Registered No litigation declared Others project

ARV REGALIA

By UNITREE INDIA REALTY LLP

RG-MH-14537 · RERA P52100023200 · Last updated on MahaRERA portal: 9 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
70 of 77Construction stages doneacross 7 buildings; furthest along: Podiums (if any), 0%
82 of 294Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 157 documents Report an error

ARV REGALIA is a Others project by UNITREE INDIA REALTY LLP in Pune, Maharashtra, registered with MahaRERA as P52100023200 on 6 Dec 2019. Possession is promised by 30 Dec 2026. 212 of the 294 units on this registration are recorded sold or booked, and 70 of 77 construction stages are filed complete.

At a glance

Project

  • NameARV REGALIA
  • TypeOthers
  • Location
    • UNDRI PISOLI SHIV ROAD
    • PUNYADHAM ASHRAM
    • Pisoli
    • Haveli
    • Pune
    • 411060
  • Pincode411060
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100023200
  • ReraGenie IDRG-MH-14537

Builder

  • NameUNITREE INDIA REALTY LLP
  • Entity typePartnership
  • PartnerRAHUL PREMPRAKASH GOYAL

Key dates

this monthRegisteredDec 2019PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Dec 2019
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings7 building records
  • Documents filed157 files

Current status

72%212 of 294 units booked
100.0%Work done, per cost certificate

Figures as on 9 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA9738038
Building BNA121039039
Building CNA121039039
Building DNA121039039
Building ENA121039039
Building FNA131060060
Commercial BuildingNA3104040

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 9 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

70 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Podiums (if any), at 0%.

Building A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building D91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building E91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building F91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Commercial Building91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 9 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed7

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots7
Closed/Covered7
BuildingClosed/CoveredTotal
Building B11
Building C11
Building D11
Building E11
Building F33

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area11,650 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Dec 2025

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Developement Authority, Pune
Permissible FSI20145.0
Proposed, not sanctioned13,591 sq m
Buildings approved8
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchWANAWADI
Estimated costRs 59.21 cr
Cost incurredRs 59.21 cr
Work done100.0%
BuildingWingEstimatedIncurred
-NARs 14.30 crRs 14.30 cr
Building FNARs 10.72 crRs 10.72 cr
Building BNARs 7.35 crRs 7.35 cr
Building ENARs 7.28 crRs 7.28 cr
Building CNARs 6.21 crRs 6.21 cr
Building DNARs 6.21 crRs 6.21 cr
Building ANARs 4.37 crRs 4.37 cr
Commercial BuildingNARs 2.78 crRs 2.78 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCUBIX Architects Associates
EngineerGanesh Mehta
Chartered AccountantShah Khandelwal Jain & Associates
Chartered AccountantSAC & CO LLP
PartnerRole in project
UNITREE INDIA REALTY LLP-

Litigation declared2

CaseCourtStatus
1723/2021CJSD PuneISSUES FRAMING
1723/2021/2021CJSD PuneIssues

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed157

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 157 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Unitree India Realty LLP- Form 1 Q4.pdf9 Jun 2026
Withdrawal Update Form 2File: Unitree India Realty LLP- Form 2 Q4.pdf9 Jun 2026
Withdrawal Update Form 3File: ARV Unitree Form 3 Q4.pdf9 Jun 2026
Withdrawal Update Form 1File: Form 1 Q3.pdf29 Jan 2026
Withdrawal Update Form 2File: Form 2 Q3.pdf29 Jan 2026
Withdrawal Update Form 3File: Form 3 Q3.pdf29 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 ARV Regalia.pdf21 Nov 2025
Form 1File: Form 1.pdf19 Oct 2025
Form 2File: Form 2.pdf19 Oct 2025
Form 3File: Form 3.pdf19 Oct 2025
Disclosure of Sold and Booked InventoryFile: Promoters Disclosure.pdf19 Oct 2025
Form 1File: Form 1 Regalia_compressed.pdf22 Jul 2025
Form 2File: Form 2 Regalia.pdf22 Jul 2025
Form 3File: Form 3 Regalia.pdf22 Jul 2025
Disclosure of Sold and Booked InventoryFile: Promoters Disclosure_compressed.pdf22 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: Promoters Disclosure.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate-Regalia.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Regalia_compressed.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate-Regalia.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Promoters Disclosure.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf26 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_compressed.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: REGALIA Disclosure.pdf19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Unitree India Realty LLP - ARV Regalia.pdf11 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Unitree India Realty Llp Engineer's Certificate_compressed.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 ARV Regalia.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARV Regalia.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ARV Regalia-Engineering Certificate_compressed.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ARV Regalia.pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: Promoters Disclosure.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Unitree Form 3_compressed.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 ARV Regalia.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARV Regalia-Architect Certificate_compressed.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure_compressed.pdf20 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Unitree.pdf16 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Unitree.pdf28 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A REGALIA_compressed.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 UNITREE ARCHITECT'S CERTIFICATE.pdf12 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 UNITREE ENGINEER'S CERTIFICATE.pdf12 Aug 2023
Disclosure of sold/ booked inventoryFile: Disclosure ARV REGALIA B.pdf12 Aug 2023
Disclosure of sold/ booked inventoryFile: Disclosure ARV REGALIA C.pdf12 Aug 2023
Disclosure of sold/ booked inventoryFile: Disclosure ARV REGALIA D.pdf12 Aug 2023
Disclosure of sold/ booked inventoryFile: Disclosure ARV REGALIA E.pdf12 Aug 2023
Disclosure of sold/ booked inventoryFile: Disclosure ARV REGALIA F.pdf12 Aug 2023
Disclosure of sold/ booked inventoryFile: Disclosure ARV REGALIA COMMERCIAL.pdf12 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 UIRL DSC_compressed_organized.pdf12 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE REGALIA_compressed_organized.pdf25 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: UIRLLP Engineers Certificate compressed.pdf25 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A REGALIA_compressed_organized.pdf25 Apr 2023
CERSAI detailsFile: CERSAI_Search_Report_Regalia.pdf25 Apr 2023
Disclosure of sold/ booked inventoryFile: Disclosures Regalia.pdf25 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Regalia_compressed.pdf25 Apr 2023
Declaration about Commencement CertificateFile: Commencement Declaration_Regalia.pdf27 Mar 2023
Layout approvalFile: 1_compressed (4).pdf24 Mar 2023
Building plan approvalFile: 2_compressed.pdf24 Mar 2023
Building plan approvalFile: 3_compressed.pdf24 Mar 2023
Building plan approvalFile: 4_compressed.pdf24 Mar 2023
Building plan approvalFile: 5_compressed.pdf24 Mar 2023
Building plan approvalFile: 6_compressed.pdf24 Mar 2023
Building plan approvalFile: 7_compressed.pdf24 Mar 2023
Building plan approvalFile: 9_compressed.pdf24 Mar 2023
Building plan approvalFile: 10_compressed.pdf24 Mar 2023
Building plan approvalFile: 11_compressed.pdf24 Mar 2023
Building plan approvalFile: 12_compressed.pdf24 Mar 2023
Building plan approvalFile: 13_compressed.pdf24 Mar 2023
Building plan approvalFile: 14_compressed.pdf24 Mar 2023
Building plan approvalFile: 15_compressed.pdf24 Mar 2023
Building plan approvalFile: 16_compressed.pdf24 Mar 2023
Building plan approvalFile: 17_compressed.pdf24 Mar 2023
Building plan approvalFile: 18_compressed.pdf24 Mar 2023
Building plan approvalFile: 19_compressed.pdf24 Mar 2023
Building plan approvalFile: 20_compressed.pdf24 Mar 2023

How this compares with Pune

72%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ARV REGALIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUNYADHAM ASHRAM13,700+ in Pune

2 kmARV REGALIACompleted 83Lapsed / revoked 37Other 94Dot size: filed unitsN

Filed coordinates, straight-line distance. 214 registered projects within 2 km.

Builder: UNITREE INDIA REALTY LLP

UNITREE INDIA REALTY LLP has 1 registration on MahaRERA, including ARV REGALIA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ARV REGALIA is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ARV REGALIA?

The registered promoter entity is UNITREE INDIA REALTY LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ARV REGALIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ARV REGALIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ARV REGALIA?

The professionals named in the filing: Architect: CUBIX Architects Associates; Engineer: Ganesh Mehta; Chartered Accountant: Shah Khandelwal Jain & Associates; Chartered Accountant: SAC & CO LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ARV REGALIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ARV REGALIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ARV REGALIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.