ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Atrium Skyward

Completed No litigation declared Residential / Group Housing project

Atrium Skyward

By ATRIUM HOMES LLP

RG-MH-11200 · RERA P52100002923 · Last updated on MahaRERA portal: 29 Jul 2021

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2021Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

Atrium Skyward is a Residential / Group Housing project by ATRIUM HOMES LLP in Pune, Maharashtra, registered with MahaRERA as P52100002923 on 4 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2021. 1 complaint is on record with the regulator.

At a glance

Project

  • NameAtrium Skyward
  • TypeResidential / Group Housing
  • Location
    • Hadapsar Undri Road
    • Hole Vasti
    • UNDRI
    • Haveli
    • Pune
    • 411060
  • Pincode411060
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100002923
  • ReraGenie IDRG-MH-11200

Builder

  • NameATRIUM HOMES LLP
  • Entity typePartnership
  • PartnersTejpal Pukhraj Ranka, Gauri Sanjay Lohade, Sanjay Nemichand Lohade, Deepa Santosh Mutha, Rajesh Shriram Kasat, Dharmendra Labhshankar Joshi
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2017PromisedDec 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on4 Aug 2017
  • Promised completion30 Dec 2021
  • Revised completionNone
  • Buildings2 building records
  • Documents filed69 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing BNA120000
Wing CNA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 29 Jul 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

Wing B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wing C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 29 Jul 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed44

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots44
Closed/Covered44
BuildingClosed/CoveredTotal
Wing B2020
Wing C2424

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,099 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI12209.64
Proposed, not sanctioned8,794 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchB U Bhandari Premises 1182/13 F C Road Opp Hotel Lalit Mahal Pune 411005, Maharashtra

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCubix Architects Associates
EngineerSunil Mutalik and Associates
PartnerRole in project
ATRIUM HOMES LLP-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000106412Kamal Hiraman HoleRajesh Shriram Kasat25/12/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Mar 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Feb 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 10 Jul 2021

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration about Commencement CertificateFile: Declartion About Commencement.PDF29 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM -2A Site Engineers Certificate.pdf29 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2-fr Engineers (Merit Greens ) on 31-5-2021_compressed.pdf28 Jul 2021
Certificates of CA (Form 3)File: FORM 3.pdf28 Jul 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate wing -B (1).pdf10 Jul 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate of Wing C.pdf10 Jul 2021
Architect’s Certificate on Completion of Project (Form 4)File: Atrium Homes LLp.pdf10 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 atrium home b and c.pdf4 Feb 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 atrium home b and c.pdf4 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR FORM 1 CUBIX CERTIFICATE_compressed.pdf20 Aug 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Certificate 30 04 2020_compressed.pdf20 Aug 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate (Cubix Architects as on 31-1-2020 )_compressed.pdf25 Jul 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate ( Merit Consultancy as on 31-1-2020 )_compressed.pdf25 Jul 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate ( Merit Consultancy as on 31-1-2020 )_compressed.pdf25 Jul 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate ( Merit Consultancy as on 31-1-2020 )_compressed.pdf25 Jul 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Merit Consultancy as on 31 1 2020 compressed.pdf25 Jul 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Merit Consultancy as on 31 1 2020 compressed.pdf25 Jul 2020
Certificates of CA (Form 3)File: RERA form 3 -30-10-19.pdf14 Feb 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: ATRIUM HOMES LLP- RERA FORM 5 (FY 2018-19).pdf14 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate.pdf8 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers certificate.pdf8 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate from CUBIX ARCHITECT ASSOCIATES on 31-07-2019_compressed (1).pdf28 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate from MERIT CONSULTANCY on 31-07-2019_compressed.pdf28 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate ( Cubix Architect ) as on 31-01-2019.pdf28 May 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MERIT ENGINEER`S CERTIFICATE.PDF28 May 2019
Building plan approvalFile: CUBIX CERTIFICATES.PDF18 Feb 2019
Building Plan Approval (IOD)File: CUBIX CERTIFICATES.PDF18 Feb 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA-FORM2 ( AS ON 31-10-18)-Engineering Certificate from Merit Consultancy.pdf8 Jan 2019
Certificates of CA (Form 3)File: Form 3.pdf5 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arcitects Cretificate as on 31-10-2018-.pdf1 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Cretificate as on 31-10-2018-.pdf1 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf28 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf28 Dec 2018
Certificates of CA (Form 5)File: ATRIUM HOMES LLP-RERA-Form -5.pdf28 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 31-07-2018-ilovepdf-compressed.pdf1 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf1 Sep 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate.pdf1 Sep 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERT.pdf25 Jul 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE.pdf24 Jul 2018
Commencement Certificates / NA Order for plotted developmentFile: COMMICEMENT CERT.pdf22 Mar 2018
Layout approvalFile: REVISED SANCTION LAYOUT-ilovepdf-compressed.pdf19 Mar 2018
Copy of Layout Approval (in case of layout)File: REVISED SANCTION LAYOUT-ilovepdf-compressed.pdf19 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf19 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.PDF19 Mar 2018
OtherFile: 5-13-ilovepdf-compressed.pdf19 Mar 2018
OtherFile: 6-13-ilovepdf-compressed.pdf19 Mar 2018
OtherFile: 7-13-ilovepdf-compressed.pdf19 Mar 2018
OtherFile: 8-13-ilovepdf-compressed.pdf19 Mar 2018
OtherFile: 9-13-ilovepdf-compressed.pdf19 Mar 2018
OtherFile: 10-13-ilovepdf-compressed.pdf19 Mar 2018
OtherFile: 11-13-ilovepdf-compressed.pdf19 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: certificate undri.pdf16 Nov 2017
Building plan approvalFile: IOD ATRIUM.pdf29 Jul 2017
Building plan approvalFile: FINAL POTENTIAL IOD.pdf29 Jul 2017
PAN CardFile: PAN- ATRIUM HOMES LLP ( Corrected PAN ).PDF29 Jul 2017
Building Plan Approval (IOD)File: IOD ATRIUM.pdf29 Jul 2017
Building Plan Approval (IOD)File: FINAL POTENTIAL IOD.pdf29 Jul 2017
Declaration in FORM BFile: FORM B.pdf29 Jul 2017
Certificates of CA (Form 3)File: CA FORM 3 - ATRIUM HOMES LLP.pdf29 Jul 2017
Layout approvalFile: Sanction Plan1-12-min.pdf27 Jul 2017
Copy of the legal title reportFile: 0 search latest verma-ilovepdf-compressed.pdf27 Jul 2017
Copy of the legal title reportFile: 1 Title Report Adv Neelioma Verma-ilovepdf-compressed.pdf27 Jul 2017
Copy of the legal title reportFile: 2 SEARCH REPORT-20-07-17-ilovepdf-compressed.pdf27 Jul 2017
Details of encumbrancesFile: ENCUNBRANCES.pdf27 Jul 2017
Copy of Layout Approval (in case of layout)File: Sanction Plan1-12-min.pdf27 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf27 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FINAL Engr Certificate (1)-ilovepdf-compressed-ilovepdf-compressed.pdf27 Jul 2017
Proforma of Allotment letterFile: FINAL ALLOTMENT-ATRIUM-SKYWARD.pdf27 Jul 2017
Proforma of Allotment letterFile: FINAL AGREEMENT SKYWORD.pdf27 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Atrium Skyward on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hole Vasti13,700+ in Pune

2 kmAtrium SkywardCompleted 93Lapsed / revoked 37Other 86Dot size: filed unitsN

Filed coordinates, straight-line distance. 216 registered projects within 2 km.

Builder: ATRIUM HOMES LLP

ATRIUM HOMES LLP has 3 registrations on MahaRERA, including Atrium Skyward and ATRIUM SKYWARD WING A. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Atrium Skyward is delayed beyond 30 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Atrium Skyward?

The registered promoter entity is ATRIUM HOMES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Atrium Skyward?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Atrium Skyward?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Atrium Skyward?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Atrium Skyward?

The professionals named in the filing: Architect: Cubix Architects Associates; Engineer: Sunil Mutalik and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Atrium Skyward?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Atrium Skyward. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Atrium Skyward to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.