Home / Browse projects / AUGUST TOWERS PH 1

Registered No litigation declared Others project

AUGUST TOWERS PH 1

By Bramhacorp Limited

RG-MH-41827 · RERA P52100048195 · Last updated on MahaRERA portal: 27 Apr 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Dec 2028Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 61%
54 of 314Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 133 documents Report an error

AUGUST TOWERS PH 1 is a Others project by Bramhacorp Limited in -, 411014, registered with MahaRERA as P52100048195 on 15 Dec 2022. Possession is promised by 31 Dec 2028. 260 of the 314 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameAUGUST TOWERS PH 1
  • TypeOthers
  • Location
    • -
    • 411014
  • Pincode411014
  • RERA no.P52100048195
  • ReraGenie IDRG-MH-41827

Builder

  • NameBramhacorp Limited
  • Entity typeCompany
  • CINU70101PN2012PLC142705
  • GSTIN27AAFCB0273N1ZI
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Other registrations25 more →
  • Completed8 of 26
  • No longer live1 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects4 →

Key dates

this monthRegisteredDec 2022PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Dec 2022
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed133 files

Current status

83%260 of 314 units booked
36.8%Work done, per cost certificate

Figures as on 27 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
F1NA34293086314

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 61%.

F1: 33% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure61%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises2%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed536

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots536
Closed/Covered173
Open Space363

Land and ownership9

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area879 sq m
Land owned byThe promoter, with other names on the file
Named landowners9
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on11 Aug 2025
LandownerVillageDistrict
BAJAJ ELECTRICALS LIMITEDMumbai CityMumbai City
RAMKUMAR BRAMHADUTT AGRAWALGhorpadiPune
VINODKUMAR B AGRAWALGhorpadiPune
AJAY R AGRAWALGhorpadiPune
DINESH M AGRAWALGhorpadiPune
MONIKA MITTALGhorpadiPune
SONIKA AGARWALGhorpadiPune
MALVIKA GUPTAGhorpadiPune
MEGHA BAGLAGhorpadiPune

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI21807.0
Proposed, not sanctioned21,807 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPlot No 1, City Mall, Ganeshkhind Road, Pune
Estimated costRs 94.23 cr
Cost incurredRs 34.71 cr
Work done36.83%
BuildingWingEstimatedIncurred
F1NARs 88.89 crRs 33.10 cr
-NARs 5.34 crRs 1.60 cr

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectFOURTH DIMENSION ARCHITECT PVT LTD
ArchitectSACHIN SHAH
ArchitectPadmakar Kole
ArchitectImran Shaikh
EngineerPANKAJKUMAR A SOMVANSHI
EngineerDattatray Gaikwad
Chartered AccountantFAIZ SHAIKH AND CO
Chartered AccountantF A A & Associates LLP
Chartered AccountantS D Kharadkar & Associates
PartnerRole in project
Bramhacorp Limited-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12600382Varun Ashok AgarwalBramhacorp Limited21/01/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed133

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 133 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1_Mar 26_August Towers P1.pdf27 Apr 2026
Withdrawal Update Form 2File: Form 2_Mar 26_August Towers P1.pdf27 Apr 2026
Withdrawal Update Form 3File: Form 3_Mar 26_August Towers P1.pdf27 Apr 2026
Withdrawal Update Form 1File: Form 1_Dec 25_ August Tower P1.pdf22 Jan 2026
Withdrawal Update Form 2File: Form 2_Dec 25_ August Tower P1.pdf22 Jan 2026
Withdrawal Update Form 3File: Form 3_Dec 25_ August Tower P1.pdf22 Jan 2026
Withdrawal Update Form 1File: Form 1_Sep 25_August Tower P1.pdf30 Oct 2025
Withdrawal Update Form 2File: Form 2_Sep 25_August Towers P1.pdf30 Oct 2025
Withdrawal Update Form 3File: Form 3_Sep 25_August Tower P1.pdf30 Oct 2025
Form 5 (FY 2024-2025)File: Form 5_FY 2024-25_August Towers.pdf30 Sep 2025
Withdrawal Update Form 1File: Form 1_June 25_August Towers.pdf28 Aug 2025
Withdrawal Update Form 1File: Form 1_June 25_August Towers.pdf28 Aug 2025
Withdrawal Update Form 2File: Form 2_June 25_August Tower.pdf28 Aug 2025
Withdrawal Update Form 2File: Form 2_June 25_August Tower.pdf28 Aug 2025
Withdrawal Update Form 3File: Form 3_June 25_August Tower.pdf28 Aug 2025
Withdrawal Update Form 3File: Form 3_June 25_August Tower.pdf28 Aug 2025
Form 2A (FY 2024-2025)File: August Tower.pdf30 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Mar 25_August Towers.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold_Mar 25_August Towers.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Mar 25_August Towers.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Mar 25_August Towers.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Dec 24_August Towers.pdf23 Jan 2025
Disclosure of sold/ booked inventoryFile: August Towers.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Dec 24_August Towers.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Dec 24_August Towers.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Nov 24_August Towers.pdf22 Nov 2024
Disclosure of sold/ booked inventoryFile: August Towers.pdf14 Nov 2024
Details of encumbrances concerned to FinanceFile: Encumbrance AT.pdf25 Oct 2024
Declaration in FORM BFile: Form B August Towers.pdf25 Oct 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Details AT.pdf25 Oct 2024
Details of encumbrances concerned to LegalFile: Encumbrance AT.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: August Towers.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Sep 24_August Towers.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Sep 24_August Towers.pdf20 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_2023-24_August Towers.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: AUGUST TOWERS.pdf2 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_June 24_August Tower.pdf24 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Jun 24_August Towers.pdf24 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Jun 24_August Tower Ph 1.pdf13 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_Jun 24_August Tower Ph 1.pdf13 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Mar 24_August Tower Ph 1.pdf27 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Mar 24_August.pdf27 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_Mar 24_August Tower.pdf27 Apr 2024
Disclosure of sold/ booked inventoryFile: August Towers.pdf27 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Mar 24_August.pdf27 Apr 2024
Building plan approvalFile: Sheet 52 - F1 Building Floor Plan Calculations_compressed.pdf31 Jan 2024
Building plan approvalFile: Sheet 53 - F1 Building Floor Plan Calculations_compressed.pdf31 Jan 2024
Building plan approvalFile: Sheet 54 - F1 Building Elevation_compressed.pdf31 Jan 2024
Building plan approvalFile: Sheet 55 - F1 Building Section.pdf31 Jan 2024
Building plan approvalFile: Sheet 56 - F1 Building Section.pdf31 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Sheet 52 - F1 Building Floor Plan Calculations_compressed.pdf31 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Sheet 53 - F1 Building Floor Plan Calculations_compressed.pdf31 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Sheet 54 - F1 Building Elevation_compressed.pdf31 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Sheet 55 - F1 Building Section.pdf31 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Sheet 56 - F1 Building Section.pdf31 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf31 Jan 2024
Declaration about Commencement CertificateFile: CC.pdf31 Jan 2024
Declaration about Commencement CertificateFile: Declaration about commencement AT.pdf31 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 August Towers.pdf31 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration for Bank details.pdf31 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Dec 23_August Tower Ph 1.pdf19 Jan 2024
CERSAI detailsFile: AUGUST TOWER.pdf19 Jan 2024
Disclosure of sold/ booked inventoryFile: AUGUST TOWER.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Dec 23_August Tower Ph 1.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Dec 23_August Tower Ph 1.pdf18 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_Dec 23_August Tower Ph 1.pdf18 Jan 2024
Details of encumbrances concerned to FinanceFile: Encumbrance - August Towers.pdf15 Dec 2023
Details of encumbrances concerned to LegalFile: Encumbrance - August Towers.pdf15 Dec 2023
Declaration in FORM BFile: Form B Declaration - August Towers.pdf15 Dec 2023
Disclosure of sold/ booked inventoryFile: AUGUST TOWER.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_August Tower_Sep 23.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_August Tower_Sep 23.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_August Tower_Sep 23.pdf18 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_August Tower_Sep 23.pdf18 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: August Towers.pdf30 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: August Towers Ph1 Form 3_ Jun 2023_.pdf21 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AUGUST TOWERS PH1.pdf4 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_August Tower Ph1 _June 2023.pdf31 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate Form 2A- August Tower.pdf31 Jul 2023
Disclosure of sold/ booked inventoryFile: Inventory_August Tower.pdf28 Jul 2023

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Bramha Exuberance CP52100001076KONDHWA, Pune-Jul 2017CompletedDec 2021Jan 2019
Bramha Vantage A / BSurvey No 6 Hissa No 10 1B Bavdhan Khurd Taluka Mulshi District Pune51-CompletedAug 2017Apr 2017
Bramha BaugSurvey No 55B Hissa No 1A 2B at Village Ghorpadi Taluka Haveli District Pune8-CompletedJan 2017Late, Feb 2017
Bramha Suncity PlatinumS No 7 Hissa No 1 to 5 S No 8 Hissa No 1 1 2 S No 38A Hissa No 1B 1 S No 38A Hissa No 1A S No 38B Village Wadgaon Sheri Pune134-CompletedSep 2014Sep 2014

Keep AUGUST TOWERS PH 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near -

Builder: Bramhacorp Limited

Bramhacorp Limited has 26 registrations on MahaRERA, including Bramha Exuberance C and F RESIDENCES T5 T6 and T7. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 4 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if AUGUST TOWERS PH 1 is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AUGUST TOWERS PH 1?

The registered promoter entity is Bramhacorp Limited, a company as per the filing. Its CIN U70101PN2012PLC142705 and GSTIN 27AAFCB0273N1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AUGUST TOWERS PH 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against AUGUST TOWERS PH 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for AUGUST TOWERS PH 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AUGUST TOWERS PH 1?

The professionals named in the filing: Architect: FOURTH DIMENSION ARCHITECT PVT LTD; Architect: SACHIN SHAH; Architect: Padmakar Kole; Architect: Imran Shaikh; Engineer: PANKAJKUMAR A SOMVANSHI; Engineer: Dattatray Gaikwad. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AUGUST TOWERS PH 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AUGUST TOWERS PH 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AUGUST TOWERS PH 1 to a free account