Home / Browse projects / AUGUST TOWERS PH 1
AUGUST TOWERS PH 1
RG-MH-41827 · RERA P52100048195 · Last updated on MahaRERA portal: 27 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AUGUST TOWERS PH 1 is a Others project by Bramhacorp Limited in -, 411014, registered with MahaRERA as P52100048195 on 15 Dec 2022. Possession is promised by 31 Dec 2028. 260 of the 314 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameAUGUST TOWERS PH 1
- TypeOthers
- Location
- -
- 411014
- Pincode411014
- RERA no.P52100048195
- ReraGenie IDRG-MH-41827
Builder
- NameBramhacorp Limited
- Entity typeCompany
- CINU70101PN2012PLC142705
- GSTIN27AAFCB0273N1ZI
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- Other registrations25 more →
- Completed8 of 26
- No longer live1 lapsed, de-registered or revoked
- Past their filed date1
- Declared earlier projects4 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on15 Dec 2022
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings1 building record
- Documents filed133 files
Current status
Figures as on 27 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| F1 | NA | 34 | 29 | 308 | 6 | 314 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 27 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 61%.
F1: 33% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 61% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 2% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 27 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed536
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership9
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| BAJAJ ELECTRICALS LIMITED | Mumbai City | Mumbai City |
| RAMKUMAR BRAMHADUTT AGRAWAL | Ghorpadi | Pune |
| VINODKUMAR B AGRAWAL | Ghorpadi | Pune |
| AJAY R AGRAWAL | Ghorpadi | Pune |
| DINESH M AGRAWAL | Ghorpadi | Pune |
| MONIKA MITTAL | Ghorpadi | Pune |
| SONIKA AGARWAL | Ghorpadi | Pune |
| MALVIKA GUPTA | Ghorpadi | Pune |
| MEGHA BAGLA | Ghorpadi | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| F1 | NA | Rs 88.89 cr | Rs 33.10 cr |
| - | NA | Rs 5.34 cr | Rs 1.60 cr |
Certifying professionals and partners9
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | FOURTH DIMENSION ARCHITECT PVT LTD |
| Architect | SACHIN SHAH |
| Architect | Padmakar Kole |
| Architect | Imran Shaikh |
| Engineer | PANKAJKUMAR A SOMVANSHI |
| Engineer | Dattatray Gaikwad |
| Chartered Accountant | FAIZ SHAIKH AND CO |
| Chartered Accountant | F A A & Associates LLP |
| Chartered Accountant | S D Kharadkar & Associates |
| Partner | Role in project |
|---|---|
| Bramhacorp Limited | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12600382 | Varun Ashok Agarwal | Bramhacorp Limited | 21/01/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Dec 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Nov 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Jan 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 31 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed133
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 133 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1_Mar 26_August Towers P1.pdf | 27 Apr 2026 |
| Withdrawal Update Form 2File: Form 2_Mar 26_August Towers P1.pdf | 27 Apr 2026 |
| Withdrawal Update Form 3File: Form 3_Mar 26_August Towers P1.pdf | 27 Apr 2026 |
| Withdrawal Update Form 1File: Form 1_Dec 25_ August Tower P1.pdf | 22 Jan 2026 |
| Withdrawal Update Form 2File: Form 2_Dec 25_ August Tower P1.pdf | 22 Jan 2026 |
| Withdrawal Update Form 3File: Form 3_Dec 25_ August Tower P1.pdf | 22 Jan 2026 |
| Withdrawal Update Form 1File: Form 1_Sep 25_August Tower P1.pdf | 30 Oct 2025 |
| Withdrawal Update Form 2File: Form 2_Sep 25_August Towers P1.pdf | 30 Oct 2025 |
| Withdrawal Update Form 3File: Form 3_Sep 25_August Tower P1.pdf | 30 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5_FY 2024-25_August Towers.pdf | 30 Sep 2025 |
| Withdrawal Update Form 1File: Form 1_June 25_August Towers.pdf | 28 Aug 2025 |
| Withdrawal Update Form 1File: Form 1_June 25_August Towers.pdf | 28 Aug 2025 |
| Withdrawal Update Form 2File: Form 2_June 25_August Tower.pdf | 28 Aug 2025 |
| Withdrawal Update Form 2File: Form 2_June 25_August Tower.pdf | 28 Aug 2025 |
| Withdrawal Update Form 3File: Form 3_June 25_August Tower.pdf | 28 Aug 2025 |
| Withdrawal Update Form 3File: Form 3_June 25_August Tower.pdf | 28 Aug 2025 |
| Form 2A (FY 2024-2025)File: August Tower.pdf | 30 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Mar 25_August Towers.pdf | 21 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold_Mar 25_August Towers.pdf | 21 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Mar 25_August Towers.pdf | 20 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Mar 25_August Towers.pdf | 18 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Dec 24_August Towers.pdf | 23 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: August Towers.pdf | 21 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Dec 24_August Towers.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Dec 24_August Towers.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Nov 24_August Towers.pdf | 22 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: August Towers.pdf | 14 Nov 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance AT.pdf | 25 Oct 2024 |
| Declaration in FORM BFile: Form B August Towers.pdf | 25 Oct 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Details AT.pdf | 25 Oct 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrance AT.pdf | 25 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: August Towers.pdf | 21 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Sep 24_August Towers.pdf | 20 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Sep 24_August Towers.pdf | 20 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_2023-24_August Towers.pdf | 14 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: AUGUST TOWERS.pdf | 2 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_June 24_August Tower.pdf | 24 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Jun 24_August Towers.pdf | 24 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Jun 24_August Tower Ph 1.pdf | 13 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_Jun 24_August Tower Ph 1.pdf | 13 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Mar 24_August Tower Ph 1.pdf | 27 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Mar 24_August.pdf | 27 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_Mar 24_August Tower.pdf | 27 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: August Towers.pdf | 27 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Mar 24_August.pdf | 27 Apr 2024 |
| Building plan approvalFile: Sheet 52 - F1 Building Floor Plan Calculations_compressed.pdf | 31 Jan 2024 |
| Building plan approvalFile: Sheet 53 - F1 Building Floor Plan Calculations_compressed.pdf | 31 Jan 2024 |
| Building plan approvalFile: Sheet 54 - F1 Building Elevation_compressed.pdf | 31 Jan 2024 |
| Building plan approvalFile: Sheet 55 - F1 Building Section.pdf | 31 Jan 2024 |
| Building plan approvalFile: Sheet 56 - F1 Building Section.pdf | 31 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 52 - F1 Building Floor Plan Calculations_compressed.pdf | 31 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 53 - F1 Building Floor Plan Calculations_compressed.pdf | 31 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 54 - F1 Building Elevation_compressed.pdf | 31 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 55 - F1 Building Section.pdf | 31 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 56 - F1 Building Section.pdf | 31 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 31 Jan 2024 |
| Declaration about Commencement CertificateFile: CC.pdf | 31 Jan 2024 |
| Declaration about Commencement CertificateFile: Declaration about commencement AT.pdf | 31 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 August Towers.pdf | 31 Jan 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration for Bank details.pdf | 31 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Dec 23_August Tower Ph 1.pdf | 19 Jan 2024 |
| CERSAI detailsFile: AUGUST TOWER.pdf | 19 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: AUGUST TOWER.pdf | 19 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Dec 23_August Tower Ph 1.pdf | 19 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Dec 23_August Tower Ph 1.pdf | 18 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_Dec 23_August Tower Ph 1.pdf | 18 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance - August Towers.pdf | 15 Dec 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance - August Towers.pdf | 15 Dec 2023 |
| Declaration in FORM BFile: Form B Declaration - August Towers.pdf | 15 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: AUGUST TOWER.pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_August Tower_Sep 23.pdf | 20 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_August Tower_Sep 23.pdf | 19 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_August Tower_Sep 23.pdf | 18 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_August Tower_Sep 23.pdf | 18 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: August Towers.pdf | 30 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: August Towers Ph1 Form 3_ Jun 2023_.pdf | 21 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AUGUST TOWERS PH1.pdf | 4 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_August Tower Ph1 _June 2023.pdf | 31 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate Form 2A- August Tower.pdf | 31 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Inventory_August Tower.pdf | 28 Jul 2023 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Bramha Exuberance CP52100001076 | KONDHWA, Pune | - | Jul 2017 | Completed | Dec 2021 | Jan 2019 |
| Bramha Vantage A / B | Survey No 6 Hissa No 10 1B Bavdhan Khurd Taluka Mulshi District Pune | 51 | - | Completed | Aug 2017 | Apr 2017 |
| Bramha Baug | Survey No 55B Hissa No 1A 2B at Village Ghorpadi Taluka Haveli District Pune | 8 | - | Completed | Jan 2017 | Late, Feb 2017 |
| Bramha Suncity Platinum | S No 7 Hissa No 1 to 5 S No 8 Hissa No 1 1 2 S No 38A Hissa No 1B 1 S No 38A Hissa No 1A S No 38B Village Wadgaon Sheri Pune | 134 | - | Completed | Sep 2014 | Sep 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 25 other registrations, which the RERA portal never shows together
- All 133 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep AUGUST TOWERS PH 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near -
VJ IndiLife Kharadi
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
VJ Central Avenue
Vilas Javdekar Eco Homes
VJ IndiWorks Kharadi Central
Vilas Javdekar Eco Homes
RIVERDALE GRAND
DUVILLE ESTATES PRIVATE LIMITED
Yashwin Orizzonte Phase II
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
ZEN ESTATE
DESTINATION KHARADI DEVELOPERS LLP
Builder: Bramhacorp Limited
Bramhacorp Limited has 26 registrations on MahaRERA, including Bramha Exuberance C and F RESIDENCES T5 T6 and T7. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 4 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record.
Frequently asked questions
What are my rights if AUGUST TOWERS PH 1 is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AUGUST TOWERS PH 1?
The registered promoter entity is Bramhacorp Limited, a company as per the filing. Its CIN U70101PN2012PLC142705 and GSTIN 27AAFCB0273N1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AUGUST TOWERS PH 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against AUGUST TOWERS PH 1?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for AUGUST TOWERS PH 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AUGUST TOWERS PH 1?
The professionals named in the filing: Architect: FOURTH DIMENSION ARCHITECT PVT LTD; Architect: SACHIN SHAH; Architect: Padmakar Kole; Architect: Imran Shaikh; Engineer: PANKAJKUMAR A SOMVANSHI; Engineer: Dattatray Gaikwad. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AUGUST TOWERS PH 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback