ReraGenieLog inGet a buyer report

Home / Browse projects / Ratnagiri, Maharashtra / AVISHKAR HEIGHTS - A WING - PHASE II

Registration lapsed No litigation declared Residential / Group Housing project

AVISHKAR HEIGHTS - A WING - PHASE II

By AVISHKAR DEVELOPERS

RG-MH-10408 · RERA P52800002837 · Last updated on MahaRERA portal: 4 May 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 34 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.
Dec 2023Possession promised34 months past this date
0 of 11Construction stages donefurthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 134 documents Report an error

AVISHKAR HEIGHTS - A WING - PHASE II is a Residential / Group Housing project by AVISHKAR DEVELOPERS in Ratnagiri, Maharashtra, registered with MahaRERA as P52800002837 on 4 Aug 2017. Possession was promised by 30 Dec 2023 and is now 34 months past that date.

At a glance

Project

  • NameAVISHKAR HEIGHTS - A WING - PHASE II
  • TypeResidential / Group Housing
  • Location
    • Jalgaon
    • Dapoli
    • Ratnagiri
    • 415712
  • Pincode415712
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52800002837
  • ReraGenie IDRG-MH-10408

Builder

  • NameAVISHKAR DEVELOPERS
  • Entity typePartnership
  • PartnersSANTOSH GIMHAVANEKAR, PRIYADARSHAN KOPARKAR, CHANDRASHEKHAR BHOSALE
  • Other registrations3 more →
  • Completed2 of 4
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

34 months past promisethis monthRegisteredAug 2017PromisedDec 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on4 Aug 2017
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed134 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

A WING: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities18

As on 4 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Society room common for A B C wingYes100%
ENTRANCE GATE WATCHMAN CABINYes100%
CC TV FACILITY IN COMMON AREAS LIKE STAIRCASE PASSAGESYes0%

Parking filed60

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots60
Closed/Covered40
Open Space20

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,575 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1260.0
Proposed, not sanctioned1,260 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMANGALMURTY NIVAS, JALGAON

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKAMAKSHI KOPARKAR
EngineerManoj S Joshi
Chartered AccountantAnuradha K Paranjape
PartnerRole in project
AVISHKAR DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Aug 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed134

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 134 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 5)File: AVISHKAR - A WING - CA FORM 5-31-03-25.pdf4 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AVISHKAR A arch 32.pdf16 Apr 2025
Certificates of CA (Form 3)File: AVISHKAR A wing CA 32.pdf16 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AVISHKAR A eng 32.pdf16 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AVISHKAR A arch 31.pdf13 Jan 2025
Certificates of CA (Form 3)File: AVISHKAR A wing CA 31.pdf13 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AVISHKAR A eng 31.pdf13 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AVISHKAR A arch 30.pdf19 Oct 2024
Certificates of CA (Form 3)File: AVISHKAR A wing CA 30.pdf19 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AVISHKAR A eng 30.pdf19 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AVISHKAR A arch 28.pdf13 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AVISHKAR A arch 29.pdf13 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AVISHKAR A eng 28.pdf13 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AVISHKAR A eng 29.pdf13 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: AVISHKAR - A WING - CA FORM 5-31-03-21.pdf13 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: AVISHKAR - A WING - CA FORM 5-31-03-22.pdf13 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: AVISHKAR - A WING - CA FORM 5-31-03-23.pdf13 Aug 2024
Certificates of CA (Form 3)File: AVISHKAR A wing CA 28.pdf13 Aug 2024
Certificates of CA (Form 3)File: AVISHKAR A wing CA 29.pdf13 Aug 2024
Certificates of CA (Form 5)File: AVISHKAR - A WING - CA FORM 5-31-03-24.pdf13 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: AVISHKAR - A WING - CA FORM 5-31-03-24.pdf13 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AVISHKAR A eng 27.pdf6 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AVISHKAR A arch 26.pdf4 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AVISHKAR A arch 27.pdf4 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AVISHKAR A eng 26.pdf4 Feb 2024
Certificates of CA (Form 3)File: AVISHKAR A wing CA 26.pdf4 Feb 2024
Certificates of CA (Form 3)File: AVISHKAR A wing CA 27.pdf4 Feb 2024
Certificates of CA (Form 5)File: AVISHKAR - A WING - CA FORM 5-31-03-23.pdf16 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: AVISHKAR - A WING - CA FORM 5-31-03-23.pdf16 Sep 2023
Certificates of CA (Form 3)File: AVISHKAR A wing CA 25.pdf15 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AVISHKAR A arch 25.pdf14 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AVISHKAR A eng 25.pdf14 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AVISHKAR A arch 24.pdf15 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AVISHKAR A eng 24.pdf15 Jun 2023
Certificates of CA (Form 3)File: AVISHKAR A wing CA 24.pdf15 Jun 2023
Disclosure of sold/ booked inventoryFile: Avishkar - A wing - Disclosure of Slod Inventory till 28 02-2023.pdf3 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AVISHKAR A eng 13.pdf3 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AVISHKAR A eng 14.pdf3 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AVISHKAR A eng 15.pdf3 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AVISHKAR A eng 16.pdf3 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AVISHKAR A eng 17.pdf3 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AVISHKAR A eng 18.pdf3 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AVISHKAR A eng 19.pdf3 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AVISHKAR A eng 20.pdf3 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AVISHKAR A eng 21.pdf3 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AVISHKAR A eng 22.pdf3 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AVISHKAR A eng 23.pdf3 Feb 2023
Certificates of CA (Form 5)File: AVISHKAR - A WING - CA FORM 5-31-03-21.pdf3 Feb 2023
Certificates of CA (Form 5)File: AVISHKAR - A WING - CA FORM 5-31-03-22.pdf3 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: AVISHKAR - A WING - CA FORM 5-31-03-19.pdf3 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: AVISHKAR - A WING - CA FORM 5-31-03-20.pdf3 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: AVISHKAR - A WING - CA FORM 5-31-03-21.pdf3 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: AVISHKAR - A WING - CA FORM 5-31-03-22.pdf3 Feb 2023
PAN CardFile: AVISHKAR DEVELOPERS PAN.pdf1 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AVISHKAR A arch 17.pdf1 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AVISHKAR A arch 18.pdf1 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AVISHKAR A arch 19.pdf1 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AVISHKAR A arch 20.pdf1 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AVISHKAR A arch 21.pdf1 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AVISHKAR A arch 22.pdf1 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AVISHKAR A arch 23.pdf1 Feb 2023
Certificates of CA (Form 3)File: AVISHKAR A wing CA 17.pdf1 Feb 2023
Certificates of CA (Form 3)File: AVISHKAR A wing CA 18.pdf1 Feb 2023
Certificates of CA (Form 3)File: AVISHKAR A wing CA 19.pdf1 Feb 2023
Certificates of CA (Form 3)File: AVISHKAR A wing CA 20.pdf1 Feb 2023
Certificates of CA (Form 3)File: AVISHKAR A wing CA 21.pdf1 Feb 2023
Certificates of CA (Form 3)File: AVISHKAR A wing CA 22.pdf1 Feb 2023
Certificates of CA (Form 3)File: AVISHKAR A wing CA 23.pdf1 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AVISHKAR A arch 13.pdf15 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AVISHKAR A arch 14.pdf15 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AVISHKAR A arch 15.pdf15 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AVISHKAR A arch 16.pdf15 Aug 2021
Certificates of CA (Form 3)File: AVISHKAR A wing CA 13.pdf15 Aug 2021
Certificates of CA (Form 3)File: AVISHKAR A wing CA 14.pdf15 Aug 2021
Certificates of CA (Form 3)File: AVISHKAR A wing CA 15.pdf15 Aug 2021
Certificates of CA (Form 3)File: AVISHKAR A wing CA 16.pdf15 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AVISHKAR A arch 11.pdf29 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AVISHKAR A arch 12.pdf29 Sep 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AVISHKAR A eng 11.pdf29 Sep 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AVISHKAR A eng 12.pdf29 Sep 2020

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
ANKUR PRIMEP52800001653Mandlik Compound, Ratnagiri72Jul 2017CompletedDec 2021Jan 1970

How this compares with Ratnagiri

15%of Ratnagiri projects moved their completion datethis one has not
30%of Ratnagiri registrations have lapsed or been cancelledthis one is among them

Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.

Keep AVISHKAR HEIGHTS - A WING - PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Jalgaon1,100+ in Ratnagiri

2 kmAVISHKAR HEIGHTS - A WINCompleted 20Lapsed / revoked 12Other 19Dot size: filed unitsN

Filed coordinates, straight-line distance. 51 registered projects within 2 km.

Builder: AVISHKAR DEVELOPERS

AVISHKAR DEVELOPERS has 4 registrations on MahaRERA, including AVISHKAR HEIGHTS - B WING - PHASE I and AVISHKAR HEIGHTS - A WING - PHASE II. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Ratnagiri district page.

Frequently asked questions

What does it mean that AVISHKAR HEIGHTS - A WING - PHASE II shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if AVISHKAR HEIGHTS - A WING - PHASE II is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AVISHKAR HEIGHTS - A WING - PHASE II?

The registered promoter entity is AVISHKAR DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AVISHKAR HEIGHTS - A WING - PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AVISHKAR HEIGHTS - A WING - PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AVISHKAR HEIGHTS - A WING - PHASE II?

The professionals named in the filing: Architect: KAMAKSHI KOPARKAR; Engineer: Manoj S Joshi; Chartered Accountant: Anuradha K Paranjape. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AVISHKAR HEIGHTS - A WING - PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AVISHKAR HEIGHTS - A WING - PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AVISHKAR HEIGHTS - A WING - PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.