ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / BALAJI ESTATE

Registration lapsed No litigation declared Residential / Group Housing project

BALAJI ESTATE

By M/s. Sai Balaji Buildcon

RG-MH-29200 · RERA P51700027980 · Last updated on MahaRERA portal: 3 Jul 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 3 months past the filed date
  • 9 complaints at MahaRERA
  • Completion date moved by 13 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jul 2026Possession promised3 months past this date
19 of 33Construction stages doneacross 3 buildings; furthest along: External plumbing and external plaster, 95%
40 of 64Units unsoldnot recorded sold or booked
9Complaints at MahaRERAon this registration
Jump to the 130 documents Report an error

BALAJI ESTATE is a Residential / Group Housing project by M/s. Sai Balaji Buildcon in Thane, Maharashtra, registered with MahaRERA as P51700027980 on 21 Jan 2021. Possession was promised by 31 Jul 2026 and is now 3 months past that date. The completion date has moved by 13 months from the original filing. 24 of the 64 units on this registration are recorded sold or booked, and 19 of 33 construction stages are filed complete. 9 complaints are on record with the regulator.

At a glance

Project

  • NameBALAJI ESTATE
  • TypeResidential / Group Housing
  • Location
    • Khoni - Umbroli Road off Kalyan Shilphata Road
    • Umbroli
    • Kalyan-Dombivali (M Corp.)
    • Kalyan
    • Thane
    • 421204
  • Pincode421204
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700027980
  • ReraGenie IDRG-MH-29200

Builder

  • NameM/s. Sai Balaji Buildcon
  • Entity typePartnership
  • PartnersManilal Mulji Patel, Amit Shantilal Rangani, Maruti Ganpat Padwal, Shree Sawan Warehousing and properties Private Limited, Jaynil sharad Shah
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

3 months past promisethis monthRegisteredJan 2021First promiseJun 2025Revised toJul 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on21 Jan 2021
  • Promised completion31 Jul 2026
  • Revised completionRevised to 31 Jul 2026 (originally 30 Jun 2025)
  • Buildings3 building records
  • Documents filed130 files

Current status

38%24 of 64 units booked
91.0%Work done, per cost certificate

Figures as on 3 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Balaji Estate - BlossomNA202081220
Balaji Estate - JoyNA242024024
Balaji Estate - IconNA202020020

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 3 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

19 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is External plumbing and external plaster, at 95%.

Balaji Estate - Blossom85%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%
Balaji Estate - Joy84%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%
Balaji Estate - Icon82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 3 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed37

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots37
Closed/Covered3
Open Space34
BuildingClosed/CoveredOpen SpaceTotal
Balaji Estate - Blossom11011
Balaji Estate - Joy11213
Balaji Estate - Icon11213

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,080 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 May 2025
LandownerVillageDistrict
Gurunath B BhoirDOMBIVLIThane
Shama Chango BhoirKhoniThane
Indirabai BhoirDOMBIVLIThane

Approvals and building plan

Sanctioning authorityKalyan Dombivli Municipal Corporation
Permissible FSI13091.19
Proposed, not sanctioned5,181 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch41 Sector 11 CBD Belapur Navi Mumbai Maharashtra 400614
Estimated costRs 125.34 cr
Cost incurredRs 114.06 cr
Work done91.0%
BuildingWingEstimatedIncurred
-NARs 62.67 crRs 57.03 cr
Balaji Estate - JoyNARs 21.69 crRs 19.74 cr
Balaji Estate - BlossomNARs 20.81 crRs 18.93 cr
Balaji Estate - IconNARs 20.17 crRs 18.36 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSthapatya Nirmaan
EngineerSahil Raju Bana
EngineerBrijesh Bhagat
Chartered AccountantRahul Bera
Chartered AccountantShripati Gandhi and Co
Chartered AccountantKapure and Kapure
PartnerRole in project
M/s. Sai Balaji Buildcon-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA06062501451Jun 2025 → Feb 2026

Reason as filed by the promoterAs per the attachment

EA14022619839Jun 2025 → Jul 2026

Reason as filed by the promoterThe project is going to expire as on 28/02/2026 after which we shall not be able to register Agreement to Sale as well as we will not be able to receive further instalments from the financial institutions/allottes which shall badly effecting cash flows. Besides this, we shall be facing numerous operational difficulties due to cease of the RERA registration.The main reason for the delay is pace of sales being lower than expected and thereby effecting the cash flows of the project. Lower than expected cash flows has in turn effected the pace of construction of the project thereby making it impos

Complaints filed with MahaRERA9

Case no.ComplainantRespondentFiled
CC12604950Swapnil PatilM/s. Sai Balaji Buildcon05/08/2026
CC12605011AMIT Eknath LAWANDM/s. Sai Balaji Buildcon06/08/2026
CC12604960Sameer Prabhakar SawantM/s. Sai Balaji Buildcon05/08/2026
CC12604959Deepak Ramchandra BolkeM/s. Sai Balaji Buildcon05/08/2026
CC12604961Santoshi Maharajdeen YadavM/s. Sai Balaji Buildcon05/08/2026
CC12604958NIKESH MADHUKAR HINDURAOM/s. Sai Balaji Buildcon05/08/2026
CC12605010Sneha Ramakrishnan NairM/s. Sai Balaji Buildcon06/08/2026
CC12605030Vidya Tushar ChandorkarM/s. Sai Balaji Buildcon07/08/2026
CC12605408Ekta Rajendra JatharM/s. Sai Balaji Buildcon23/08/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Jan 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 May 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Jan 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 May 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed130

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 130 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form -2A Balaji EstateI March 2026.pdf3 Jul 2026
Withdrawal Update Form 1File: PH 1 Engineers Certificate 31-03-2026.pdf29 Jun 2026
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE PH 1 310326.pdf29 Jun 2026
Withdrawal Update Form 2File: PH 1 Engineers Certificate 31-03-2026.pdf29 Jun 2026
Withdrawal Update Form 2File: PH 1 Engineers Certificate 31-03-2026.pdf29 Jun 2026
Withdrawal Update Form 3File: Form 3 March 26_compressed (1).pdf29 Jun 2026
Withdrawal Update Form 3File: Form 3 March 26_compressed (1).pdf29 Jun 2026
Form 5 (FY 2024-2025)File: Form 5 - Balaji Buildcon FY 2024-25.pdf20 Feb 2026
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE PH 1 31-12-2025.pdf13 Feb 2026
Withdrawal Update Form 2File: form 2 Dec 25.pdf13 Feb 2026
Withdrawal Update Form 3File: Form 3 Dec 25.pdf13 Feb 2026
Form 2A (FY 2024-2025)File: Form -2A PH -1.pdf10 Feb 2026
Withdrawal Update Form 1File: balaji estate ( sn 78 ).pdf13 Nov 2025
Withdrawal Update Form 1File: balaji estate ( sn 78 ).pdf13 Nov 2025
Withdrawal Update Form 2File: Engineer Cerrtificate 300920235PH 1.pdf13 Nov 2025
Withdrawal Update Form 2File: Engineer Cerrtificate 300920235PH 1.pdf13 Nov 2025
Withdrawal Update Form 3File: BALAJI PHASE 1 FORM 3.pdf13 Nov 2025
Withdrawal Update Form 3File: BALAJI PHASE 1 FORM 3.pdf13 Nov 2025
Withdrawal Update Form 1File: Form 1 phase I June 25.pdf12 Sep 2025
Withdrawal Update Form 2File: Engineer Cerrtificate PH 1 June 25.pdf12 Sep 2025
Withdrawal Update Form 3File: Form 3 - CA certificate-Phase 1 June 25_compressed.pdf12 Sep 2025
Form 1File: PH 1 Architect Certificate 31032025_compressed.pdf16 Jul 2025
Form 2File: PH 1 31032025.pdf16 Jul 2025
Form 3File: Sai Balaji Buildcon Form 3_compressed.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory 31032025_compressed.pdf16 Jul 2025
Form 1File: PH 1 Architect Certificate 31122024_compressed.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: 31122024 PH 1_compressed.pdf16 Jul 2025
Form 2File: 31-12-2024.pdf16 Jul 2025
Form 3File: PH 1-FORM 3_31-12-2024_compressed.pdf16 Jul 2025
Form 1File: PH 1 Architect Certficate 30092024_compressed.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: 30092024 PH 1_compressed.pdf16 Jul 2025
Form 2File: 30-09-2024.pdf16 Jul 2025
Form 3File: PH 1-FORM 3_30-09-2024_compressed.pdf16 Jul 2025
Form 3File: PH 1-FORM 3_30-06-2024_compressed.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: 30062024 PH 1_compressed.pdf16 Jul 2025
Form 1File: Form 1 June 2024.pdf16 Jul 2025
Form 2File: 30-06-2024_compressed.pdf16 Jul 2025
Form 2A (FY 2020-2021)File: Engin Certif 31-03-2021.pdf16 Jul 2025
Form 2A (FY 2021-2022)File: Engin Certif 31-03-2022.pdf16 Jul 2025
Form 2A (FY 2022-2023)File: Engin Certif 31-03-2023.pdf16 Jul 2025
Form 2A (FY 2023-2024)File: Form -2A PH- 1 31032024_compressed.pdf16 Jul 2025
Form 5 (FY 2021-2022)File: Form 5 01042021 To 31032022.pdf16 Jul 2025
Form 5 (FY 2022-2023)File: Form 5 - Balaji Buildcon FY 2022-23-1.pdf16 Jul 2025
Form 5 (FY 2023-2024)File: Form 5 - Balaji Buildcon FY 2023-24- 1.pdf16 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PH 1 Architect Certificate 31032025_compressed.pdf15 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sai Balaji Buildcon Form 3_compressed-1-12.pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PH 1 31032025_compressed.pdf15 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Inventory 31032025_compressed.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PH 1 Architect Certificate 31122024_compressed.pdf13 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PH 1 Architect Certficate 30092024_compressed.pdf13 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PH 1-FORM 3_30-06-2023_compressed.pdf13 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PH 1-FORM 3_31-03-2023_compressed.pdf13 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PH 1-FORM 3_30-09-2023_compressed.pdf13 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PH 1-FORM 3_31-12-2023_compressed.pdf13 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PH 1-FORM 3_31-03-2023_compressed.pdf13 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PH 1-FORM 3_30-06-2024_compressed.pdf13 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PH 1-FORM 3_30-09-2024_compressed.pdf13 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PH 1-FORM 3_31-12-2024_compressed.pdf13 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30-09-2024_compressed.pdf13 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31-12-2024_compressed.pdf13 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Sai Balaji Buildcon Form 5 21.pdf13 Apr 2025
Disclosure of sold/ booked inventoryFile: 300623 PH 1_compressed.pdf13 Apr 2025
Disclosure of sold/ booked inventoryFile: 30092023 PH 1_compressed.pdf13 Apr 2025
Disclosure of sold/ booked inventoryFile: 31032023 PH 1_compressed.pdf13 Apr 2025
Disclosure of sold/ booked inventoryFile: 31122023 PH 1_compressed.pdf13 Apr 2025
Disclosure of sold/ booked inventoryFile: 31032024 PH 1_compressed.pdf13 Apr 2025
Disclosure of sold/ booked inventoryFile: 30062024 PH 1_compressed.pdf13 Apr 2025
Disclosure of sold/ booked inventoryFile: 30092024 PH 1_compressed.pdf13 Apr 2025
Disclosure of sold/ booked inventoryFile: 31122024 PH 1_compressed.pdf13 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Sai Balji Buildcon From 5 22.pdf13 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Balaji Buildcon FY 2022-23-1.pdf13 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Balaji Buildcon FY 2022-23-1.pdf13 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Balaji Buildcon FY 2023-24- 1.pdf13 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Phase I.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Phase I.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certif 31122023_compressed.pdf4 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architec Certficat 30032024_compressed.pdf4 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form -2A PH- 1 31032024_compressed.pdf4 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PH -1 31032021_compressed.pdf4 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PH 1 30062021_compressed.pdf4 May 2024

How this compares with Thane

38%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 13 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BALAJI ESTATE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Umbroli7,600+ in Thane

2 kmBALAJI ESTATECompleted 94Lapsed / revoked 82Other 139Dot size: filed unitsN

Filed coordinates, straight-line distance. 315 registered projects within 2 km.

Builder: M/s. Sai Balaji Buildcon

M/s. Sai Balaji Buildcon has 2 registrations on MahaRERA, including BALAJI ESTATE and BALAJI ESTATE PHASE 2. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that BALAJI ESTATE shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if BALAJI ESTATE is delayed beyond 31 Jul 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BALAJI ESTATE?

The registered promoter entity is M/s. Sai Balaji Buildcon, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BALAJI ESTATE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against BALAJI ESTATE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for BALAJI ESTATE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BALAJI ESTATE?

The professionals named in the filing: Architect: Sthapatya Nirmaan; Engineer: Sahil Raju Bana; Engineer: Brijesh Bhagat; Chartered Accountant: Rahul Bera; Chartered Accountant: Shripati Gandhi and Co; Chartered Accountant: Kapure and Kapure. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BALAJI ESTATE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BALAJI ESTATE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BALAJI ESTATE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.