Home / Browse projects / Pune, Maharashtra / AVENUE PROMENADE

Registered No litigation declared Commercial project

AVENUE PROMENADE

By M/S AVENUE HOUSING PVT LTD

RG-MH-41371 · RERA P52100054779 · Last updated on MahaRERA portal: 11 Dec 2025

Source: official MahaRERA filing

Red flags

  • Rs 27.00 crore secured on the land, in favour of ADITYA BIRLA HOUSING FINANCE LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Basement (if any), 50%
20 of 20Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

AVENUE PROMENADE is a Commercial project by M/S AVENUE HOUSING PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100054779 on 12 Feb 2024. Possession is promised by 31 Dec 2027. 0 of the 20 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameAVENUE PROMENADE
  • TypeCommercial
  • Location
    • PAN CARD ROAD
    • TAPKIRWASTI
    • Baner
    • Haveli
    • Pune
    • 411045
  • Pincode411045
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100054779
  • ReraGenie IDRG-MH-41371

Builder

  • NameM/S AVENUE HOUSING PVT LTD
  • Entity typeCompany
  • Managing DirectorAMIT JAYANT SHET
  • Other registrations2 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

this monthRegisteredFeb 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Feb 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed65 files

Current status

0%0 of 20 units booked

Figures as on 11 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AVENUE PROMENADENA9602020

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 50%.

AVENUE PROMENADE: 18% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)50%
Podiums (if any)0%
Plinth50%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed224

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots224
Closed/Covered224

Land and ownership6

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,832 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
Encumbrance on the landDeclared present
Charge in favour ofADITYA BIRLA HOUSING FINANCE LIMITED
Secured amountRs 27.00 crore
CERSAI search filedYes
Declared on27 May 2025
LandownerVillageDistrict
DEEPAK NAMDEV TAPKIRBanerPune
MAHESH NAMDEO TAPKIRBanerPune
AMAR NAMDEV TAPKIRBanerPune
SHIVAJI TUKARAM TAPKIRBanerPune
RAVINDRA TUKARAM TAPKIRBanerPune
SACHIN TUKARAM TAPKIRBanerPune

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI9063.03
Proposed, not sanctioned3,543 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Shop No. 2, Atria, Sai Prestige, Baner Road, Pune.411045

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVipul Nikam
EngineerUMESH JAGTAP
EngineerSourabh Patil
Chartered AccountantRUPALI D PAWAR
Chartered AccountantA. S. GHOLKAR & CO.
PartnerRole in project
M/S AVENUE HOUSING PVT LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Form 5 - Avenue Promonade FY 2024-25.pdf11 Dec 2025
Form 1File: Form 1.pdf11 Jul 2025
Form 2File: PROMENADE FY 2023-24 Q4 FORM 2.pdf11 Jul 2025
Form 3File: Avenue promenade - FY 2024-25 Q4 Form 3.pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: Avenue promenade - FY 2024-25 Q4 Form 3.pdf11 Jul 2025
Form 1File: PROMENADE FY 2023-24 Q4 FORM 1.pdf27 May 2025
Form 2File: PROMENADE FY 2023-24 Q4 FORM 2.pdf27 May 2025
Form 3File: PROMENADE FY 2023-24 Q4 FORM 3.pdf27 May 2025
Form 1File: PROMENADE FY 2024-25 Q1 FORM 1.pdf27 May 2025
Form 2File: PROMENADE FY 2024-25 Q1 FORM 2.pdf27 May 2025
Form 3File: PROMENADE FY 2024-25 Q2 FORM 3.pdf27 May 2025
Form 1File: PROMENADE FY 2024-25 Q2 FORM 1.pdf27 May 2025
Form 2File: PROMENADE FY 2024-25 Q2 FORM 2.pdf27 May 2025
Form 3File: PROMENADE FY 2024-25 Q2 FORM 3.pdf27 May 2025
Form 1File: Form 1.pdf27 May 2025
Form 2File: Form 2.pdf27 May 2025
Form 3File: Form 3.pdf27 May 2025
Form 5 (FY 2023-2024)File: PROMENADE FY 2023-24 Q4 FORM 5.pdf27 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PROMENADE FY 2024-25 Q1 FORM 1.pdf14 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PROMENADE FY 2024-25 Q1 FORM 1.pdf14 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PROMENADE FY 2024-25 Q2 FORM 1.pdf14 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PROMENADE FY 2024-25 Q2 FORM 3.pdf14 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PROMENADE FY 2024-25 Q2 FORM 3.pdf14 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PROMENADE FY 2024-25 Q1 FORM 1.pdf14 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PROMENADE FY 2024-25 Q1 FORM 2.pdf14 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PROMENADE FY 2024-25 Q2 FORM 2.pdf14 Feb 2025
Proforma of Agreement for saleFile: Updated Sale Deed.pdf31 Jan 2025
Details of encumbrances concerned to FinanceFile: Encumbrance certificate.pdf20 Jan 2025
Details of encumbrances concerned to LegalFile: Encumbrance certificate.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PROMENADE FY 2023-24 Q4 FORM 1.pdf7 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PROMENADE FY 2023-24 Q4 FORM 3.pdf7 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PROMENADE FY 2023-24 Q4 FORM 2.pdf7 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: PROMENADE FY 2023-24 Q4 FORM 2A.pdf7 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: PROMENADE FY 2023-24 Q4 FORM 5.pdf7 Dec 2024
Building plan approvalFile: Sanction layout CC 0649 1 of 2 - Resi cum Comm.pdf1 Feb 2024
Building plan approvalFile: Sanction layout CC 0649 2 of 2 - Resi cum Comm.pdf1 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction layout CC 0649 1 of 2 - Resi cum Comm.pdf1 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction layout CC 0649 2 of 2 - Resi cum Comm.pdf1 Feb 2024
Other - FinanceFile: Form 3 CA Certificate_C.pdf1 Feb 2024
Copy of the legal title reportFile: New title Search Comp.pdf10 Jan 2024
Other - TechnicalFile: Sanction layout CC 0649 1 of 2 - Resi cum Comm.pdf10 Jan 2024
Other - TechnicalFile: Sanction layout CC 0649 2 of 2 - Resi cum Comm.pdf10 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM_1_Architect_Certificate[1].pdf9 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM_2_Engineer_Certificate[1].pdf9 Jan 2024
Other - LegalFile: Form_B_-_Affidavit_cum_Declaration_-_Amit_Shet[1].pdf9 Jan 2024
Declaration in FORM BFile: Form B - Affidavit cum Declaration - Amit Shet.pdf19 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: NA ORDER PROMENADE.pdf17 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf17 Nov 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION_ABOUT_SEPARATE_BANK_ACOUNT - Upload.pdf8 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A RAHUL KULKARNI.pdf16 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A SHARAD PANDEY.pdf16 Oct 2023
Proforma of Agreement for saleFile: Draft Agreement to Sale.pdf16 Oct 2023
Layout approvalFile: Amalgamation layout CC 0649 1 of 1.pdf14 Oct 2023
PAN CardFile: 2 PAN Card.pdf14 Oct 2023
Details of encumbrances concerned to FinanceFile: DECLARATION_REGARDING_ENCUMBRANCE (1).pdf14 Oct 2023
Details of encumbrances concerned to LegalFile: DECLARATION_REGARDING_ENCUMBRANCE (1).pdf14 Oct 2023
Copy of Layout Approval (in case of layout)File: Amalgamation layout CC 0649 1 of 1.pdf14 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate (1).pdf14 Oct 2023
Declaration about Commencement CertificateFile: DECLARATION_ABOUT_COMMENCEMENT Compressed.pdf14 Oct 2023
CERSAI detailsFile: Declaration_CERSAI (1).pdf14 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE_OF_INTEREST_AMIT.pdf14 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE_OF_INTEREST_LEENA.pdf14 Oct 2023
Proforma of Allotment letterFile: Draft Allotment Letter (1).pdf14 Oct 2023
Deviation Report with respect to Allotment letterFile: DECLARATION_REGARDING_DEVIATION (1).pdf14 Oct 2023
Deviation Report with respect to model copy of AgreementFile: DECLARATION_REGARDING_DEVIATIATION REGARDING SALE.pdf14 Oct 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
AVENUE CECILIAP52100076980Baner, Pune6Jul 2024OngoingDec 2030Not due yet
66 HIGH STREET SQUAREP52100024461Baner, Pune39Feb 2020OngoingApr 2024Not delivered

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AVENUE PROMENADE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TAPKIRWASTI13,700+ in Pune

2 kmAVENUE PROMENADECompleted 157Lapsed / revoked 58Other 160Dot size: filed unitsN

Filed coordinates, straight-line distance. 375 registered projects within 2 km.

Builder: M/S AVENUE HOUSING PVT LTD

M/S AVENUE HOUSING PVT LTD has 3 registrations on MahaRERA, including 66 HIGH STREET SQUARE and AVENUE PROMENADE. Its filings disclose 3 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if AVENUE PROMENADE is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AVENUE PROMENADE?

The registered promoter entity is M/S AVENUE HOUSING PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AVENUE PROMENADE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AVENUE PROMENADE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AVENUE PROMENADE?

The professionals named in the filing: Architect: Vipul Nikam; Engineer: UMESH JAGTAP; Engineer: Sourabh Patil; Chartered Accountant: RUPALI D PAWAR; Chartered Accountant: A. S. GHOLKAR & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AVENUE PROMENADE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AVENUE PROMENADE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AVENUE PROMENADE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.