Ashford Regal - Phase III - Wing F Project

By WMI Real Estate Developers LLP

RG-MH-68003 · RERA P51800048460 · Last updated on MahaRERA portal: 17 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken
  • Encumbrance declared on the project land, in favour of AXIS BANK LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 completed earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 24 months from the original
5 of 11Construction stages donefurthest along: Staircases, 80%
20 of 55Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 103 documents Report an error

Ashford Regal - Phase III - Wing F Project is a Others project by WMI Real Estate Developers LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800048460 on 3 Jan 2023. Possession is promised by 31 Dec 2027. The completion date has moved by 24 months from the original filing. 35 of the 55 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameAshford Regal - Phase III - Wing F Project
  • TypeOthers
  • Location
    • Ceat Tyre Road
    • Bhandup west
    • Kurla
    • Mumbai Suburban
    • 400078
  • Pincode400078
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800048460
  • ReraGenie IDRG-MH-68003

Builder

  • NameWMI Real Estate Developers LLP
  • Entity typeOthers
  • GSTIN27AACFW2534P1ZQ
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Named personsAurum Commercial LLP, Ashford Residency LLP
  • Other registrations4 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredJan 2023First promiseDec 2025Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Jan 2023
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed103 files

Current status

64%35 of 55 units booked
52.3%Work done, per cost certificate

Figures as on 17 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing FNA413905555

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 80%.

Wing F: 71% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.56%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities15

As on 17 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes30%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed279

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots279
Closed/Covered279

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area661 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofAXIS BANK LIMITED
CERSAI search filedYes
Declared on14 Jan 2026
LandownerVillageDistrict
Ground Holding Buildcon Private LimitedKurlaMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI3000.0
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch12, Mittal Tower, A-Wing, Nariman Point Mumbai 400021
Estimated costRs 16.26 cr
Cost incurredRs 8.50 cr
Work done52.29%
BuildingWingEstimatedIncurred
Wing FNARs 14.63 crRs 7.65 cr
-NARs 1.63 crRs 85.02 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architectparin shah
EngineerJACOB D'SOUZA
EngineerNilesh Samant
Engineerviivek jirapure
Engineervivek jirapure
Chartered AccountantGBCA & ASSOCIATES LLP
Chartered AccountantNEHALI & CO
PartnerRole in project
WMI Real Estate Developers LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800017805Dec 2025 → Dec 2027

Reason as filed by the promoterWe, WMI Real Estate Developers LLP, Promoters of the Project Ashford Regal - Phase III - Wing F Project’’ registered with MahaRERA vide project registration number P51800048460 (hereinafter referred to as the said project), hereby state that due to certain mitigating circumstances, we need to extend the project timeline by two years. Also, as per provisions of section 7(3) of the Real Estate (Regulation and Development) Act 2016 and the rules and regulations made thereunder, we have not annexed the consent obtained from allottees of the said project as per MahaRERA Circular no: 28 dated March

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jul 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Jul 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed103

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Engineer Form 2 Wing F Jun 26.pdf17 Jul 2026
Withdrawal Update Form 2File: Engineer Form 2 Wing F Jun 26.pdf17 Jul 2026
Withdrawal Update Form 3File: Signed CA Certificate Wing F June 26.pdf17 Jul 2026
Withdrawal Update Form 1File: Form 1 architects certificate WIng-F march 2026.pdf4 May 2026
Withdrawal Update Form 2File: Engineer Form 2 Wing F-Mar 26 (1).pdf4 May 2026
Withdrawal Update Form 3File: Signed CA Certificate-Wing F Mar 26.pdf4 May 2026
Withdrawal Update Form 1File: Form 1 architects certificate WIng-F (2).pdf31 Mar 2026
Withdrawal Update Form 2File: Engineer Form 2 Wing F Dec 25.pdf31 Mar 2026
Withdrawal Update Form 3File: Signed CA Certificate Wing F dec25.pdf31 Mar 2026
Withdrawal Update Form 1File: Form 1 architects certificate WIng-F.pdf30 Mar 2026
Withdrawal Update Form 2File: Engineer Form 2 Wing F-Sept 25..pdf30 Mar 2026
Withdrawal Update Form 3File: Signed CA Certificate-Wing F sept25.pdf30 Mar 2026
Withdrawal Update Form 1File: Form 1 architects certificate Ashford Regal Phase III Wing F.pdf19 Feb 2026
Withdrawal Update Form 2File: 2 Ashford Regal Phase lll Wing F form 2.pdf19 Feb 2026
Withdrawal Update Form 3File: Resigned CA Certificate Wing F June 25.pdf19 Feb 2026
Layout approvalFile: Drawing1-13_1-6.pdf21 Jul 2025
Layout approvalFile: Drawing1-13_7-end.pdf21 Jul 2025
Layout approvalFile: Drawing14-26_1-6.pdf21 Jul 2025
Layout approvalFile: Drawing14-26_7-end.pdf21 Jul 2025
Building plan approvalFile: AMENDED IOD LETTER.pdf21 Jul 2025
Copy of Layout Approval (in case of layout)File: Drawing1-13_1-6.pdf21 Jul 2025
Copy of Layout Approval (in case of layout)File: Drawing1-13_7-end.pdf21 Jul 2025
Copy of Layout Approval (in case of layout)File: Drawing14-26_1-6.pdf21 Jul 2025
Copy of Layout Approval (in case of layout)File: Drawing14-26_7-end.pdf21 Jul 2025
Commencement Certificates / NA Order for plotted developmentFile: (2025-05-09) FURTHER CC.pdf21 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: AMENDED IOD LETTER.pdf21 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 architects certificate Ashford Regal - Phase III Wing - ‘F’.pdf18 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate-Wing F June'25.pdf18 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf18 Jul 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory -F June -25.pdf18 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 new wing F (1).pdf16 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Wing-F _Mar25.pdf13 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 architects certificate WIng-F.pdf8 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 architects certificate WIng-F.pdf3 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised Signed 25-02-2025_CA Certificate-Wing F dec 24.pdf27 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 architects certificate WIng-F (1).pdf18 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ASHFORD REGAL- Phase Ill Wing F-Form 2 (1).pdf18 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ASHFORD REGAL- Phase Ill Wing F-Form 2 (1).pdf16 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf26 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Ashford Regal Phase III FORM 5.pdf8 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Ashford Regal Phase III FORM 5.pdf8 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: ilovepdf_merged (4).pdf8 Aug 2024
Details of encumbrances concerned to FinanceFile: Details of Encumbrances concerned to Finance.pdf7 Aug 2024
Details of encumbrances concerned to LegalFile: Details of Encumbrances concerned to Finance.pdf7 Aug 2024
CERSAI detailsFile: Wing F.pdf7 Aug 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf7 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Wing F.pdf31 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate Wmi F wing 30th june24.pdf30 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F-JUNE 2024.pdf10 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Architect Certificate Wing F Mar-24.pdf25 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate Wing F Mar-24.pdf25 Apr 2024
Disclosure of sold/ booked inventoryFile: 20240331 Sold Unsold Inventory - Tower F.pdf22 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 20240419 Signed CA Certificate-Wing F.pdf22 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dec-23 -Tower F - Architect Certificate.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Dec-23 -Tower F - Engineers Certificate.pdf19 Jan 2024
Disclosure of sold/ booked inventoryFile: Tower F.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed_CA Certificate-Wing F.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate-Wing F sep'23.pdf23 Nov 2023
Disclosure of sold/ booked inventoryFile: Sold unsold Inventory F wing.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold unsold Inventory F wing.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 20230930 Engineer Certificate - Ashford Regal - Wing F.pdf12 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Wing F1.pdf12 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 20230930 Architect's certificate - Wing F.pdf5 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 - F WING_compressed.pdf28 Sep 2023
Disclosure of sold/ booked inventoryFile: TOWER-F-MAR-23 (1).pdf22 Aug 2023
Disclosure of sold/ booked inventoryFile: TOWER-F-JUNE-23 (1).pdf22 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate-Wing F March 23.pdf21 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate-Wing F June 23.pdf21 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 20230630 Architect's certificate - F wing.pdf28 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 20230630 Engineer's certificate - Wing F.pdf28 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 20230331 Architect's certificate - Wing F (1).pdf14 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 20230331 Ashford Regal Tower F - Engineer Certificate (1).pdf14 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: 20230612 WMI CC.pdf12 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 20230331 Ashford Regal Tower F - Engineer Certificate.pdf5 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 20230331 Architect's certificate - Wing F.pdf24 Apr 2023
CERSAI detailsFile: ilovepdf_merged (10).pdf21 Dec 2022
CERSAI detailsFile: final cersai.pdf21 Dec 2022
Other - LegalFile: Declaration pertaining to Legal.pdf13 Dec 2022
Layout approvalFile: 1 Copy of Layout Approval (in case of layout).pdf29 Nov 2022
Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development.pdf29 Nov 2022

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise2 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Ashford Regal - Phase I - Wing A ProjectP51800047421Bhandup west, Mumbai Suburban293Oct 2022OngoingJun 2027Not due yet
Ashford Regal - Phase I - Wing A ProjectP51800047421Bhandup west, Mumbai Suburban293Oct 2022OngoingJun 2027Not due yet
Ashford Royale Tower DAshford Infotech Private Limited Project Ashford Royale S Samuel Street Goregaon Mulund Road Nahur Village Bhandup Mumbai 40007896-CompletedDec 2019Oct 2018

How this compares with Mumbai Suburban

64%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ashford Regal - Phase III - Wing F Project on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhandup west6,700+ in Mumbai Suburban

2 kmAshford Regal - Phase IICompleted 53Lapsed / revoked 34Other 102Dot size: filed unitsN

Filed coordinates, straight-line distance. 189 registered projects within 2 km.

Builder: WMI Real Estate Developers LLP

WMI Real Estate Developers LLP has 5 registrations on MahaRERA, including Ashford Regal - Phase I - Wing A Project and Ashford Regal - Phase II - Wing B Project. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Ashford Regal - Phase III - Wing F Project is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ashford Regal - Phase III - Wing F Project?

The registered promoter entity is WMI Real Estate Developers LLP, an others as per the filing. Its GSTIN 27AACFW2534P1ZQ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ashford Regal - Phase III - Wing F Project?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Ashford Regal - Phase III - Wing F Project?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ashford Regal - Phase III - Wing F Project?

The professionals named in the filing: Architect: parin shah; Engineer: JACOB D'SOUZA; Engineer: Nilesh Samant; Engineer: viivek jirapure; Engineer: vivek jirapure; Chartered Accountant: GBCA & ASSOCIATES LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ashford Regal - Phase III - Wing F Project?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ashford Regal - Phase III - Wing F Project. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ashford Regal - Phase III - Wing F Project to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.