Home / Browse projects / Mumbai City, Maharashtra / Aura Bliss

Registered No litigation declared Others project

Aura Bliss

By Aura Monde LLP

RG-MH-26996 · RERA P51900012309 · Last updated on MahaRERA portal: 6 Jun 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 42 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 42 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 30%
31 of 34Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 100 documents Report an error

Aura Bliss is a Others project by Aura Monde LLP in Mumbai City, Maharashtra, registered with MahaRERA as P51900012309 on 1 Sep 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 42 months from the original filing. 3 of the 34 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameAura Bliss
  • TypeOthers
  • Location
    • Katrak Road
    • Mumbai City
    • 400031
  • Pincode400031
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900012309
  • ReraGenie IDRG-MH-26996

Builder

  • NameAura Monde LLP
  • Entity typePartnership
  • GSTIN27ABUFA9979M1Z3
  • PartnersNilesh Jani, Sanket Panchal

Key dates

this monthRegisteredSep 2017First promiseJun 2024Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Sep 2017
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Jun 2024)
  • Buildings1 building record
  • Documents filed100 files

Current status

9%3 of 34 units booked
24.0%Work done, per cost certificate

Figures as on 6 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AURA BLISSNA141434034

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 30%.

AURA BLISS: 40% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed24

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots24
Closed/Covered24

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area509 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2111.94
Proposed, not sanctioned1,684 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKOHINOOR INDUSTRIAL ESTATE,FIRST FLOOR,FOREGAON EAST,MUMBAI 400063
Estimated costRs 16.00 cr
Cost incurredRs 3.84 cr
Work done24.0%
BuildingWingEstimatedIncurred
AURA BLISSNARs 15.20 crRs 3.84 cr
-NARs 80.00 lakh-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJ G KAWA AND ASSOCIATES
ArchitectDesign Centric Studio
EngineerTAVSE & ASSOCIATES
EngineerSK Consultants & Engineers
Chartered AccountantRutuja Narsingh & Associates
Chartered AccountantPratiksha Tulshyan & Associates
Chartered AccountantNB Sayed & Associates
PartnerRole in project
Aura Monde LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900024426Jun 2024 → Dec 2027

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 66.67% allottees for purpose of extension of RERA registration period of the said project.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000480293BHARATI DHANANJAY PATILRAJESH JAIN28/04/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Jun 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Jun 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed100

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Form 5 - Neumec Aura for FY 2024-25.pdf6 Jun 2026
Layout approvalFile: Page 1 - Plot Area Permissible and Sanctioned BUA and Tenement Highlighted.pdf5 Jun 2026
Building plan approvalFile: Page 2 - Parking Highlighted.pdf5 Jun 2026
Building plan approvalFile: Page 3.pdf5 Jun 2026
Building plan approvalFile: Page 4.pdf5 Jun 2026
Building plan approvalFile: Page 5.pdf5 Jun 2026
Building plan approvalFile: Page 6.pdf5 Jun 2026
Withdrawal Update Form 1File: Form 1 - Neumec Aura as on Mar 26 (Signed).pdf5 Jun 2026
Withdrawal Update Form 2File: Form 2 - Neumec Aura as on March 2026 (Signed).pdf5 Jun 2026
Withdrawal Update Form 3File: Form 3 - Neumec Aura as on Mar 2026 (Signed).pdf5 Jun 2026
Withdrawal Update Form 1File: Form 1 - Neumec Aura as on Dec 2025.pdf14 May 2026
Withdrawal Update Form 2File: Form 2 - Neumec Aura as on Dec 2025.pdf14 May 2026
Withdrawal Update Form 3File: Form 3 - Neumec Aura as on Dec 2025.pdf14 May 2026
Withdrawal Update Form 1File: Form 1 - Neumec Aura as on Sep 2025.pdf27 Nov 2025
Withdrawal Update Form 2File: Form 2 - Neumec Aura as on Sep 2025.pdf27 Nov 2025
Withdrawal Update Form 3File: Form 3 - Neumec Aura as on Sep 2025.pdf27 Nov 2025
Form 2File: Form 2 - Neumec Aura as on March 2025 (1).pdf14 Jun 2025
Form 1File: Form 1 - Aura Monde LLP.pdf14 Jun 2025
Form 3File: Form 3 Aura Monde LLp.pdf14 Jun 2025
Disclosure of Sold and Booked InventoryFile: CIRCULAR_29.pdf14 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form_2-_Neumec_Aura_as_on_March_2024signed.pdf27 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 2024.pdf25 Jul 2024
Disclosure of sold/ booked inventoryFile: CIRCULAR_29.pdf25 Jul 2024
Certificates of CA (Form 5)File: _Form_5___FY_2017-18_.pdf25 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: _Form_5___FY_2018-19_.pdf25 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: _Form_5___FY_2019-20_.pdf25 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: _Form_5___FY_2020-21_.pdf25 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: _Form_5___FY_2021-22_.pdf25 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: _Form_5___FY_2022-23_.pdf25 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera_Cert_3.pdf19 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf16 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf16 Jul 2024
Certificates of CA (Form 3)File: 15 Certificates of CA (Form 3).pdf16 Jul 2024
Declaration in FORM BFile: FORM_-B_-_Shree_Maruti_Developers.pdf12 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form-2A-2019-20.pdf12 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf12 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form-2A-2021-22.pdf12 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A-2022-23.pdf12 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A-2023-24.pdf12 Jul 2024
Certificates of CA (Form 3)File: New_Format_Form_3_Neumec_Aura_as_on_31-03-2024.pdf12 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annx_A.pdf12 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format_A.pdf12 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Neumec Aura as on March 2024.pdf3 Jul 2024
Certificates of CA (Form 3)File: New Format Form 3 Neumec Aura as on 31-03-2024.pdf3 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Neumec Aura as on Dec 2023.pdf17 Jan 2024
Certificates of CA (Form 3)File: New Format Form 3 Neumec Aura as on 31-12-2023.pdf17 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Neumec Aura as on September 2023.pdf5 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Neumec Aura as on June 2023.pdf1 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Neumec Aura as on September 2023.pdf1 Nov 2023
Certificates of CA (Form 3)File: Form 3 - Neumec Aura as on 30-09-2023.pdf27 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY22-23 Neumec Aura.pdf26 Sep 2023
Certificates of CA (Form 3)File: Form 3- Neumec Aura as on 30-06-2023.pdf11 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Neumec Aura as on 31-03-2023.pdf5 Jul 2023
Certificates of CA (Form 3)File: Form 3- Neumec Aura as on 31-03-2023.pdf5 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Neumec Aura as on December 2022.pdf27 Jan 2023
Certificates of CA (Form 3)File: Form 3 Neumec Aura as on December 2022.pdf27 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Neumec Aura Form 2- September 2022.pdf2 Dec 2022
Certificates of CA (Form 3)File: Form 3 Neumec Aura as on September 2022_compressed.pdf2 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Certificate 273.pdf30 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Neumec Aura Form 2- 30 June 2022.pdf12 Aug 2022
Certificates of CA (Form 3)File: New Format Form 3 Neumec Aura 30-06-2022.pdf12 Aug 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Neumec Aura Form 2- 31 March 2022.pdf16 Jun 2022
Certificates of CA (Form 3)File: New Format Form 3 Neumec Aura 31-03-2022_compressed.pdf16 Jun 2022
Declaration about Commencement CertificateFile: Aura-_Form_D-2022.pdf27 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Neumec Aura Sept 2021_compressed.pdf19 Feb 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Neumec Aura Dec 2021_compressed.pdf19 Feb 2022
CERSAI detailsFile: Neumec Aura.pdf19 Feb 2022
Certificates of CA (Form 3)File: Form 3 Neumec Aura 30-09-2021_compressed.pdf19 Feb 2022
Certificates of CA (Form 3)File: Form 3 Neumec Aura 31-12-2021_compressed.pdf19 Feb 2022
Certificates of CA (Form 3)File: Form 3 Neumec Aura Mar 21.pdf11 Oct 2021
Certificates of CA (Form 3)File: Form 3 Neumec Aura Jun 21.pdf11 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 FY 18-19 Neumec Aura.pdf11 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY 19-20 Neumec Aura.pdf11 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 20-21 Neumec Aura.pdf11 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: FurtherCC_signed__2_ (1).pdf16 Aug 2021
Declaration about Commencement CertificateFile: Aura_-Form-D.pdf16 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1-_done_compressed.pdf16 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Neuemc_Aura-Form_2A_compressed.pdf16 Aug 2021
Certificates of CA (Form 5)File: RERA Form 5.pdf11 Feb 2019
Building plan approvalFile: SMD IOD.pdf29 Jul 2017

How this compares with Mumbai City

9%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one moved by 42 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Aura Bliss on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mumbai City780+ in Mumbai City

2 kmAura BlissCompleted 80Lapsed / revoked 55Other 80Dot size: filed unitsN

Filed coordinates, straight-line distance. 215 registered projects within 2 km.

Builder: Aura Monde LLP

Aura Monde LLP has 1 registration on MahaRERA, including Aura Bliss. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if Aura Bliss is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Aura Bliss?

The registered promoter entity is Aura Monde LLP, a partnership as per the filing. Its GSTIN 27ABUFA9979M1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Aura Bliss?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Aura Bliss?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Aura Bliss?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Aura Bliss?

The professionals named in the filing: Architect: J G KAWA AND ASSOCIATES; Architect: Design Centric Studio; Engineer: TAVSE & ASSOCIATES; Engineer: SK Consultants & Engineers; Chartered Accountant: Rutuja Narsingh & Associates; Chartered Accountant: Pratiksha Tulshyan & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Aura Bliss?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Aura Bliss. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Aura Bliss to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.