Home / Browse projects / Ratnagiri, Maharashtra / ANKUR PRIME

Completed No litigation declared Others project

ANKUR PRIME

By ANKUR DEVELOPERS

RG-MH-09792 · RERA P52800001653 · Last updated on MahaRERA portal: 31 Jul 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.
Dec 2021Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

ANKUR PRIME is a Others project by ANKUR DEVELOPERS in Ratnagiri, Maharashtra, registered with MahaRERA as P52800001653 on 29 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2021.

At a glance

Project

  • NameANKUR PRIME
  • TypeOthers
  • Location
    • Dapoli Dabhol Road
    • Mandlik Compound
    • Dapoli Camp
    • Dapoli
    • Ratnagiri
    • 415712
  • Pincode415712
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52800001653
  • ReraGenie IDRG-MH-09792

Builder

  • NameANKUR DEVELOPERS
  • Entity typePartnership
  • GSTIN27AAUFA9723G1Z0
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersPRIYADARSHAN SHRIDHAR KOPARKAR, SANTOSH SHIVRAM GIMHAVANEKAR, PRASHANT BHASKAR JOSHI, LEENA RAHUL MANDLIK
  • Other registrations2 more →
  • Completed1 of 3

Key dates

this monthRegisteredJul 2017PromisedDec 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Jul 2017
  • Promised completion30 Dec 2021
  • Revised completionNone
  • Buildings1 building record
  • Documents filed83 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANKUR PRIMENA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 31 Jul 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

ANKUR PRIME: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities17

As on 31 Jul 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%
SOCIETY ROOMYes100%
CC TV FACILITY IN COMMON AREAS LIKE STAIRCASE PASSAGESYes100%

Parking filed218

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots218
Closed/Covered45
Open Space173

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,172 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3770.0
Proposed, not sanctioned3,770 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGALA NO 3,4,5, NAMRA VILAS HERITAGE, A/P DAPOLI, DIST RATNAGIRI

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKAMAKSHI KOPARKAR
PartnerRole in project
ANKUR DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Aug 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 Aug 2021

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: ANKUR Society CERTIFICATE.pdf31 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ANKUR ENG Cert 16.pdf7 May 2023
Architect’s Certificate on Completion of Project (Form 4)File: ANKUR Arch FORM 4.pdf7 May 2023
Certificates of CA (Form 3)File: ANKUR CA Cet 16.pdf22 Apr 2023
Certificates of CA (Form 5)File: ANKUR - CA FORM 5-31-03-19.pdf22 Apr 2023
Certificates of CA (Form 5)File: ANKUR - CA FORM 5-31-03-21.pdf22 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: ANKUR - CA FORM 5-31-03-18.pdf22 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: ANKUR - CA FORM 5-31-03-19.pdf22 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: ANKUR - CA FORM 5-31-03-20.pdf22 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: ANKUR - CA FORM 5-31-03-21.pdf22 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ANKUR - Architect cert 13.pdf11 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ANKUR - Architect cert 14.pdf11 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ANKUR - Architect cert 15.pdf11 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ANKUR - Architect cert 16.pdf11 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ANKUR ENG Cert 13.pdf11 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ANKUR ENG Cert 14.pdf11 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ANKUR ENG Cert 15.pdf11 Aug 2021
Certificates of CA (Form 3)File: ANKUR CA Cet 13.pdf11 Aug 2021
Certificates of CA (Form 3)File: ANKUR CA Cet 14.pdf11 Aug 2021
Certificates of CA (Form 3)File: ANKUR CA Cet 15.pdf11 Aug 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ANKUR FINAL OC.pdf11 Aug 2021
Certificates of CA (Form 5)File: ANKUR - CA FORM 5-31-03-20.pdf30 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ANKUR - Architect cert 11.pdf29 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ANKUR - Architect cert 12.pdf29 Sep 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ANKUR ENG Cert 11.pdf29 Sep 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ANKUR ENG Cert 12.pdf29 Sep 2020
Certificates of CA (Form 3)File: ANKUR CA Cet 11.pdf29 Sep 2020
Certificates of CA (Form 3)File: ANKUR CA Cet 12.pdf29 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ANKUR - Architect cert 9.pdf3 Apr 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ANKUR - Architect cert 10.pdf3 Apr 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ANKUR ENG Cert 9.pdf3 Apr 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ANKUR ENG Cert 10.pdf3 Apr 2020
Certificates of CA (Form 3)File: ANKUR CA Cet 9.pdf3 Apr 2020
Certificates of CA (Form 3)File: ANKUR CA Cet 10.pdf3 Apr 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ANKUR - Third Floor OC.pdf3 Apr 2020
OtherFile: ANKUR - Final Fire certificate .pdf3 Apr 2020
Proforma of Allotment letterFile: ANKUR - CA FORM 5-31-03-19.pdf29 Sep 2019
Certificates of CA (Form 3)File: ANKUR CA Cet 7.pdf23 Jun 2019
Certificates of CA (Form 3)File: ANKUR CA Cet 8.pdf23 Jun 2019
Form 2AFile: ANKUR - Explanation about Form 2A.pdf19 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ANKUR - Architect cert 7.pdf18 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ANKUR - Architect cert 8.pdf18 Jun 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ANKUR ENG Cert 7.pdf18 Jun 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ANKUR ENG Cert 8.pdf18 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ANKUR CA Cet 5.pdf14 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ANKUR - Architect cert 5.pdf14 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ANKUR - Architect cert 6.pdf14 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ANKUR ENG Cert 5.pdf14 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ANKUR ENG Cert 6.pdf14 Jan 2019
Certificates of CA (Form 3)File: ANKUR CA Cet 6.pdf14 Jan 2019
Certificates of CA (Form 3)File: ANKUR CA Cet 5.pdf14 Jan 2019
OtherFile: ANKUR - part OC - Second floor.pdf5 Nov 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ANKUR - Architect cert 4.pdf29 Sep 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ANKUR ENG Cert 4.pdf29 Sep 2018
Certificates of CA (Form 3)File: ANKUR CA Cet 4.pdf29 Sep 2018
Certificates of CA (Form 5)File: ANKUR - CA FORM 5-31-03-18.pdf29 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ANKUR - Architect cert 3.pdf18 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ANKUR ENG Cert 3.pdf18 Apr 2018
Certificates of CA (Form 3)File: ANKUR CA cert 3.pdf18 Apr 2018
OtherFile: ANKUR PART OC.pdf18 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ANKUR - Architect cert 2.pdf2 Dec 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ANKUR ENG Cert 2.pdf2 Dec 2017
Certificates of CA (Form 3)File: ANKUR CA cert 2.pdf2 Dec 2017
Layout approvalFile: ANKUR DECLARATION LAYOUT DOC.pdf29 Aug 2017
Copy of Layout Approval (in case of layout)File: ANKUR DECLARATION LAYOUT DOC.pdf29 Aug 2017
Declaration in FORM BFile: ANKUR B FORM.pdf29 Aug 2017
Certificates of CA (Form 3)File: ANKUR CA.pdf29 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ANKUR - Architect cert.pdf24 Jul 2017
Certificates of CA (Form 3)File: ANKUR - CA Form 3.pdf24 Jul 2017
Proforma of Allotment letterFile: ANKUR - Sathekhat format.pdf24 Jul 2017
Details of encumbrancesFile: ANKUR - Self Declaration about Encumbrances.pdf23 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ANKUR - Engineer's certificate.pdf23 Jul 2017
Declaration in FORM BFile: Form B Afidavit - ANKUR.pdf20 Jul 2017
Building plan approvalFile: ANKUR PRIME - SHEET 1.pdf18 Jul 2017
Building plan approvalFile: ANKUR PRIME - SHEET 2.pdf18 Jul 2017
Building plan approvalFile: ANKUR PRIME - SHEET 3.pdf18 Jul 2017
Layout approvalFile: ANKUR PRIME - SHEET 3.pdf18 Jul 2017
Copy of the legal title reportFile: ANKUR - Title Report.pdf18 Jul 2017
Copy of Layout Approval (in case of layout)File: ANKUR PRIME - SHEET 3.pdf18 Jul 2017
Building Plan Approval (IOD)File: ANKUR PRIME - SHEET 1.pdf18 Jul 2017

How this compares with Ratnagiri

15%of Ratnagiri projects moved their completion datethis one has not
30%of Ratnagiri registrations have lapsed or been cancelledthis one is completed

Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.

Keep ANKUR PRIME on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mandlik Compound1,100+ in Ratnagiri

2 kmANKUR PRIMECompleted 19Lapsed / revoked 17Other 17Dot size: filed unitsN

Filed coordinates, straight-line distance. 53 registered projects within 2 km.

Builder: ANKUR DEVELOPERS

ANKUR DEVELOPERS has 3 registrations on MahaRERA, including ANKUR PRIME and Ankur Residency. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Ratnagiri district page.

Frequently asked questions

What are my rights if ANKUR PRIME is delayed beyond 30 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ANKUR PRIME?

The registered promoter entity is ANKUR DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAUFA9723G1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ANKUR PRIME?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ANKUR PRIME?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ANKUR PRIME?

The professionals named in the filing: Architect: KAMAKSHI KOPARKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ANKUR PRIME?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ANKUR PRIME. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ANKUR PRIME to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.