ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / AVENUE CECILIA

Registered No litigation declared Commercial project

AVENUE CECILIA

By M/S AVENUE HOUSING PVT LTD

RG-MH-07023 · RERA P52100076980 · Last updated on MahaRERA portal: 17 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 38%
6 of 6Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

AVENUE CECILIA is a Commercial project by M/S AVENUE HOUSING PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100076980 on 10 Jul 2024. Possession is promised by 31 Dec 2030. 0 of the 6 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameAVENUE CECILIA
  • TypeCommercial
  • Location
    • Pan Card Club Road
    • Baner
    • Haveli
    • Pune
    • 411045
  • Pincode411045
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100076980
  • ReraGenie IDRG-MH-07023

Builder

  • NameM/S AVENUE HOUSING PVT LTD
  • Entity typeCompany
  • Managing DirectorAMIT JAYANT SHET
  • Other registrations2 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

this monthRegisteredJul 2024PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Jul 2024
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed74 files

Current status

0%0 of 6 units booked
69.2%Work done, per cost certificate

Figures as on 17 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AVENEU CECILIANA77066

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 38%.

AVENEU CECILIA: 40% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure38%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes30%
Storm Water DrainsYes20%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes25%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes35%
Electrical meter room, sub-station, receiving stationYes10%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed131

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots131
Closed/Covered131

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,005 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on27 May 2025

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI1521.87
Proposed, not sanctioned1,522 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchS no 1/A, Krishnakeval Nagar, Main Kondhwa Road, Adjacent to Heaven Hill Society, Kondhwa Pune 41104
Estimated costRs 3.24 cr
Cost incurredRs 2.25 cr
Work done69.21%
BuildingWingEstimatedIncurred
AVENEU CECILIANARs 3.24 crRs 2.25 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVipul Nikam
ArchitectVILAS TARWADI
EngineerUmesh Jagtap
EngineerSourabh Patil
Chartered AccountantRUPALI D PAWAR
Chartered AccountantA. S. Gholkar & Co.
Chartered AccountantM V JOSHI & CO Chartered Accountants
PartnerRole in project
M/S AVENUE HOUSING PVT LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Withdrawal Application Form1.pdf17 Jun 2026
Withdrawal Update Form 2File: Withdrawal Application Form2.pdf17 Jun 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 - converted.pdf17 Jun 2026
Withdrawal Update Form 1File: Avenue Cecilia FY 2025-26 Q 3 Form 1.pdf9 Jun 2026
Withdrawal Update Form 2File: Avenue Cecilia FY 2025-26 Q 3 Form 2.pdf9 Jun 2026
Withdrawal Update Form 3File: Avenue Cecilia FY 2025-26 Q3 Form 3.pdf9 Jun 2026
Withdrawal Update Form 1File: Avenue Cecilia - FY 2025-26 Q2 Form 1.pdf5 Jun 2026
Withdrawal Update Form 2File: Avenue Cecilia - FY 2025-26 Q2 Form 2.pdf5 Jun 2026
Withdrawal Update Form 3File: Form 3 Upload.pdf5 Jun 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate - Copy.pdf11 Dec 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate.pdf11 Dec 2025
Withdrawal Update Form 3File: Form 3 Upload.pdf11 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 Avenue Cecelia 2024-25.pdf11 Dec 2025
Form 1File: Form 1.pdf2 Jul 2025
Form 2File: Form 2 Cecilia Q4 24-25.pdf2 Jul 2025
Form 3File: Avenue cecilia Form 3 Mar 25.pdf2 Jul 2025
Disclosure of Sold and Booked InventoryFile: Avenue cecilia Form 3 Mar 25.pdf2 Jul 2025
Form 1File: Form 1 Architect Certificate.pdf27 May 2025
Form 2File: Form 2 Engineer Certificate.pdf27 May 2025
Form 3File: Form 3 CA Certificate.pdf27 May 2025
Form 1File: Form 1.pdf27 May 2025
Form 2File: Form 2.pdf27 May 2025
Form 3File: Form 3.pdf27 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate - converted.pdf18 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf7 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf7 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf7 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Upload.pdf18 Jun 2024
Foreclosure of the ProjectFile: Sale Deed 400 sq mtr 2.pdf17 Jun 2024
Other - TechnicalFile: Sale Deed 400 sq mtr 1.pdf17 Jun 2024
Other - TechnicalFile: Sale Deed 400 sq mtr 2.pdf17 Jun 2024
Other - TechnicalFile: Sale Deed Anuradha 1.pdf17 Jun 2024
Other - TechnicalFile: Sale Deed Anuradha 2.pdf17 Jun 2024
Other - TechnicalFile: Sale Deed 1.pdf17 Jun 2024
Other - TechnicalFile: Sale Deed 2.pdf17 Jun 2024
Other - LegalFile: Clarification and Declaration for 7-12.pdf5 Jun 2024
Details of encumbrances concerned to FinanceFile: DECLARATION REGARDING ENCUMBRANCES TO LEGAL.pdf30 May 2024
Details of encumbrances concerned to LegalFile: DECLARATION REGARDING ENCUMBRANCES TO LEGAL.pdf30 May 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf30 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate - Copy.pdf30 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf30 May 2024
Other - TechnicalFile: One Plot Undertaking.pdf30 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A DECLARATION ABOUT SEPARATE BANK ACCOUNT.pdf29 May 2024
Other - LegalFile: Sale Deed 400 sq mtr 1.pdf29 May 2024
Other - LegalFile: Sale Deed 400 sq mtr 2.pdf29 May 2024
Other - LegalFile: Sale Deed Anuradha 1.pdf29 May 2024
Other - LegalFile: Sale Deed Anuradha 2.pdf29 May 2024
Other - LegalFile: Sale Deed 1.pdf29 May 2024
Other - LegalFile: Sale Deed 2.pdf29 May 2024
Proforma of Allotment letterFile: Proforma Of Allotment Letter.pdf13 May 2024
Layout approvalFile: Sanctioned Plan 1.pdf8 May 2024
Building plan approvalFile: Sanctioned Plan 1.pdf8 May 2024
Building plan approvalFile: Sanctioned Plan 2.pdf8 May 2024
Building plan approvalFile: Sanctioned Plan 3.pdf8 May 2024
PAN CardFile: 2 PAN Card.pdf8 May 2024
Copy of the legal title reportFile: Title Serach Report - converted.pdf8 May 2024
Details of encumbrances concerned to FinanceFile: DECLARATION REGARDING ENCUMBRANCE CONCERNED TO FINANCE.pdf8 May 2024
Details of encumbrances concerned to LegalFile: DECLARATION REGARDING ENCUMBRANCE CONCERNED TO FINANCE.pdf8 May 2024
Copy of Layout Approval (in case of layout)File: Sanctioned Plan 1.pdf8 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan 1.pdf8 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan 2.pdf8 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan 3.pdf8 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf8 May 2024
Declaration in FORM BFile: Form B.pdf8 May 2024
CERSAI detailsFile: Undertaking Regarding CERSAI.pdf8 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Amit.pdf8 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Leena.pdf8 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Rahul.pdf8 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Sharad.pdf8 May 2024
Proforma of Agreement for saleFile: Draft Sale Deed.pdf8 May 2024
Deviation Report with respect to Allotment letterFile: Declaration Regarding Deviation Report of Draft Allotment Letter.pdf8 May 2024
Deviation Report with respect to model copy of AgreementFile: Declaration Regarding Deviation Report of Agreement to Sale.pdf8 May 2024
Other - LegalFile: Index 2.pdf8 May 2024
Other - TechnicalFile: Index 2.pdf8 May 2024

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
AVENUE PROMENADEP52100054779TAPKIRWASTI, Pune20Feb 2024OngoingDec 2027Not due yet
66 HIGH STREET SQUAREP52100024461Baner, Pune39Feb 2020OngoingApr 2024Not delivered

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AVENUE CECILIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Baner13,700+ in Pune

2 kmAVENUE CECILIACompleted 171Lapsed / revoked 50Other 117Dot size: filed unitsN

Filed coordinates, straight-line distance. 338 registered projects within 2 km.

Builder: M/S AVENUE HOUSING PVT LTD

M/S AVENUE HOUSING PVT LTD has 3 registrations on MahaRERA, including 66 HIGH STREET SQUARE and AVENUE PROMENADE. Its filings disclose 3 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if AVENUE CECILIA is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AVENUE CECILIA?

The registered promoter entity is M/S AVENUE HOUSING PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AVENUE CECILIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AVENUE CECILIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AVENUE CECILIA?

The professionals named in the filing: Architect: Vipul Nikam; Architect: VILAS TARWADI; Engineer: Umesh Jagtap; Engineer: Sourabh Patil; Chartered Accountant: RUPALI D PAWAR; Chartered Accountant: A. S. Gholkar & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AVENUE CECILIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AVENUE CECILIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AVENUE CECILIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.