ATHARVA

By MAYA DEVELOPERS

RG-MH-25037 · RERA P51800005146 · Last updated on MahaRERA portal: 9 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 78 months
  • 4 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 78 months from the original
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 85%
26 of 46Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 131 documents Report an error

ATHARVA is a Others project by MAYA DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800005146 on 9 Aug 2017. Possession is promised by 31 Mar 2027. The completion date has moved by 78 months from the original filing. 20 of the 46 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameATHARVA
  • TypeOthers
  • Location
    • Shell Colony Road
    • Chembur
    • Kurla
    • Mumbai Suburban
    • 400071
  • Pincode400071
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800005146
  • ReraGenie IDRG-MH-25037

Builder

  • NameMAYA DEVELOPERS
  • Entity typePartnership
  • PartnersBHARTCHANDRA JERAM THAKKER, Bharatchandra Jeram Thakker
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredAug 2017First promiseSep 2020Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Aug 2017
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 30 Sep 2020)
  • Buildings1 building record
  • Documents filed131 files

Current status

43%20 of 46 units booked
37.6%Work done, per cost certificate

Figures as on 9 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ATHARVANA131140646

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 85%.

ATHARVA: 85% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities15

As on 9 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNo70%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYesNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes30%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed19

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots19
Closed/Covered7
Open Space12

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area913 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 Jan 2026

Approvals and building plan

Sanctioning authorityMunicipal Corporation of Greater Mumbai
Permissible FSI3080.93
Proposed, not sanctioned2,282 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch400054
Estimated costRs 20.50 cr
Cost incurredRs 7.72 cr
Work done37.64%
BuildingWingEstimatedIncurred
ATHARVANARs 20.50 crRs 7.72 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDebashish Hore
ArchitectRaj Vinay Kansara
EngineerSanjay A. Thawani
Chartered AccountantRakshit Gowda & Associates
Chartered AccountantRSPH and Associates
Chartered AccountantPratik D Jain
PartnerRole in project
MAYA DEVELOPERS-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800023037Sep 2020 → Dec 2025

Reason as filed by the promoterWe are in the process of obtaining a revised commencement certificate in accordance with the provisions of the RERA act and Rules & project is yet to complete.

EXT51800011677Sep 2020 → Dec 2023

Reason as filed by the promoterDue to COVID-19 pandemic, the regular flow of work is hampered on account of unavailability of labor on regular basis

EXT51800006350Sep 2020 → Sep 2021

Reason as filed by the promoterChange in policy by MHADA and COVID-19 Pandemic, We need an extension upto 31st December 2021

EA29012619630Sep 2020 → Mar 2027

Reason as filed by the promoter1) As the entire country including Mumbai Suburban were under a total lock-down; and the Government of India as well as the Government of Maharashtra had announced a slew of measures including “work from home” and “social distancing” to curb the spread of the COVID-19. 2) Inspite of best efforts, the said project was adversely affected due to unprecedented COVID-19 Pandemic which lasted for more than 2 years and are still facing aftermath of COVID Pandemic. 3) Initially, the project was sanctioned for Ground + Stilt + 7 Floors. Subsequently, the competent authority approved an amended plan for

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Mar 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed131

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 131 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate-June -24 Final.pdf9 Jun 2026
Withdrawal Update Form 1File: Form 1 - Architect Certificate (1).pdf9 Jun 2026
Withdrawal Update Form 2File: Form 2 - Engineers Certificate_AddPage.pdf9 Jun 2026
Withdrawal Update Form 2File: Form 2 - Engineers Certificate_AddPage.pdf9 Jun 2026
Withdrawal Update Form 3File: Form 3_CA Certificate March 26-Final.pdf9 Jun 2026
Withdrawal Update Form 3File: Form 3_CA Certificate March 26-Final.pdf9 Jun 2026
Building plan approvalFile: Plan-Highlighted.pdf24 Mar 2026
Form 1File: AR.pdf24 Feb 2026
Form 2File: ER.pdf24 Feb 2026
Form 3File: CA.pdf24 Feb 2026
Disclosure of Sold and Booked InventoryFile: Dislosure.pdf24 Feb 2026
Form 1File: AR.pdf24 Feb 2026
Form 2File: ER.pdf24 Feb 2026
Form 3File: CA.pdf24 Feb 2026
Disclosure of Sold and Booked InventoryFile: Dislosure.pdf24 Feb 2026
Form 1File: AR.pdf24 Feb 2026
Form 2File: ER.pdf24 Feb 2026
Form 3File: CA.pdf24 Feb 2026
Disclosure of Sold and Booked InventoryFile: Dislosure.pdf24 Feb 2026
Form 1File: AR.pdf24 Feb 2026
Form 2File: ER.pdf24 Feb 2026
Form 3File: CA.pdf24 Feb 2026
Disclosure of Sold and Booked InventoryFile: Dislosure.pdf24 Feb 2026
Form 1File: AR.pdf24 Feb 2026
Form 2File: ER.pdf24 Feb 2026
Form 3File: CA.pdf24 Feb 2026
Disclosure of Sold and Booked InventoryFile: Dislosure.pdf24 Feb 2026
Form 1File: AR.pdf24 Feb 2026
Form 2File: ER.pdf24 Feb 2026
Form 3File: CA.pdf24 Feb 2026
Disclosure of Sold and Booked InventoryFile: Dislosure.pdf24 Feb 2026
Form 1File: AR.pdf24 Feb 2026
Form 2File: ER.pdf24 Feb 2026
Form 3File: CA.pdf24 Feb 2026
Disclosure of Sold and Booked InventoryFile: Dis.pdf24 Feb 2026
Form 2A (FY 2017-2018)File: March 18.pdf5 Feb 2026
Form 2A (FY 2018-2019)File: March 19.pdf5 Feb 2026
Form 2A (FY 2019-2020)File: March 20.pdf5 Feb 2026
Form 2A (FY 2020-2021)File: March 21.pdf5 Feb 2026
Form 2A (FY 2021-2022)File: March 22.pdf5 Feb 2026
Form 2A (FY 2022-2023)File: March 23.pdf5 Feb 2026
Form 2A (FY 2023-2024)File: March 24.pdf5 Feb 2026
Form 2A (FY 2024-2025)File: March 25.pdf5 Feb 2026
Form 1File: AR - June 25 .pdf29 Jan 2026
Form 2File: Engineers Certificate Jun-2025.pdf29 Jan 2026
Form 3File: CA June 25 final.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure - Atharva June 2025.pdf29 Jan 2026
Form 1File: AR - sept 25 .pdf29 Jan 2026
Form 2File: Engineers Certificate - 2_Sept-2025.pdf29 Jan 2026
Form 3File: CA Sep 25 final.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure - Atharva Sept 2025.pdf29 Jan 2026
Form 1File: AR - Dec 25 .pdf29 Jan 2026
Form 2File: Engineers Certificate -3_Dec-2025.pdf29 Jan 2026
Form 3File: CA Dec 25 final.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory - Atharva Dec 2025.pdf29 Jan 2026
Form 5 (FY 2018-2019)File: RERA Audit 18-19 signed.pdf29 Jan 2026
Form 5 (FY 2019-2020)File: RERA Audit 19-20 signed.pdf29 Jan 2026
Form 5 (FY 2020-2021)File: RERA Audit 20-21 signed.pdf29 Jan 2026
Form 5 (FY 2021-2022)File: RERA Audit Report 21-22 -SIGNED.pdf29 Jan 2026
Form 5 (FY 2024-2025)File: Audit Report_2024-25 final.pdf28 Jan 2026
Form 1File: AR - march 25.pdf23 Jan 2026
Form 2File: ER march 25.pdf23 Jan 2026
Form 3File: CA march 25 final.pdf23 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure - Atharva March 2025.pdf23 Jan 2026
Form 5 (FY 2023-2024)File: RERA audit signed report 23-24-Final.pdf22 Jan 2026
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate -Sept 24.pdf23 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate -Dec 24.pdf23 Apr 2025
Certificates of CA (Form 3)File: CA Certificate Sept 24 Signed.pdf23 Apr 2025
Certificates of CA (Form 3)File: CA Certificate Dec 24.pdf23 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate_Sept 24.pdf23 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate_Dec 24.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold or Booked Inventory_Sept 24.pdf16 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold or Booked Inventory_Dec 24.pdf16 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-June -24 Final.pdf14 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_June 24 Final.pdf14 Aug 2024
Certificates of CA (Form 3)File: CA Certificate June 24 Final.pdf14 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - Atharva (2).pdf6 Aug 2024
Declaration in FORM BFile: Form B Atharva.pdf9 Jul 2024
Certificates of CA (Form 3)File: 4 CA Certificate_March 24_revised.pdf4 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 03 Form 2A Atharva Mar 24.pdf25 Jun 2024

How this compares with Mumbai Suburban

43%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 78 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ATHARVA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chembur6,700+ in Mumbai Suburban

2 kmATHARVACompleted 170Lapsed / revoked 146Other 183Dot size: filed unitsN

Filed coordinates, straight-line distance. 499 registered projects within 2 km.

Builder: MAYA DEVELOPERS

MAYA DEVELOPERS has 2 registrations on MahaRERA, including ATHARVA and MAYA HARMONY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if ATHARVA is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ATHARVA?

The registered promoter entity is MAYA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ATHARVA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ATHARVA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ATHARVA?

The professionals named in the filing: Architect: Debashish Hore; Architect: Raj Vinay Kansara; Engineer: Sanjay A. Thawani; Chartered Accountant: Rakshit Gowda & Associates; Chartered Accountant: RSPH and Associates; Chartered Accountant: Pratik D Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ATHARVA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ATHARVA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ATHARVA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.