copy of AgreementFile: Bella Casa_ Tower N2_ RERA_Deviation for AFS-RD.pdf19 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Bella Casa_ Tower N2- RERA_ Annexure A- Disclousure of Interest in other real estate Organ8 Jul 2024
Details of encumbrances concerned to FinanceFile: N2 Tower.pdf14 Jun 2024
Details of encumbrances concerned to LegalFile: N2 Tower.pdf14 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Bellacasa Royla tower N 2.pdf26 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Bellacasa Tower N2.pdf26 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BC-N2 FINANCIAL PROGRESS001_compressed.pdf26 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From-2 N2 Tower.pdf23 Apr 2024
Disclosure of sold/ booked inventoryFile: BELLA CASA ROYAL TOWER N2.pdf15 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From-1 N2.pdf12 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM-1 Tower - N2.pdf31 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From-2 N2 Tower.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower N2.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TowerN-2 From-1.pdf22 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: N2 From -3.pdf6 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From-2 N2 Building.pdf2 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 - Form 3.pdf2 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 - Form 3.pdf2 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: N2 From 5.pdf26 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower N-2.pdf25 Aug 2023
Disclosure of sold/ booked inventoryFile: N2 TOWER - INVENTORY DETAILS.pdf25 Aug 2023
Disclosure of sold/ booked inventoryFile: BC N2 DISCLOSURE OF SOLDD.pdf23 May 2023

How this compares with Pune

95%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Bellacasa Royale Tower N2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sus Pune13,700+ in Pune

2 kmBellacasa Royale Tower NCompleted 163Lapsed / revoked 119Other 151Dot size: filed unitsN

Filed coordinates, straight-line distance. 433 registered projects within 2 km.

Builder: Rachana Developer

Rachana Developer has 2 registrations on MahaRERA, including Bellacasa Royale Tower N2 and Bella Casa Royale Tower/Type O. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Bellacasa Royale Tower N2 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Bellacasa Royale Tower N2?

The registered promoter entity is Rachana Developer, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Bellacasa Royale Tower N2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Bellacasa Royale Tower N2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Bellacasa Royale Tower N2?

The professionals named in the filing: Architect: Vikas Arunkumar Achalkat; Engineer: Dhananjay Kisanrao Patil; Engineer: PRAFUL SHRIGIRIWAR; Engineer: JW Consultants LLP; Chartered Accountant: D. V. Joshi; Chartered Accountant: S P A K & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Bellacasa Royale Tower N2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Bellacasa Royale Tower N2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Bellacasa Royale Tower N2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.