Home / Browse projects / Pune, Maharashtra / Axisa D Wing

Registration lapsed No litigation declared Residential / Group Housing project

Axisa D Wing

By Maheshwari Developers

RG-MH-15973 · RERA P52100024645 · Last updated on MahaRERA portal: 11 Feb 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 31 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2024Possession promised31 months past this date
1 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
28 of 88Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 111 documents Report an error

Axisa D Wing is a Residential / Group Housing project by Maheshwari Developers in Pune, Maharashtra, registered with MahaRERA as P52100024645 on 26 Feb 2020. Possession was promised by 30 Mar 2024 and is now 31 months past that date. 60 of the 88 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameAxisa D Wing
  • TypeResidential / Group Housing
  • Location
    • NA
    • Kiwale
    • Kivale
    • Mawal
    • Pune
    • 412101
  • Pincode412101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100024645
  • ReraGenie IDRG-MH-15973

Builder

  • NameMaheshwari Developers
  • Entity typePartnership
  • PartnersRamkumar Jayram Sharma, Sachin Vasant Jare
  • Other registrations8 more →
  • Completed2 of 9
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

31 months past promisethis monthRegisteredFeb 2020PromisedMar 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on26 Feb 2020
  • Promised completion30 Mar 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed111 files

Current status

68%60 of 88 units booked

Figures as on 11 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Axisa D WingNA11888088

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

Axisa D Wing: 46% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor10%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed76

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots76
Closed/Covered30
Open Space46

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,190 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Feb 2026
LandownerVillageDistrict
Dashrath Pandurang SalunkePimpri Chinchawad (M Corp.)Pune
Edifice Infrastructure Private LimitedMumbai CityMumbai City
Uday Uttamrao NimbalkarPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Permissible FSI6009.0
Proposed, not sanctioned3,509 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKalyani Chambers Plot 80 Sector 27

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr.Amol Khandagale
EngineerSANTOSH PADSAGALE
EngineerParul Vilas Asekar
Chartered AccountantCA Vivek Lahoti
Chartered AccountantDnyaneshwar P Gopale
Chartered AccountantCA Ganesh Sunil Mandlecha
Chartered AccountantNpsr & Associates
PartnerRole in project
Maheshwari Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Feb 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Oct 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Oct 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 29 Nov 2024

Documents filed111

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 111 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: form 1.pdf11 Feb 2026
Form 2File: Form 2 Engineer Certificate Q4.pdf11 Feb 2026
Form 3File: FORM 3_11zon (6).pdf11 Feb 2026
Disclosure of Sold and Booked InventoryFile: Doscloser of statement of sold and unsoled Q4.pdf11 Feb 2026
Form 1File: form 1.pdf11 Feb 2026
Form 2File: Form 2 Engineer Certificate Q1.pdf11 Feb 2026
Form 3File: Form 3 30062020 11zon.pdf11 Feb 2026
Disclosure of Sold and Booked InventoryFile: Doscloser of statement of sold and unsoled.pdf11 Feb 2026
Form 1File: form 1.pdf11 Feb 2026
Form 2File: Form 2 Engineer Certificate Q2.pdf11 Feb 2026
Disclosure of Sold and Booked InventoryFile: Doscloser of statement of sold and unsoled.pdf11 Feb 2026
Form 3File: Form 3 30092020_11zon.pdf11 Feb 2026
Form 1File: form 1.pdf11 Feb 2026
Form 2File: Form 2 Engineer Certificate Q3.pdf11 Feb 2026
Disclosure of Sold and Booked InventoryFile: Doscloser of statement of sold and unsoled.pdf11 Feb 2026
Form 3File: Form 3 31122020_11zon.pdf11 Feb 2026
Form 1File: form 1.pdf11 Feb 2026
Form 2File: Form 2 Engineer Certificate Q4.pdf11 Feb 2026
Form 3File: FORM 3 310321 11zon.pdf11 Feb 2026
Disclosure of Sold and Booked InventoryFile: Doscloser of statement of sold and unsoled.pdf11 Feb 2026
Form 1File: form 1.pdf11 Feb 2026
Form 2File: Form 2 Engineer Certificate Q1.pdf11 Feb 2026
Disclosure of Sold and Booked InventoryFile: Doscloser of statement of sold and unsoled.pdf11 Feb 2026
Form 3File: Form 3 30062021_11zon (1).pdf11 Feb 2026
Form 1File: form 1.pdf11 Feb 2026
Form 2File: Form 2 Engineer Certificate Q1.pdf11 Feb 2026
Disclosure of Sold and Booked InventoryFile: Doscloser of statement of sold and unsoled.pdf11 Feb 2026
Form 3File: Form 3 30092021_11zon.pdf11 Feb 2026
Form 1File: form 1.pdf11 Feb 2026
Form 2File: Form 2 Engineer Certificate Q3.pdf11 Feb 2026
Disclosure of Sold and Booked InventoryFile: Doscloser of statement of sold and unsoled.pdf11 Feb 2026
Form 3File: Form 3 31122021_11zon.pdf11 Feb 2026
Form 1File: FORM 1.pdf11 Feb 2026
Form 2File: Form 2 Engineer Certificate Q4.pdf11 Feb 2026
Disclosure of Sold and Booked InventoryFile: Doscloser of statement of sold and unsoled.pdf11 Feb 2026
Form 3File: Form 3 31032022_11zon.pdf11 Feb 2026
Form 1File: FORM 1.pdf11 Feb 2026
Form 2File: Form 2 Engineer Certificate Q1.pdf11 Feb 2026
Disclosure of Sold and Booked InventoryFile: Doscloser of statement of sold and unsoled.pdf11 Feb 2026
Form 3File: Form 3 30062022_11zon.pdf11 Feb 2026
Form 1File: FORM 1.pdf11 Feb 2026
Form 2File: Form 2 Engineer Certificate Q2.pdf11 Feb 2026
Disclosure of Sold and Booked InventoryFile: Doscloser of statement of sold and unsoled.pdf11 Feb 2026
Form 3File: Form 3 30092022_11zon.pdf11 Feb 2026
Form 1File: FORM 1.pdf11 Feb 2026
Form 2File: Form 2 Engineer Certificate Q3.pdf11 Feb 2026
Disclosure of Sold and Booked InventoryFile: Doscloser of statement of sold and unsoled.pdf11 Feb 2026
Form 3File: Form 3 31122022_11zon.pdf11 Feb 2026
Form 1File: FORM 1.pdf11 Feb 2026
Form 2File: Form 2 Engineer Certificate Q4.pdf11 Feb 2026
Disclosure of Sold and Booked InventoryFile: Doscloser of statement of sold and unsoled.pdf11 Feb 2026
Form 3File: Form 3 31032023_11zon.pdf11 Feb 2026
Form 1File: form 1.pdf11 Feb 2026
Form 2File: Form 2 Engineer Certificate Q1.pdf11 Feb 2026
Form 3File: Form 3 30062023_11zon.pdf11 Feb 2026
Disclosure of Sold and Booked InventoryFile: Doscloser of statement of sold and unsoled.pdf11 Feb 2026
Form 1File: form 1.pdf11 Feb 2026
Form 2File: Form 2 Engineer Certificate Q2.pdf11 Feb 2026
Form 3File: Form 3 30092023_11zon.pdf11 Feb 2026
Disclosure of Sold and Booked InventoryFile: Doscloser of statement of sold and unsoled.pdf11 Feb 2026
Form 1File: form 1.pdf11 Feb 2026
Form 2File: Form 2 Engineer Certificate Q3.pdf11 Feb 2026
Disclosure of Sold and Booked InventoryFile: Doscloser of statement of sold and unsoled.pdf11 Feb 2026
Form 3File: Form 3 31122023_11zon.pdf11 Feb 2026
Form 1File: form 1.pdf11 Feb 2026
Form 2File: Form 2 Engineer Certificate Q4.pdf11 Feb 2026
Disclosure of Sold and Booked InventoryFile: Doscloser of statement of sold and unsoled.pdf11 Feb 2026
Form 3File: Form 3 31032024.pdf11 Feb 2026
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf3 Dec 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: REGISTRATION CERTIFICATE- Axisa D.pdf29 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate-AXISA D WING.pdf29 Nov 2024
Layout approvalFile: Main Layout_compressed.pdf6 Oct 2022
Building plan approvalFile: BP 1_compressed.pdf6 Oct 2022
Building plan approvalFile: BP 2_compressed.pdf6 Oct 2022
Building plan approvalFile: BP 3_compressed.pdf6 Oct 2022
Details of encumbrances concerned to LegalFile: Legal Declaration.pdf6 Oct 2022
Copy of Layout Approval (in case of layout)File: Main Layout_compressed.pdf6 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: BP 1_compressed.pdf6 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: BP 2_compressed.pdf6 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: BP 3_compressed.pdf6 Oct 2022

How this compares with Pune

68%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Axisa D Wing on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kiwale13,700+ in Pune

2 kmAxisa D WingCompleted 64Lapsed / revoked 40Other 105Dot size: filed unitsN

Filed coordinates, straight-line distance. 209 registered projects within 2 km.

Builder: Maheshwari Developers

Maheshwari Developers has 9 registrations on MahaRERA, including Axisa and Suvarna Nagari. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Axisa D Wing shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Axisa D Wing is delayed beyond 30 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Axisa D Wing?

The registered promoter entity is Maheshwari Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Axisa D Wing?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Axisa D Wing?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Axisa D Wing?

The professionals named in the filing: Architect: Mr.Amol Khandagale; Engineer: SANTOSH PADSAGALE; Engineer: Parul Vilas Asekar; Chartered Accountant: CA Vivek Lahoti; Chartered Accountant: Dnyaneshwar P Gopale; Chartered Accountant: CA Ganesh Sunil Mandlecha. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Axisa D Wing?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Axisa D Wing. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Axisa D Wing to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.