Aspire

By M/s Radheshyam Developers

RG-MH-24173 · RERA P51800012142 · Last updated on MahaRERA portal: 21 May 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 34 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedmoved 34 months from the original
5 of 11Construction stages donefurthest along: Staircases, 90%
45 of 107Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 129 documents Report an error

Aspire is a Residential / Group Housing project by M/s Radheshyam Developers in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800012142 on 1 Sep 2017. Possession is promised by 31 Oct 2026. The completion date has moved by 34 months from the original filing. 62 of the 107 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameAspire
  • TypeResidential / Group Housing
  • Location
    • Hanuman Nagar
    • Kandivali
    • Borivali
    • Mumbai Suburban
    • 400101
  • Pincode400101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800012142
  • ReraGenie IDRG-MH-24173

Builder

  • NameM/s Radheshyam Developers
  • Entity typePartnership
  • PartnersGirish Shamji Chheda, Rohit Premji Chheda, Zaverchand Liladhar Shah, Samir Narendra Jani
  • Declared earlier projects1 →

Key dates

this monthRegisteredSep 2017First promiseDec 2023Revised toOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Sep 2017
  • Promised completion31 Oct 2026
  • Revised completionRevised to 31 Oct 2026 (originally 30 Dec 2023)
  • Buildings1 building record
  • Documents filed129 files

Current status

58%62 of 107 units booked
46.8%Work done, per cost certificate

Figures as on 21 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Shivam AspireNA24231070107

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 90%.

Shivam Aspire: 68% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed26

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots26
Closed/Covered26

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,443 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority.
Permissible FSI4864.43
Proposed, not sanctioned4,485 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRaj Niketan, Bhandarkar Road,Matunga, Mumbai 400 019
Estimated costRs 75.00 cr
Cost incurredRs 35.07 cr
Work done46.76%
BuildingWingEstimatedIncurred
Shivam AspireNARs 73.50 crRs 35.07 cr
-NARs 1.50 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/s Shantanoo Rane and Associates
ArchitectInnovations
EngineerM/s J+W Consultants LLP
EngineerS K Consultants & Engineers
Chartered AccountantAMIT JAYESH SHAH
Chartered AccountantHAY & Associates LLP
PartnerRole in project
M/s Radheshyam Developers-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800012403Dec 2023 → Dec 2025

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 67% allottees for purpose of extension of RERA registration period of the said project.

EA31122519168Dec 2023 → Oct 2026

Reason as filed by the promoterWe apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to unforeseen circumstances, including procurement issues, financial constraints, and site challenges. Despite these setbacks, we are working diligently to address these issues and complete the remaining work. Hence, we seek extension till 31/10/2026.

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000197008Deepak JhaverIRadheshyam Developers20/05/2021
CC006000000480059Anil Rajendra YadavAspire Shivam20/04/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Oct 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2026

Documents filed129

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 129 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 (2).pdf21 May 2026
Withdrawal Update Form 2File: Form 2 - Aspire March 2026.pdf21 May 2026
Withdrawal Update Form 3File: CA Certificate - Radheshyam Developers - Q4 FY 26.pdf21 May 2026
Withdrawal Update Form 1File: Form 1 Aspire December.pdf26 Mar 2026
Withdrawal Update Form 2File: Form 2 Aspire December.pdf26 Mar 2026
Withdrawal Update Form 3File: Form 3 Aspire December.pdf26 Mar 2026
Withdrawal Update Form 1File: Form 1 - Shivam Aspire as on June 2025.pdf18 Nov 2025
Withdrawal Update Form 1File: Form 1 - Shivam Aspire as on June 2025.pdf18 Nov 2025
Withdrawal Update Form 1File: Form 1 - Shivam Aspire as on June 2025.pdf18 Nov 2025
Withdrawal Update Form 2File: Form 2 - Shivam Aspire as on June 2025.pdf18 Nov 2025
Withdrawal Update Form 2File: Form 2 - Shivam Aspire as on June 2025.pdf18 Nov 2025
Withdrawal Update Form 2File: Form 2 - Shivam Aspire as on June 2025.pdf18 Nov 2025
Withdrawal Update Form 3File: Form 3 - Shivam Aspire as on June 2025.pdf18 Nov 2025
Withdrawal Update Form 3File: Form 3 - Shivam Aspire as on June 2025.pdf18 Nov 2025
Withdrawal Update Form 3File: Form 3 - Shivam Aspire as on June 2025.pdf18 Nov 2025
Form 1File: Form 1 - Shivam Aspire as March 2025.pdf5 Sep 2025
Form 2File: Form 2 - Shivam Aspire as March 2025 (1).pdf5 Sep 2025
Form 3File: Form 3 - Shivam Aspire as March 2025.pdf5 Sep 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Aspire.pdf5 Sep 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Certificate-sale wing Dec 2024.pdf21 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 19 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf21 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Form 2 - Shivam Aspire as on Dec 2024.pdf13 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Form 2 - Shivam Aspire as March 2025.pdf13 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Certificate-sale wing March - 2025.pdf9 May 2025
Certificates of CA (Form 3)File: CA Certificate - Radheshyam Developers - Q3 FY 25.pdf9 May 2025
Certificates of CA (Form 3)File: CA Certificate - Radheshyam Developers - Q4 FY 25.pdf9 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Certificate-sale wing Sept 2024.pdf1 Dec 2024
Certificates of CA (Form 3)File: CA Certificate - Radheshyam Developers - Q2 FY 25 - Sep.pdf1 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Shivam Aspire as on Sep 2024.pdf1 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: Com CC RD 05-06-2023.pdf30 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Shivam Aspire as on June 2024 (1).pdf6 Aug 2024
Certificates of CA (Form 3)File: CA Certificate - Aspire - June 2024.pdf6 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Certificate-sale wing June 2024.pdf29 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 2019-20.pdf29 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 2020-21.pdf29 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2021-22.pdf29 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 2A 2022-23.pdf29 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Certificate-sale wing March 2024.pdf26 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Shivam Aspire as on March 2024 - Engineers Certificate.pdf4 May 2024
Certificates of CA (Form 3)File: CA CERTIFICATE ASPIRE - 31st March 2024.pdf2 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Dec 2023.pdf4 Apr 2024
Certificates of CA (Form 3)File: CA Certificate - Radheshyam Developers - Q3 FY 24.pdf29 Mar 2024
Proforma of Agreement for saleFile: Draft of AFS - Aspire.pdf29 Mar 2024
Proforma of Agreement for saleFile: Aspire - Modal AFS.pdf29 Mar 2024
Deviation Report with respect to model copy of AgreementFile: Aspire - Modal AFS.pdf28 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Certificate-sale wing July 2023.pdf26 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Certificate-sale wing Sept 2023.pdf26 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Certificate-sale wing December 2023.pdf26 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Shivam Aspire as on Sep 2023.pdf28 Nov 2023
Certificates of CA (Form 3)File: Form 3 - CA Certificate - 30 Sept 2023.pdf28 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Aspire as on March 2023.pdf13 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Aspire as on June 2023.pdf13 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2022-23.pdf13 Sep 2023
Certificates of CA (Form 3)File: CA Certificate - March 2023.pdf28 Aug 2023
Certificates of CA (Form 3)File: CA Certificate - June 2023.pdf28 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: Aspire CC.pdf9 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - March 2023.pdf29 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - March 2018.pdf20 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - March 2019.pdf20 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - March 2020.pdf20 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - March 2021.pdf20 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Dec 2021.pdf20 Apr 2023
Certificates of CA (Form 3)File: RERA CA Certificate - Radheshyam Developers - As on 31st Dec, 2021.pdf15 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Aspire - April 2018.pdf14 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - April 2019.pdf14 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Aspire - April 2020.pdf14 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Aspire - April 2021.pdf14 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Aspire - Jan 2021.pdf14 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - July 2021.pdf14 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Aspire - Oct 2021.pdf14 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Aspire - Jan 2022.pdf14 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Aspire - June 2022.pdf14 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Aspire - July 2022.pdf14 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Aspire - Sep 2022.pdf14 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Aspire - Jan 2023.pdf14 Apr 2023
Certificates of CA (Form 3)File: CA Certifiacte - March 2022.pdf14 Apr 2023
Certificates of CA (Form 3)File: CA Certificate - June 2022.pdf14 Apr 2023
Certificates of CA (Form 3)File: CA Certificate - Sep 2022.pdf14 Apr 2023
Certificates of CA (Form 3)File: CA Certificate - Dec 2022.pdf14 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Mar 22.pdf10 Apr 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Godrej TranquilP51800000812Kandivali East, Mumbai Suburban426Jul 2017CompletedJun 2023Jan 1970

How this compares with Mumbai Suburban

58%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 34 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Aspire on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kandivali6,700+ in Mumbai Suburban

2 kmAspireCompleted 136Lapsed / revoked 75Other 180Dot size: filed unitsN

Filed coordinates, straight-line distance. 391 registered projects within 2 km.

Builder: M/s Radheshyam Developers

M/s Radheshyam Developers has 1 registration on MahaRERA, including Aspire. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Aspire is delayed beyond 31 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Aspire?

The registered promoter entity is M/s Radheshyam Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Aspire?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Aspire?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Aspire?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Aspire?

The professionals named in the filing: Architect: M/s Shantanoo Rane and Associates; Architect: Innovations; Engineer: M/s J+W Consultants LLP; Engineer: S K Consultants & Engineers; Chartered Accountant: AMIT JAYESH SHAH; Chartered Accountant: HAY & Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Aspire?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Aspire. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Aspire to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.