Home / Browse projects / Mumbai Suburban, Maharashtra / Arkade Rare

Registered Litigation declared Residential / Group Housing project

Arkade Rare

By Arkade Developers Limited

RG-MH-18586 · RERA P51800077307 · Last updated on MahaRERA portal: 20 May 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
22 of 77Construction stages doneacross 7 buildings; furthest along: Slabs of Super Structure, 94%
189 of 479Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 161 documents Report an error

Arkade Rare is a Residential / Group Housing project by Arkade Developers Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800077307 on 6 Aug 2024. Possession is promised by 31 Dec 2028. 290 of the 479 units on this registration are recorded sold or booked, and 22 of 77 construction stages are filed complete.

At a glance

Project

  • NameArkade Rare
  • TypeResidential / Group Housing
  • Location
    • 12.20 m Wide Exisiting Road
    • Off L B S Road
    • Bhandup (West)
    • Kanjurmarg
    • Kurla
    • Mumbai Suburban
    • 400078
  • Pincode400078
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800077307
  • ReraGenie IDRG-MH-18586

Builder

  • NameArkade Developers Limited
  • Entity typeCompany
  • CINU45200MH1986PLC039813
  • GSTIN27AAACA3578Q1Z4
  • Managing DirectorAmit Mangilal Jain
  • DirectorArpit Vikram Jain
  • Other registrations8 more →
  • Declared earlier projects19 →

Key dates

this monthRegisteredAug 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Aug 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings7 building records
  • Documents filed161 files

Current status

61%290 of 479 units booked
40.5%Work done, per cost certificate

Figures as on 20 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing BNA1212622183
Wing CNA1212772299
Wing DNA121230030
Wing ENA262677077
Wing FNA262662062
Wing GNA262662062
Wing ANA121262466

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 20 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Slabs of Super Structure, at 94%.

Wing B30%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure6%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises9%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks8%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.2%
Wing C28%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)80%
Plinth100%
Stilt Floor0%
Slabs of Super Structure6%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises9%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks8%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.2%
Wing D38%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure94%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises13%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks8%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.2%
Wing E38%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure88%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises18%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks8%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.2%
Wing F40%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises29%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks8%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.2%
Wing G40%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises34%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks8%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.2%
Wing A30%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure6%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises9%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks8%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.2%

Progress on shared amenities15

As on 20 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes25%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes15%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes65%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed583

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots583
Closed/Covered583
BuildingClosed/CoveredTotal
Wing B9898
Wing C9797
Wing D9797
Wing E9797
Wing F9797
Wing G9797

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area11,967 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on14 Aug 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI31891.92
Proposed, not sanctioned10,722 sq m
Buildings approved7
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTHAKUR HOUSE, AKRULI ROAD, ASHOK NAGAR, KANDIVLI-EAST MUMBAI MAHARASHTRA 400101
Estimated costRs 220.31 cr
Cost incurredRs 89.11 cr
Work done40.45%
BuildingWingEstimatedIncurred
Wing CNARs 39.51 crRs 12.83 cr
Wing ENARs 39.08 crRs 20.48 cr
-NARs 25.77 crRs 1.59 cr
Wing GNARs 24.35 crRs 14.65 cr
Wing ANARs 24.35 crRs 8.02 cr
Wing BNARs 23.03 crRs 7.66 cr
Wing FNARs 23.03 crRs 12.84 cr
Wing DNARs 21.18 crRs 11.04 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKalakruti Architects and Plannerss
ArchitectKalakruti Architects & Planners
EngineerHiren M Tanna
EngineerJignesh Mohan patel
Chartered AccountantAmit T Jain & Co.
Chartered AccountantMittal & Associates
PartnerRole in project
Arkade Developers Limited-

Litigation declared2

CaseCourtStatus
478/2024District Superintendent of Land Records BandraOngoing
4008 /2024Bombay High CourtOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Jul 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed161

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 161 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2a Arkadde Rare Mar 26.pdf20 May 2026
Withdrawal Update Form 1File: FORM-1-Rare Mar 26.pdf4 May 2026
Withdrawal Update Form 2File: Form 2 Arkade Rare March 2026.pdf4 May 2026
Withdrawal Update Form 3File: Form 3 Arkade Rare Mar 26_compressed.pdf4 May 2026
Withdrawal Update Form 1File: FORM 1 ARKADE RARE.pdf30 Jan 2026
Withdrawal Update Form 2File: FORM 2 ARKADE RARE.pdf30 Jan 2026
Withdrawal Update Form 3File: Form 3 Rare Dec 25 upload.pdf30 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 Arkade Rare 24-25.pdf17 Dec 2025
Withdrawal Update Form 1File: Form 1 Rare Sep 25.pdf30 Oct 2025
Withdrawal Update Form 1File: Form 1 Rare Sep 25.pdf30 Oct 2025
Withdrawal Update Form 1File: Form 1 Rare Sep 25.pdf30 Oct 2025
Withdrawal Update Form 1File: Form 1 Rare Sep 25.pdf30 Oct 2025
Withdrawal Update Form 2File: Form 2 Arkade Rare September 2025.pdf30 Oct 2025
Withdrawal Update Form 2File: Form 2 Arkade Rare September 2025.pdf30 Oct 2025
Withdrawal Update Form 2File: Form 2 Arkade Rare September 2025.pdf30 Oct 2025
Withdrawal Update Form 2File: Form 2 Arkade Rare September 2025.pdf30 Oct 2025
Withdrawal Update Form 3File: 11zon_rotated Rare_11zon.pdf30 Oct 2025
Withdrawal Update Form 3File: 11zon_rotated Rare_11zon.pdf30 Oct 2025
Withdrawal Update Form 3File: 11zon_rotated Rare_11zon.pdf30 Oct 2025
Withdrawal Update Form 3File: 11zon_rotated Rare_11zon.pdf30 Oct 2025
Withdrawal Update Form 1File: Form 1 Rare Sep 25.pdf29 Oct 2025
Withdrawal Update Form 1File: Form 1 Rare Sep 25.pdf29 Oct 2025
Withdrawal Update Form 1File: Form 1 Rare Sep 25.pdf29 Oct 2025
Withdrawal Update Form 2File: Form 2 Arkade Rare September 2025.pdf29 Oct 2025
Withdrawal Update Form 2File: Form 2 Arkade Rare September 2025.pdf29 Oct 2025
Withdrawal Update Form 2File: Form 2 Arkade Rare September 2025.pdf29 Oct 2025
Withdrawal Update Form 3File: 11zon_rotated Rare_11zon.pdf29 Oct 2025
Withdrawal Update Form 3File: 11zon_rotated Rare_11zon.pdf29 Oct 2025
Withdrawal Update Form 3File: 11zon_rotated Rare_11zon.pdf29 Oct 2025
Withdrawal Update Form 1File: Form 1 Rare June 2025.pdf7 Aug 2025
Withdrawal Update Form 2File: Form 2 Rare 1 Jun 25 - Old.pdf7 Aug 2025
Withdrawal Update Form 3File: Arkade Rare - Final.pdf7 Aug 2025
Building plan approvalFile: Drawing 1-1_compressed.pdf28 Apr 2025
Building plan approvalFile: Drawing 1-2.pdf28 Apr 2025
Building plan approvalFile: Drawing 1-3_11zon.pdf28 Apr 2025
Building plan approvalFile: Drawing 1-4_11zon.pdf28 Apr 2025
Building plan approvalFile: Drawing 1-5.pdf28 Apr 2025
Building plan approvalFile: Drawing 1-6.pdf28 Apr 2025
Building plan approvalFile: Drawing 1-7.pdf28 Apr 2025
Building plan approvalFile: Drawing 1-8.pdf28 Apr 2025
Building plan approvalFile: Drawing 1-9.pdf28 Apr 2025
Building plan approvalFile: Drawing (2)-pages-1_11zon.pdf28 Apr 2025
Building plan approvalFile: Drawing (2)-pages-3_11zon.pdf28 Apr 2025
Building plan approvalFile: Drawing (2)-pages-3_11zon.pdf28 Apr 2025
Building plan approvalFile: Drawing (2)-pages-4.pdf28 Apr 2025
Building plan approvalFile: 2454405Amendletter_signed.pdf28 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Drawing 1-1_compressed.pdf28 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Drawing 1-2.pdf28 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Drawing 1-3_11zon.pdf28 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Drawing 1-4_11zon.pdf28 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Drawing 1-5.pdf28 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Drawing 1-6.pdf28 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Drawing 1-7.pdf28 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Drawing 1-8.pdf28 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Drawing 1-9.pdf28 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Drawing (2)-pages-1_11zon.pdf28 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Drawing (2)-pages-3_11zon.pdf28 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Drawing (2)-pages-3_11zon.pdf28 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Drawing (2)-pages-4.pdf28 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 2454405Amendletter_signed.pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Arkade Rare Mar 25_compressed.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Arkade Rare Mar 25.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold and unsold Rare mar 25_compressed.pdf11 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form_2A_Rare Mar 25.pdf11 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Rare Mar 25.pdf5 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: 2466336_FurtherCC_signed_ Arkade Rare.pdf10 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Arkade Rare Dec 24.pdf12 Feb 2025
Disclosure of sold/ booked inventoryFile: Rare Inventory Declaration dec 24 R.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rare Dec 24_compressed.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Rare Dec 24.pdf14 Jan 2025
Disclosure of sold/ booked inventoryFile: Rare Inventory Declaration dec 24.pdf14 Jan 2025
Building plan approvalFile: Arkade Rare IOD.pdf11 Dec 2024
Building plan approvalFile: Drawing 1-8-2.pdf11 Dec 2024
Building plan approvalFile: Drawing 1-8-3.pdf11 Dec 2024
Building plan approvalFile: Drawing 1-8-4.pdf11 Dec 2024
Building plan approvalFile: Drawing 1-8-5.pdf11 Dec 2024
Building plan approvalFile: Drawing 1-8-6.pdf11 Dec 2024
Building plan approvalFile: Drawing 1-8-7.pdf11 Dec 2024
Building plan approvalFile: Drawing 1-8-8.pdf11 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: CC endorsement Project RARE.pdf11 Dec 2024

Promoter's earlier projects12

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

11 delivered on promise1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Arkade CrownEksar Junction of SVP Road Borivali West Mumbai 400 103236-CompletedDec 2025Jun 2024
ARKADE CROWNP51800045342Eksar, Mumbai Suburban-May 2022CompletedDec 2025Jun 2024
Arkade SereneP51800029961Sunder Nagar Malad West, Mumbai Suburban-Jul 2021CompletedJun 2024Feb 2023
ARKADE EARTH-CARNATIONP51800014422Kanjurmarg East, Mumbai Suburban-Nov 2017CompletedDec 2023Apr 2021
ARKADE EARTH-ASPENP51800006579Kanjurmarg East, Mumbai Suburban-Aug 2017CompletedDec 2023Apr 2021
ARKADE EARTH- BLUEBELLP51800011586Kanjurmarg East, Mumbai Suburban-Aug 2017CompletedDec 2023Apr 2021
ARKADE EARTH-DAFFODILP51800004440Kanjurmarg East, Mumbai Suburban-Aug 2017CompletedDec 2022Feb 2020
ARKADE EARTH - HAZELP51800022666KANJURMARG EAST, Mumbai Suburban-Oct 2019CompletedDec 2022Apr 2022
ARKADE EARTH - GARDENIAP51800010074Kanjurmarg East, Mumbai Suburban-Aug 2017CompletedDec 2022Feb 2020
ARKADE EARTH - FERNP51800004750Kanjurmarg East, Mumbai Suburban-Aug 2017CompletedDec 2022Feb 2020
ARKADE EARTH - EBONYP51800008953Kanjurmarg East, Mumbai Suburban-Aug 2017CompletedDec 2022Feb 2020
DarshanDarshan Vile Parle East Mumbai 5710-CompletedJun 2022Late, Nov 2022

How this compares with Mumbai Suburban

61%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Arkade Rare on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhandup (West)6,700+ in Mumbai Suburban

2 kmArkade RareCompleted 36Lapsed / revoked 38Other 67Dot size: filed unitsN

Filed coordinates, straight-line distance. 141 registered projects within 2 km.

Builder: Arkade Developers Limited

ARKADE DEVELOPERS LIMITED has 9 registrations on MahaRERA, including ARKADE PEARL 1 and Arkade Eden. Its filings disclose 19 earlier MahaRERA projects: declares 19 of 19 past projects completed on time. Litigation is declared on 7 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Arkade Rare is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Arkade Rare?

The registered promoter entity is Arkade Developers Limited, a company as per the filing. Its CIN U45200MH1986PLC039813 and GSTIN 27AAACA3578Q1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Arkade Rare?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Arkade Rare?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Arkade Rare?

The professionals named in the filing: Architect: Kalakruti Architects and Plannerss; Architect: Kalakruti Architects & Planners; Engineer: Hiren M Tanna; Engineer: Jignesh Mohan patel; Chartered Accountant: Amit T Jain & Co.; Chartered Accountant: Mittal & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Arkade Rare?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Arkade Rare. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Arkade Rare to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.