Home / Browse projects / Thane, Maharashtra / AUROVILLE A AND B WING

Completed No litigation declared Residential / Group Housing project

AUROVILLE A AND B WING

By ARYA CONSTRUCTION

RG-MH-78206 · RERA P51700047056 · Last updated on MahaRERA portal: 23 Mar 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
18 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
12 of 70Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 98 documents Report an error

AUROVILLE A AND B WING is a Residential / Group Housing project by ARYA CONSTRUCTION in Thane, Maharashtra, registered with MahaRERA as P51700047056 on 27 Sep 2022. The registration is recorded completed; possession was promised by 31 Dec 2025. 58 of the 70 units on this registration are recorded sold or booked, and 18 of 22 construction stages are filed complete.

At a glance

Project

  • NameAUROVILLE A AND B WING
  • TypeResidential / Group Housing
  • Location
    • DIVA PANPADA ROAD
    • SANDAP
    • DOMBIVLI
    • Kalyan
    • Thane
    • 421204
  • Pincode421204
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700047056
  • ReraGenie IDRG-MH-78206

Builder

  • NameARYA CONSTRUCTION
  • Entity typePartnership
  • PartnersKINJAL DUDHAGARA, PRAVINBHAI PATEL, HITESH PATEL
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredSep 2022PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on27 Sep 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed98 files

Current status

83%58 of 70 units booked

Figures as on 23 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AUROVILLE A WINGNA8742042
AUROVILLE B WINGNA8728028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 23 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

AUROVILLE A WING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
AUROVILLE B WING73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes20%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed122

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots122
Open Space122
BuildingOpen SpaceTotal
AUROVILLE A WING6161
AUROVILLE B WING6161

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,080 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Nov 2025

Approvals and building plan

Sanctioning authorityKALYAN DOMBIVALI MUNICIPAL CORPORATION, KALYAN
Permissible FSI14560.95
Proposed, not sanctioned4,561 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGHATKOPAR EAST

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR R C MODAK
EngineerER VIKAS GOKHALE
Chartered AccountantKETAN NANJI GADA
Chartered AccountantA H NAGDA & ASSOCIATES
PartnerRole in project
ARYA CONSTRUCTION-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed98

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: OC PLANS.pdf23 Mar 2026
Occupational CertificateFile: OC VERIFICATION EMAIL.pdf23 Mar 2026
Form 2A (FY 2023-2024)File: FORM 2A_ MARCH 24_ AUROVILLE A & B WING.pdf25 Nov 2025
Form 2A (FY 2024-2025)File: FORM 2A_ MARCH 25_ AUROVILLE A & B WING.pdf25 Nov 2025
Occupational CertificateFile: wing A OC.pdf25 Nov 2025
Occupational CertificateFile: OC WING B & C.pdf25 Nov 2025
Form 1File: FORM 1_ SEP 25_ AUROVILLE WING A & B.pdf30 Oct 2025
Form 2File: FORM 2_ SEP 25_ AUROVILLE WING A & B.pdf30 Oct 2025
Form 3File: FORM 3_ SEP 25_ AUROVILLE WING A & B.pdf30 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ SEP 25_ AUROVILLE WING A & B.pdf30 Oct 2025
Form 5 (FY 2023-2024)File: form - 5.pdf30 Oct 2025
Form 5 (FY 2024-2025)File: FORM 5_ MARCH 25_ AUROVILLE A & B WING.pdf30 Sep 2025
Form 1File: FORM 1_ JUNE 25_ AUROVILLE B WING.pdf12 Aug 2025
Form 2File: FORM 2_ JUNE 25_ AUROVILLE B WING.pdf12 Aug 2025
Form 3File: FORM 3_ JUNE 25_ AUROVILLE A & B WING.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_JUNE 25_AUROVILLE A AND B WING.pdf12 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ MARCH 25_ ARYA CONSTRUCTION_ AUROVILLE WING A AND B.pdf6 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_MARCH 25_ ARYA CONSTRUCTION_ AUROVILLE WING A AND B.pdf6 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ MARCH 25_ ARYA CONSTRUCTION_ AUROVILLE WING A AND B_compressed.pdf6 May 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_MARCH 25_ ARYA CONSTRUCTION_ AUROVILLE WING A AND B.pdf6 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 FORM 1_Arya Construction_AUROVILLE A AND B WING_DEC 2024.pdf18 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 FORM 3_Arya Construction_AUROVILLE A AND B WING_DEC 2024.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 FORM 2_Arya Construction_AUROVILLE A AND B WING_DEC 2024.pdf18 Feb 2025
Disclosure of sold/ booked inventoryFile: 4 SOLD UNSOLD_Arya Construction_AUROVILLE A AND B WING_DEC 2024.pdf18 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 FORM 1_ SEP 24 A.pdf20 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 FORM 2_ SEP 24.pdf20 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 FORM 3_ SEP 24.pdf20 Nov 2024
Disclosure of sold/ booked inventoryFile: 4 SOLD UNSOLD_ SEP 24 (2).pdf20 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 FORM 1_ SEP 24 A.pdf20 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 FORM 3_ SEP 24.pdf20 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 FORM 2_ SEP 24.pdf20 Nov 2024
Disclosure of sold/ booked inventoryFile: 4 SOLD UNSOLD_ SEP 24 (2).pdf20 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 FORM 1_ JUNE 24.pdf8 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 FORM 2_ JUNE 24.pdf8 Aug 2024
Disclosure of sold/ booked inventoryFile: 4 SOLD UNSOLD_ JUNE 24.pdf8 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 FORM 3_ JUNE 24.pdf8 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-AUROVILLE_MAR 24.pdf6 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-AUROVILLE_MAR 24.pdf6 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-AUROVILLE_MAR 24.pdf6 Jun 2024
Building plan approvalFile: scan0173_compressed.pdf26 Mar 2024
Building plan approvalFile: scan0174_compressed.pdf26 Mar 2024
Building plan approvalFile: scan0175_compressed.pdf26 Mar 2024
Building plan approvalFile: scan0176_compressed.pdf26 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: scan0173_compressed.pdf26 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: scan0174_compressed.pdf26 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: scan0175_compressed.pdf26 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: scan0176_compressed.pdf26 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf26 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-AUROVILLE_DEC 23.pdf21 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-AUROVILLE_DEC 23.pdf21 Feb 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD-AUROVILLE_DEC 23.pdf21 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-AUROVILLE_DEC 23.pdf21 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-AUROVILLE_SEP 23_compressed.pdf26 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-AUROVILLE_SEP 23.pdf26 Oct 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD-AUROVILLE_SEP 23.pdf26 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-AUROVILLE_SEP 23_compressed.pdf26 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5-AUROVILLE_22-23.pdf26 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A-AUROVILLE A and B_MAR 23.pdf29 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A-AUROVILLE A and B_MAR 23.pdf29 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A-AUROVILLE A and B_MAR 23.pdf29 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A-AUROVILLE A and B_MAR 23.pdf29 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-AUROVILLE A AND B_MAR 23.pdf6 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-AUROVILLE A and B_MAR 23.pdf6 May 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD-AUROVILLE A and B_MAR 23.pdf6 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-AUROVILLE A and B_MAR 23.pdf6 May 2023
Layout approvalFile: LAYOUT.pdf15 Nov 2022
Building plan approvalFile: PLAN 1_compressed.pdf15 Nov 2022
Building plan approvalFile: PLAN 2_compressed.pdf15 Nov 2022
Building plan approvalFile: PLAN 3_compressed (1).pdf15 Nov 2022
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf15 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: PLAN 1_compressed.pdf15 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: PLAN 2_compressed.pdf15 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: PLAN 3_compressed (1).pdf15 Nov 2022
Deviation Report with respect to model copy of AgreementFile: Deviazstion Report Bhopar.pdf7 Sep 2022
Other - LegalFile: KINJAL AGREEMENT.pdf7 Sep 2022
Deviation Report with respect to Allotment letterFile: Deviation letter.pdf3 Aug 2022
Copy of the legal title reportFile: LEGAL TITLE REPORT.pdf2 Aug 2022
Copy of the legal title reportFile: FLOW OF THE TITLE OF THE SAID LAND.pdf2 Aug 2022
Building plan approvalFile: BUILDING PLAN 1_compressed.pdf20 Jul 2022
Building plan approvalFile: BUILDING PLAN 2_compressed.pdf20 Jul 2022

How this compares with Thane

83%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AUROVILLE A AND B WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SANDAP7,600+ in Thane

2 kmAUROVILLE A AND B WINGCompleted 16Lapsed / revoked 13Other 48Dot size: filed unitsN

Filed coordinates, straight-line distance. 77 registered projects within 2 km.

Builder: ARYA CONSTRUCTION

ARYA CONSTRUCTION has 2 registrations on MahaRERA, including AUROVILLE A AND B WING and AUROVILLE WING C AND D. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if AUROVILLE A AND B WING is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AUROVILLE A AND B WING?

The registered promoter entity is ARYA CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AUROVILLE A AND B WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AUROVILLE A AND B WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AUROVILLE A AND B WING?

The professionals named in the filing: Architect: AR R C MODAK; Engineer: ER VIKAS GOKHALE; Chartered Accountant: KETAN NANJI GADA; Chartered Accountant: A H NAGDA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AUROVILLE A AND B WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AUROVILLE A AND B WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AUROVILLE A AND B WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.