ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / BELLACASA ROYALE TOWER B/ TYPE B

Completed No litigation declared Residential / Group Housing project

BELLACASA ROYALE TOWER B/ TYPE B

By Rachana Lifespaces

RG-MH-22023 · RERA P52100030088 · Last updated on MahaRERA portal: 22 Jan 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Basement (if any), 0%
3 of 135Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 120 documents Report an error

BELLACASA ROYALE TOWER B/ TYPE B is a Residential / Group Housing project by Rachana Lifespaces in Pune, Maharashtra, registered with MahaRERA as P52100030088 on 29 Jul 2021. The registration is recorded completed; possession was promised by 31 Dec 2026. 132 of the 135 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameBELLACASA ROYALE TOWER B/ TYPE B
  • TypeResidential / Group Housing
  • Location
    • INTERNAL ROAD
    • SUS
    • Mulshi
    • Pune
    • 411021
  • Pincode411021
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100030088
  • ReraGenie IDRG-MH-22023

Builder

  • NameRachana Lifespaces
  • Entity typePartnership
  • PartnersNISHANT SUSHIL PATIL, VASUNDHARA SUSHIL PATIL
  • Other registrations3 more →
  • Completed3 of 4
  • Declared earlier projects2 →

Key dates

this monthRegisteredJul 2021PromisedDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Jul 2021
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed120 files

Current status

98%132 of 135 units booked
100.0%Work done, per cost certificate

Figures as on 22 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BELLACASA ROYALE TOWER B/ TYPE BNA26231323135

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

BELLACASA ROYALE TOWER B/ TYPE B: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 22 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed132

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots132
Closed/Covered132

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area725 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared none
Declared on4 Oct 2024
LandownerVillageDistrict
ARCHANA SOMNATH DHANKUDEBanerPune
DEEPAK SITARAM SASARPashanPune
GANESH HANUMANT SUTARSusPune
SMITA DEEPAK SASARPashanPune
SUNANDA BHASKAR THUBEKothrudPune

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority
Permissible FSI16586.46
Proposed, not sanctioned16,586 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank ltd,3rd Floor, Ramchandra Sabha Mandap, Shivajinagar, Pune 411005
Estimated costRs 57.08 cr
Cost incurredRs 57.08 cr
Work done100.0%
BuildingWingEstimatedIncurred
BELLACASA ROYALE TOWER B/ TYPE BNARs 53.15 crRs 53.15 cr
-NARs 3.93 crRs 3.93 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVikas Arunkumar Achalkat
EngineerDhananjay Kisanrao Patil
Chartered AccountantD V Joshi
Chartered AccountantS P A K & CO
PartnerRole in project
Rachana Lifespaces-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jul 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Jan 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Jan 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed120

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 120 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: 01 of 53 Layout 2024 Tower B.pdf22 Jan 2026
Occupational CertificateFile: Bella Casa Tower B - RERA Declaration.pdf22 Jan 2026
Occupational CertificateFile: Bella Casa OC for Tower A and Tower B OC Highted Copy for Tower B details.pdf22 Jan 2026
Layout approvalFile: 01 of 53 Layout 2024 Tower B.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1 Tower B Q3.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 Tower B Q3.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3 Tower B Q3 FY 202526.pdf20 Jan 2026
Building plan approvalFile: 01 of 53 Layout 2024.pdf9 Jan 2026
Occupational CertificateFile: PMRDA email to RERA Bella Casa Tower A and Tower B Verification of OC.pdf9 Jan 2026
Layout approvalFile: IOD Plan 2025.pdf17 Oct 2025
Withdrawal Update Form 1File: Form 1 Tower B Q2.pdf17 Oct 2025
Withdrawal Update Form 2File: Form 2 Tower B.pdf17 Oct 2025
Withdrawal Update Form 3File: Form 3 Q2 202526 Tower B.pdf17 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 Tower B FY 2024-25.pdf20 Sep 2025
Withdrawal Update Form 1File: Form 1 Tower B.pdf24 Jul 2025
Withdrawal Update Form 2File: Form 2 Tower B.pdf24 Jul 2025
Withdrawal Update Form 3File: Form 3 B Tower.pdf24 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: TOWER B (2).pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower B.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: B Tower.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: BC ROYAL TOWER B001.pdf18 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: B tower QA.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From3 B Tower.pdf20 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QA tower B.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: B Tower (Form 1).pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate B Tower.pdf15 Jan 2025
Disclosure of sold/ booked inventoryFile: BC TOWER-B.pdf15 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rachanalifespaces_Tower B_Form 3_23 11 2024.pdf6 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From-3 Tower B.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From-2 30 Sep 24.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TOWER B.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: TOWER B001.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From-2 B.pdf14 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QA cert B tower.pdf14 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: B FROM-5.pdf14 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 BC Tower B1.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From-1.pdf22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: B Tower From-2.pdf22 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QA - B From2A.pdf22 Jul 2024
Details of encumbrances concerned to FinanceFile: Bella Casa_ Tower B_ RERA_Finance Encumbrance.pdf18 Jul 2024
Details of encumbrances concerned to LegalFile: Bella Casa_ Tower B_ RERA_Finance Encumbrance.pdf18 Jul 2024
Declaration about Commencement CertificateFile: Bella Casa_ Tower B_ RERA_Declaration for Commencement-RLS.pdf18 Jul 2024
Proforma of Agreement for saleFile: 01_Agreement_B building.pdf18 Jul 2024
Proforma of Allotment letterFile: 04_Allotment Letter- Final-B Building.pdf18 Jul 2024
Building plan approvalFile: B 17th to 20th Floor.pdf5 Jul 2024
Building plan approvalFile: B - Elevation and Section.pdf5 Jul 2024
Building plan approvalFile: Layout Ph-III.pdf5 Jul 2024
Details of encumbrances concerned to FinanceFile: Bella Casa_ Tower B_ RERA_Legal and Litigation Encumbrance-RLS.pdf5 Jul 2024
Details of encumbrances concerned to LegalFile: Bella Casa_ Tower B_ RERA_Legal and Litigation Encumbrance-RLS.pdf5 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: B 17th to 20th Floor.pdf5 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: B - Elevation and Section.pdf5 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Layout Ph-III.pdf5 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificates.pdf5 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bella Casa_ Tower B_ RERA_Form 3.pdf5 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Bella Casa_ Tower B_ RERA_ Disclousure of Interest in other real estate org-RLS.pdf5 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: BC Tower B 100_.pdf5 Jul 2024
Deviation Report with respect to Allotment letterFile: Bella Casa_ Tower B_ RERA_Deviation of Allotment Letter-RLS.pdf5 Jul 2024
Deviation Report with respect to model copy of AgreementFile: Bella Casa_ Tower B_ RERA_Deviation for AFS.pdf5 Jul 2024
Other - FinanceFile: B Tower.pdf14 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Bellacasa Royal B Tower.pdf26 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Bellacasa Royal Tower B.pdf26 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From-3 Tower B_compressed.pdf24 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: B Tower From-2.pdf23 Apr 2024
Disclosure of sold/ booked inventoryFile: BELLA CASA ROYAL TOWER B.pdf15 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From-1 B Building.pdf12 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From-1 B.pdf31 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From-2 Tower B.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From-3B.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower - B From-1.pdf22 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From-2.pdf2 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Tower B.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: B-Tower.pdf25 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf25 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf25 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Tower - B.pdf22 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 (Form - A ).pdf19 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1(Tower - B).pdf19 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From-2 B Tower.pdf15 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Bellacasa Tower B.pdf15 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 _ Expenses Feb.pdf27 Feb 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
BELLACASASUS229CompletedDec 2020Oct 2017

How this compares with Pune

98%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BELLACASA ROYALE TOWER B/ TYPE B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SUS13,700+ in Pune

2 kmBELLACASA ROYALE TOWER BCompleted 101Lapsed / revoked 32Other 59Dot size: filed unitsN

Filed coordinates, straight-line distance. 192 registered projects within 2 km.

Builder: Rachana Lifespaces

Rachana Lifespaces has 4 registrations on MahaRERA, including Bellacasa and BELLACASA ROYALE TOWER / TYPE 'A'. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if BELLACASA ROYALE TOWER B/ TYPE B is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BELLACASA ROYALE TOWER B/ TYPE B?

The registered promoter entity is Rachana Lifespaces, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BELLACASA ROYALE TOWER B/ TYPE B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BELLACASA ROYALE TOWER B/ TYPE B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BELLACASA ROYALE TOWER B/ TYPE B?

The professionals named in the filing: Architect: Vikas Arunkumar Achalkat; Engineer: Dhananjay Kisanrao Patil; Chartered Accountant: D V Joshi; Chartered Accountant: S P A K & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BELLACASA ROYALE TOWER B/ TYPE B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BELLACASA ROYALE TOWER B/ TYPE B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BELLACASA ROYALE TOWER B/ TYPE B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.