ATRIUM SKYWARD WING A
RG-MH-16569 · RERA P52100026273 · Last updated on MahaRERA portal: 20 Oct 2023
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 28 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ATRIUM SKYWARD WING A is a Residential / Group Housing project by ATRIUM HOMES LLP in Pune, Maharashtra, registered with MahaRERA as P52100026273 on 4 Sep 2020. Possession was promised by 30 Jun 2024 and is now 28 months past that date.
At a glance
Project
- NameATRIUM SKYWARD WING A
- TypeResidential / Group Housing
- Location
- UNDRI
- NEAR NIBM
- Haveli
- Pune
- 411060
- Pincode411060
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100026273
- ReraGenie IDRG-MH-16569
Builder
- NameATRIUM HOMES LLP
- Entity typePartnership
- PartnersTejpal Pukhraj Ranka, Gauri Sanjay Lohade, Sanjay Nemichand Lohade, Deepa Santosh Mutha, Rajesh Shriram Kasat, Dharmendra Labhshankar Joshi
- Other registrations2 more →
- Completed1 of 3
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on4 Sep 2020
- Promised completion30 Jun 2024
- Revised completionNone
- Buildings1 building record
- Documents filed52 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING-A | NA | 12 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.
WING-A: 81% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 20 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed22
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | CUBIX ARCHITECTS ASSOCIATES |
| Engineer | SUNIL MUTALIK ASSOCIATES |
| Chartered Accountant | MGSP AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| ATRIUM HOMES LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Aug 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Aug 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Aug 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 31 Aug 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 6 Oct 2023
Documents filed52
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FROM 5 -Wing -A FY 2022-23 (1).PDF | 20 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: From 2A Wing A 30-09-2023.PDF | 11 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Sales Data Wing A 30-09-23 (1).PDF | 11 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Wing A as on 30-09-2023.PDF | 7 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: artium 23.pdf | 7 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Sales Data Wing A 30-09-23.PDF | 7 Oct 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion certificate -WING A ( as on 07-07-2023 ).pdf | 6 Oct 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion certificate -WING A ( as on 07-07-2023 ).pdf | 6 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Atrium Skyward -Wing A Architect's Certificate 31-03-23.PDF | 22 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Atrium Skyward -Wing A Engineer's Certificat 31-03-23.PDF | 22 May 2023 |
| Disclosure of sold/ booked inventoryFile: Atrium Skyward -Wing A Sales Data 31-03-23.PDF | 22 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificates as on 31-12-2022.PDF | 1 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 WING A - 31-12-2022_compressed.pdf | 1 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM-2A WING A - 31-12-2022.PDF | 1 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - Atrium Skyward WING A - Data on 31-12-2022_compressed.pdf | 1 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: Sold unsold.pdf | 23 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 -Atrium Skyward WING A -FY 2020-21.PDF | 14 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 -Atrium Skyward WING A -F Y 2021-22.PDF | 14 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Wing A - As on 30-09-22.pdf | 23 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate From Wing A Merit Green 30-09-2022.PDF | 23 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Wing A from Cubix on 30-6-2022.pdf | 7 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - Wing A from Merit Greens On 30-06-2022_compressed.pdf | 7 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CUBIX Architects Certificate31-03-2022_compressed.pdf | 29 Jun 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Merit Greens Engineer Certificate 31-03-2022_compressed.pdf | 29 Jun 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed.pdf | 1 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Merit Greens 31 -12-2021_compressed.pdf | 1 Apr 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Wing A_compressed.pdf | 1 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Wing A on 30-09-2021.pdf | 31 Mar 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Wing A on 31-12-2021.pdf | 31 Mar 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Merit Greens dt 30-06-2021_compressed.pdf | 31 Mar 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form -2A - Wing A - As on 30-06-2021_compressed.pdf | 31 Mar 2022 |
| Disclosure of sold/ booked inventoryFile: Disclouser of Sold - Unsold in RERA ( Wing A )_compressed.pdf | 31 Mar 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate - Wing A - as on 30-06-2021_compressed.pdf | 14 Aug 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate -Wing A -as On 30-06-2021_compressed.pdf | 14 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form -2A - Wing A - As on 30-06-2021_compressed.pdf | 14 Aug 2021 |
| Layout approvalFile: LAYOUT FINAL 12 mar 2018.pdf | 31 Aug 2020 |
| Building plan approvalFile: NA order.pdf | 31 Aug 2020 |
| PAN CardFile: PAN- ATRIUM HOMES LLP ( Corrected PAN ).PDF | 31 Aug 2020 |
| Copy of the legal title reportFile: 1 Title Report Adv Neelioma Verma-ilovepdf-compressed.pdf | 31 Aug 2020 |
| Copy of the legal title reportFile: 1 SEARCH REPORT 3 PAGE.pdf | 31 Aug 2020 |
| Details of encumbrancesFile: Self Declaration-Encumbrances for Wing -A.PDF | 31 Aug 2020 |
| Copy of Layout Approval (in case of layout)File: LAYOUT FINAL 12 mar 2018.pdf | 31 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: NA order.pdf | 31 Aug 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMICEMENT CERT.pdf | 31 Aug 2020 |
| Declaration in FORM BFile: FORM B ( for WING - A of ATRIUM SKYWARD ).pdf | 31 Aug 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate of WING-A ( As on 31-07-2020)_compressed.pdf | 31 Aug 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 for WING-A ( Fr Merit Greens as on 31-07-2020)_compressed.pdf | 31 Aug 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Wing A Fr Merit Greens on 31 07 20 compressed.pdf | 31 Aug 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A for Wing A (Quality Certificate)-on 31-07-2020_compressed.pdf | 31 Aug 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 ATRIUM SKYWARD WING A.pdf | 31 Aug 2020 |
| Proforma of Allotment letterFile: Agreement to sale WING A.pdf | 31 Aug 2020 |
| Proforma of Allotment letterFile: 03 ALLOTMENT ATRIUM SKYWARD.pdf | 31 Aug 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 52 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep ATRIUM SKYWARD WING A on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NEAR NIBM13,700+ in Pune
Filed coordinates, straight-line distance. 215 registered projects within 2 km.
THE SPECTRUM
SHRIRAM PROPERTIES LIMITED
GANGA MILLENNIA UNDRI BUILDING J,K,L,M AND N
GOEL GANGA INDIA PVT LTD
NYATI ESTEBAN II
NYATI REALTORS LLP
Lodha Pune NIBM Project
Lodha Developers Limited
KHUSH VISTA
Elated Housing LLP
The Atrium
Arhumashtika Life Spaces
Builder: ATRIUM HOMES LLP
ATRIUM HOMES LLP has 3 registrations on MahaRERA, including Atrium Skyward and ATRIUM SKYWARD WING A. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that ATRIUM SKYWARD WING A shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if ATRIUM SKYWARD WING A is delayed beyond 30 Jun 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ATRIUM SKYWARD WING A?
The registered promoter entity is ATRIUM HOMES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ATRIUM SKYWARD WING A?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ATRIUM SKYWARD WING A?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ATRIUM SKYWARD WING A?
The professionals named in the filing: Architect: CUBIX ARCHITECTS ASSOCIATES; Engineer: SUNIL MUTALIK ASSOCIATES; Chartered Accountant: MGSP AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ATRIUM SKYWARD WING A?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback