Home / Browse projects / Mumbai Suburban, Maharashtra / AVANTE

Registered No litigation declared Residential / Group Housing project

AVANTE

By Sanjeevani Vyapaar LLP

RG-MH-11630 · RERA P51800001140 · Last updated on MahaRERA portal: 13 May 2026

Source: official MahaRERA filing

Red flags

  • 55 complaints at MahaRERA
  • Completion date moved by 60 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 60 months from the original
26 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 95%
5 of 383Units unsoldnot recorded sold or booked
55Complaints at MahaRERAon this registration
Jump to the 176 documents Report an error

AVANTE is a Residential / Group Housing project by Sanjeevani Vyapaar LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800001140 on 26 Jul 2017. Possession is promised by 30 Dec 2027. The completion date has moved by 60 months from the original filing. 378 of the 383 units on this registration are recorded sold or booked, and 26 of 33 construction stages are filed complete. 55 complaints are on record with the regulator.

At a glance

Project

  • NameAVANTE
  • TypeResidential / Group Housing
  • Location
    • LBS Marg
    • Kanjur Marg
    • Kurla
    • Mumbai Suburban
    • 400078
  • Pincode400078
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800001140
  • ReraGenie IDRG-MH-11630

Builder

  • NameSanjeevani Vyapaar LLP
  • Entity typePartnership
  • CmdASHWIN N SHETH
  • Declared earlier projects10 →

Key dates

this monthRegisteredJul 2017First promiseDec 2022Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Jul 2017
  • Promised completion30 Dec 2027
  • Revised completionRevised to 30 Dec 2027 (originally 30 Dec 2022)
  • Buildings3 building records
  • Documents filed176 files

Current status

99%378 of 383 units booked
87.7%Work done, per cost certificate

Figures as on 13 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA31251460146
WING BNA30241400140
WING CNA302494397

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 13 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

26 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 95%.

WING A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING C92%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)95%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%

Progress on shared amenities15

As on 13 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes85%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes95%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed383

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots383
Closed/Covered383
BuildingClosed/CoveredTotal
WING A146146
WING B111111
WING C126126

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area7,307 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Sep 2024

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI24287.44
Proposed, not sanctioned5,569 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAcme Plaza CTS No 32 Opp Sangam Talkij, Andheri Kurla Road, Andheri - E Mumbai 59
Estimated costRs 160.73 cr
Cost incurredRs 141.02 cr
Work done87.73%
BuildingWingEstimatedIncurred
WING BNARs 52.23 crRs 47.21 cr
WING ANARs 49.75 crRs 49.74 cr
WING CNARs 47.31 crRs 40.67 cr
-NARs 11.45 crRs 3.40 cr

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANDEEP SHIKRE & ASSOCIATES
ArchitectAAKAR ARCHITECT AND CONSULTANT
EngineerMuhammad Shoeb CHOUHAN
EngineerDeepak N Gaikwad
EngineerSMARTY LACHHWANI
EngineerAnas Shaikh
EngineerRAMBOLL INDIA PVT LTD
Chartered AccountantM. B. Agrawal & Co.
Chartered AccountantHaresh Bhanushali & Associates
PartnerRole in project
Sanjeevani Vyapaar LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800010895Dec 2022 → Dec 2024

Reason as filed by the promoterThe Applicants, are developing “AVANTE” project and have various approvals for same. The Applicants state that for CC, NOC from Naval Authorities (hereafter N.A.) was required. The Applicants vide application 16.7.2016 to EEBP(ES), requested N.A. to grant NOC for further CC. N.A. vide letter 09.12.2016, refused NOC. Also Stop Work Notice (hereafter SWN) dated 4.01.2019 was issued. During, this time a W.P (No. 3013/2018, Tirandaz matter), concerning same cause of action was pending at HC. The HC vide order dated 27.2.2019, quashed SWN issued to Tirandaaz. The Applicants have filed a Writ Petiti

EXT51800025848Dec 2022 → Dec 2027

Reason as filed by the promotera) The Applicant submits that the said Project is unlikely to be completed by 31.12.2024. Hence, in the said circumstances, the Applicant is constrained to make this Application and seek extension of the registration of project for 36 months i.e. till 30.12.2027. b) The Applicant submits that on 09.12.2016, a letter was received from the Western Naval Command informing the Developer that NOC for construction will not be granted. Consequently, MCGM vide letter dated 06.01.2017 ordered the Developer to stop further construction work and provide an inventory (status) of the construction work alre

Litigation declared1

CaseCourtStatus
WP 1358/2019/2019Bombay High CourtListed for admission Next date of hearing is not yet available

Complaints filed with MahaRERA55

Case no.ComplainantRespondentFiled
CC006000000079131Sanjay Mahadev ChiplunkarM/s. Sanjivani Vyapar LLP02/05/2019
CC006000000171791Mujahid Rafiq MukadamAshwin sheth23/01/2020
CC006000000195221Mujahid MukadamSanjeevani Vyapar LLp11/12/2020
CC006000000192222MARLIN VARGHESE KADASanjeevani Vyapaar LLP24/01/2020
CC006000000192530Mahesh ParulekarSanjeevani Vyapaar LLP10/02/2020
CC006000000195087Ravindra AgrawalM/s SanjeevaniVyapaarLLP03/12/2020
CC006000000193735Snehalata Devram DeokarSanjeevani Vyapaar LLP15/08/2020
CC006000000195304Shailini Shailesh MarwahaSanjeevani Vyapaar LLP28/12/2020
CC006000000195559Ashutosh Singh RawatSanjeevani Vyapaar Limited Liability Partnership09/01/2021
CC006000000196331Deepali Shrikant TekadeSanjeevani Vyapaar Limited Liability Partnership18/03/2021
CC006000000198962Kaiser Sultana ShaikhSanjeevani Vyapaar Limited09/11/2021
CC006000000198443RAVINDRA SHANTARAM CHAVANSANJEEVNI VYAPAAR LLP23/09/2021
CC006000000198664Chander NavaniSanjeevani Vyapaar Limited Liability Partnership13/10/2021
CC006000000198781Harish Shankappa ShettyP5180000114008/11/2021
CC006000000209616Ashish ManeSanjeevani Vyapaar LLP04/01/2022
CC006000000209649Puja Nikhil KadamM/s. Sanjivani Vyapar LLP08/01/2022
CC006000000209917Girish Sharma and Usha SharmaSanjeevani Vyapaar LLP12/02/2022
CC006000000209918Ritesh Raghunandan Nasikkar and Kirtikumar J. SharmaSanjeevani Vyapar LLP12/02/2022
CC006000000210257SHAILESH MATEKARSANJEEVNI VYPAAR LLP04/03/2022
CC006000000220834Prakash Raju ShettySanjeevani Vyapaar Limited Liability15/04/2022
CC006000000292455Sonali Amit DsouzaSanjeevani Vyapaar Limited Liability Partnership26/08/2022
CC006000000303220Pragati Utkarsh GhagareSanjeevani Vyapaar Limited Liability Partership04/11/2022
CC006000000333838Manoj Gopaldas NankaniM/s Sanjivani Vyapar LLP29/12/2022
CC006000000397860Keith Sherwin MascarenhasSanjeevani Vyapaar LLP16/10/2023
CC12400595Riten Rajendra PatelSanjeevani Vyapaar LLP27/10/2024
CC12502787Sachin GaikwadSanjeevani Vyapaar LLP07/08/2025
CC12501101SENTHIL KUMARSanjeevani Vyapaar LLP02/04/2025
CC12501206HARIOM CHHOTELAL GUPTASanjeevani Vyapaar LLP11/04/2025
CC12501323Samitha Ankush ShettySanjeevani Vyapaar LLP21/04/2025
CC12501336SNEHA PRADIP ACHREKARSanjeevani Vyapaar LLP22/04/2025
CC12501337Jayashankar Arjun ShuklaSanjeevani Vyapaar LLP22/04/2025
CC12501413Pankaj Manohar KhubchandaniSanjeevani Vyapaar LLP27/04/2025
CC12501512JAIBHIM TUKARAM NARNAWARESanjeevani Vyapaar LLP06/05/2025
CC12501695Neha Gupta DeSanjeevani Vyapaar LLP25/05/2025
CC12501820Ganesh Dhondu KadgeSanjeevani Vyapaar LLP03/06/2025
CC12502185Hanumantha NarsappaSanjeevani Vyapaar LLP01/07/2025
CC12502151MANOHAR A SURVESanjeevani Vyapaar LLP30/06/2025
CC12502213PRAVIN MARUTI SALVESanjeevani Vyapaar LLP03/07/2025
CC12502614Omkar Ashok KabadiSanjeevani Vyapaar LLP29/07/2025
CC12502981Prasad Chandrakant ShirangareSanjeevani Vyapaar LLP23/08/2025
CC12503521Gopal Harishchandra SalunkheSanjeevani Vyapaar LLP02/10/2025
CC12503557SHITAL PRADIP UGHADESanjeevani Vyapaar LLP06/10/2025
CC12503562Rohan SakpalSanjeevani Vyapaar LLP07/10/2025
CC12503783JACKSON SANTAN DSOUZASanjeevani Vyapaar LLP29/10/2025
CC12503773LINI BALAKRISHNAN KARANATHSanjeevani Vyapaar LLP29/10/2025
CC12503840MARLIN VARGHESE KADASanjeevani Vyapaar LLP01/11/2025
CC12504183Saurabh Kumar SinghSanjeevani Vyapaar LLP26/11/2025
CC12504505Pankaj Manohar KhubchandaniSanjeevani Vyapaar LLP17/12/2025
CC12600214Joyce Sharon BenjaminSanjeevani Vyapaar LLP12/01/2026
CC12600556Manish Dinkar KothawadeSanjeevani Vyapaar LLP01/02/2026
CC12600820JAIBHIM TUKARAM NARNAWARESanjeevani Vyapaar LLP13/02/2026
CC12601322Jogesh Satishkumar ChawlaSanjeevani Vyapaar LLP11/03/2026
CC12602015Abhishek Vilas HongekarSanjeevani Vyapaar LLP05/04/2026
CC12602316Gurudev Uddhav BodakeSanjeevani Vyapaar LLP19/04/2026
CC12603809Sucheta MehraSanjeevani Vyapaar LLP20/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2027

Documents filed176

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 176 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Avante Form-1.pdf13 May 2026
Withdrawal Update Form 2File: AVANTE (1).pdf13 May 2026
Withdrawal Update Form 3File: Form - 3_Avante_Mar 26.pdf13 May 2026
Withdrawal Update Form 1File: form 1 avante.pdf28 Jan 2026
Withdrawal Update Form 2File: AVANTE.pdf28 Jan 2026
Withdrawal Update Form 3File: Form-3_Avante_Dec 25_Signed.pdf28 Jan 2026
Withdrawal Update Form 1File: Form - 1 Avante 271025.pdf12 Dec 2025
Withdrawal Update Form 2File: AVANTE.pdf12 Dec 2025
Withdrawal Update Form 3File: Form-3_Avante_Sept 25 Signed.pdf12 Dec 2025
Form 5 (FY 2024-2025)File: Form - 5_Avante_2024-25-Signed.pdf25 Nov 2025
Form 2A (FY 2024-2025)File: FORM-2A - Avante.pdf5 Nov 2025
Withdrawal Update Form 1File: Form 1 - Avante.pdf24 Oct 2025
Withdrawal Update Form 2File: AVANTE.pdf24 Oct 2025
Withdrawal Update Form 3File: Form - 3 Avante.pdf24 Oct 2025
Disclosure of Sold and Booked InventoryFile: Discloser of Sold - Booked Inventory - Avante.pdf24 Jul 2025
Form 1File: 05012022_RERA_CERTIFICATE avante_compressed.pdf24 Jul 2025
Form 2File: Form 2-Avante-Dec 2021.pdf24 Jul 2025
Form 3File: Avante form 3 Dec 21.pdf24 Jul 2025
Form 1File: AVANTE.pdf24 Jul 2025
Form 2File: AVANTE.PDF24 Jul 2025
Form 3File: Avante March 22.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: SHETH AVANTE.PDF24 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Avante.pdf29 Apr 2025
Certificates of CA (Form 3)File: FORM 3 - Avante.pdf29 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - Sheth Avante.pdf29 Apr 2025
Disclosure of sold/ booked inventoryFile: AVANTE.pdf29 Apr 2025
Disclosure of sold/ booked inventoryFile: AVANTE.pdf22 Jan 2025
Disclosure of sold/ booked inventoryFile: AVANTE.pdf22 Jan 2025
Disclosure of sold/ booked inventoryFile: AVANTE.pdf22 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Avante.pdf18 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Avante.pdf18 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Avante.pdf18 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2 - Sheth Avante.pdf16 Jan 2025
Certificates of CA (Form 3)File: FORM-3- Avante.pdf16 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2 - Sheth Avante.pdf16 Jan 2025
Certificates of CA (Form 3)File: FORM-3- Avante.pdf16 Jan 2025
Certificates of CA (Form 3)File: FORM-3- Avante.pdf16 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2 - Sheth Avante.pdf16 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AVANTE Form 1.pdf29 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2 Avante.pdf29 Oct 2024
Certificates of CA (Form 3)File: Form - 3 Avante.pdf29 Oct 2024
Disclosure of sold/ booked inventoryFile: AVANTE - A WING.pdf29 Oct 2024
Disclosure of sold/ booked inventoryFile: AVANTE - B WING.pdf29 Oct 2024
Disclosure of sold/ booked inventoryFile: AVANTE - C WING.pdf29 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AVANTE Form 1.pdf29 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2 Avante.pdf29 Oct 2024
Certificates of CA (Form 3)File: Form - 3 Avante.pdf29 Oct 2024
Disclosure of sold/ booked inventoryFile: AVANTE - A WING.pdf29 Oct 2024
Disclosure of sold/ booked inventoryFile: AVANTE - B WING.pdf29 Oct 2024
Disclosure of sold/ booked inventoryFile: AVANTE - C WING.pdf29 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AVANTE Form 1.pdf29 Oct 2024
Certificates of CA (Form 3)File: Form - 3 Avante.pdf29 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2 Avante.pdf29 Oct 2024
Disclosure of sold/ booked inventoryFile: AVANTE - A WING.pdf29 Oct 2024
Disclosure of sold/ booked inventoryFile: AVANTE - B WING.pdf29 Oct 2024
Disclosure of sold/ booked inventoryFile: AVANTE - C WING.pdf29 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM-5 - AVANTE.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM-5 - AVANTE.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM-5 - AVANTE.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: Avante.pdf6 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Avante.pdf26 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM -2-AVANTE.pdf26 Jul 2024
Certificates of CA (Form 3)File: FORM -3 - AVANTE.pdf26 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 1.pdf3 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2.pdf3 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 3.pdf3 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 4.pdf3 May 2024
Disclosure of sold/ booked inventoryFile: AVANTE.pdf3 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Avante.pdf30 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2 - Sheth Avante.pdf22 Apr 2024
Certificates of CA (Form 3)File: FORM-3 - Avante.pdf22 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: Full CC for wing C.pdf29 Mar 2024
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate Avante.pdf29 Mar 2024
Disclosure of sold/ booked inventoryFile: Avante.pdf2 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Avante.pdf16 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Avante.pdf16 Jan 2024
Certificates of CA (Form 3)File: Form 3 - Avante.pdf16 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 1) 1st quater.pdf7 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2) 2nd quater.pdf7 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 3) 3rd quater.pdf7 Dec 2023

Promoter's earlier projects9

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise7 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SIGMAZANDU PHARMACTICAL GOKHALE ROAD SOUTH DADAR W MUMBAI - 25.260CompletedJul 2014Late, Dec 2014
VIVIANA MALLViviana Mall Voltas Compound Pokharan Rd No 2 Majiwade Thane w 400601240CompletedMay 2013May 2013
Vasant LawnsVasant Lawns Voltas Compound Pokharan Rd No 2 Majiwade Thane w 400601465CompletedMar 2012Late, Nov 2013
BEAUMONDEAPPASAHEB MARATHE MARG PRABHADEVI MUMBAI 25196CompletedDec 2011Late, Jan 2012
VASANT MARVELWESTRN EXPRESS HIGHWAY VILLAGE MAGATHANE BORIWALI EAST MUMBAI - 66641CompletedOct 2011Late, Jul 2012
CYNERGYAPPASAHEB MARATHE MARG PRABHADEVI MUMBAI 2533CompletedSep 2011Sep 2011
VASANT GALAXYJUNCTION OF MG ROAD AND LINK ROAD BANGUR NAGAR GOREGAON WEST MUMBAI803CompletedOct 2010Late, Mar 2011
VASANT VALLEYMALAD EAST MUMBAI 96127CompletedJun 2010Late, Dec 2010
VASANT GARDENSWAPNA NAGARI OFF LBS MARG MULUND WEST MUMBAI 801,825CompletedMar 2007Late, Dec 2007

How this compares with Mumbai Suburban

99%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 60 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AVANTE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kanjur Marg6,700+ in Mumbai Suburban

2 kmAVANTECompleted 43Lapsed / revoked 36Other 94Dot size: filed unitsN

Filed coordinates, straight-line distance. 173 registered projects within 2 km.

Builder: Sanjeevani Vyapaar LLP

Sanjeevani Vyapaar LLP has 1 registration on MahaRERA, including AVANTE. Its filings disclose 10 earlier MahaRERA projects: declares 2 of 9 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if AVANTE is delayed beyond 30 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AVANTE?

The registered promoter entity is Sanjeevani Vyapaar LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AVANTE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against AVANTE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for AVANTE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AVANTE?

The professionals named in the filing: Architect: SANDEEP SHIKRE & ASSOCIATES; Architect: AAKAR ARCHITECT AND CONSULTANT; Engineer: Muhammad Shoeb CHOUHAN; Engineer: Deepak N Gaikwad; Engineer: SMARTY LACHHWANI; Engineer: Anas Shaikh. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AVANTE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AVANTE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AVANTE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.