Arkade Nest
By Arkade Developers Pvt. Ltd.
RG-MH-05299 · RERA P51800050953 · Last updated on MahaRERA portal: 20 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 10 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Arkade Nest is a Residential / Group Housing project by Arkade Developers Pvt. Ltd. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800050953 on 15 May 2023. Possession is promised by 30 Jun 2027. 235 of the 351 units on this registration are recorded sold or booked, and 27 of 66 construction stages are filed complete.
At a glance
Project
- NameArkade Nest
- TypeResidential / Group Housing
- Location
- Asha Nagar Park Road
- Mulund West
- Nahur
- Kurla
- Mumbai Suburban
- 400080
- Pincode400080
- RERA no.P51800050953
- ReraGenie IDRG-MH-05299
Builder
- NameArkade Developers Pvt. Ltd.
- Entity typeCompany
- DirectorsAmit Jain, Arpit Jain, Sandeep Jain
- Declared earlier projects10 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on15 May 2023
- Promised completion30 Jun 2027
- Revised completionNone
- Buildings6 building records
- Documents filed143 files
Current status
Figures as on 20 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing A | NA | 9 | 0 | 51 | 0 | 51 |
| Wing B | NA | 9 | 0 | 51 | 0 | 51 |
| Wing C | NA | 9 | 0 | 68 | 0 | 68 |
| Wing D | NA | 9 | 0 | 66 | 0 | 66 |
| Wing E | NA | 18 | 18 | 66 | 0 | 66 |
| Wing F | NA | 18 | 18 | 49 | 0 | 49 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building6
As on 20 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
27 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Internal walls, at 47%.
Wing A52%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 43% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 16% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 8% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 2% |
Wing B52%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 43% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 16% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 8% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 2% |
Wing C43%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 47% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 16% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 8% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 2% |
Wing D39%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 17% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 16% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 2% |
Wing E39%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 11% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 16% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 2% |
Wing F51%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 36% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 16% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 8% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 2% |
Progress on shared amenities15
As on 20 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 25% |
| Storm Water Drains | Yes | 12% |
| Landscaping & Tree Planting | Yes | 20% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 50% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 60% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Wing C | NA | Rs 36.80 cr | Rs 23.99 cr |
| Wing A | NA | Rs 35.52 cr | Rs 22.84 cr |
| Wing B | NA | Rs 35.47 cr | Rs 22.89 cr |
| Wing E | NA | Rs 32.91 cr | Rs 12.86 cr |
| Wing D | NA | Rs 31.62 cr | Rs 13.02 cr |
| - | NA | Rs 30.84 cr | Rs 3.03 cr |
| Wing F | NA | Rs 29.86 cr | Rs 13.02 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Kalakruti Arhitect and planners |
| Architect | Kalakruti Architects & Planners |
| Engineer | Jignesh Mohan Patel |
| Chartered Accountant | Mittal & Associates |
| Chartered Accountant | Santosh B Morge & Co |
| Chartered Accountant | Amit T Jain & Co. |
| Partner | Role in project |
|---|---|
| Arkade Developers Pvt. Ltd. | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Mar 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Feb 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Apr 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2027
Documents filed143
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 143 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2A arkade nest mar 26.pdf | 20 May 2026 |
| Withdrawal Update Form 1File: Form 1-Arkade Nest Mar 26.pdf | 5 May 2026 |
| Withdrawal Update Form 2File: Form 2 Arkade Nest March 2026.pdf | 5 May 2026 |
| Withdrawal Update Form 3File: Form 3 Arkade Nest Mar 26 Final_compressed.pdf | 5 May 2026 |
| Withdrawal Update Form 1File: Form 1 Nest Dec 25.pdf | 30 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Nest Dec 25.pdf | 30 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Nest Dec 25_compressed.pdf | 30 Jan 2026 |
| Form 5 (FY 2024-2025)File: Form 5 Arkade Nest 24-25.pdf | 17 Dec 2025 |
| Withdrawal Update Form 1File: Form 1 Nest Sep 25.pdf | 29 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 Nest Sep 25.pdf | 29 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 Nest Sep 25.pdf | 29 Oct 2025 |
| Withdrawal Update Form 2File: Arkade Nest Sept 2025 (Form 2).pdf | 29 Oct 2025 |
| Withdrawal Update Form 2File: Arkade Nest Sept 2025 (Form 2).pdf | 29 Oct 2025 |
| Withdrawal Update Form 2File: Arkade Nest Sept 2025 (Form 2).pdf | 29 Oct 2025 |
| Withdrawal Update Form 3File: Arkade Nest Sept 25_11zon.pdf | 29 Oct 2025 |
| Withdrawal Update Form 3File: Arkade Nest Sept 25_11zon.pdf | 29 Oct 2025 |
| Withdrawal Update Form 3File: Arkade Nest Sept 25_11zon.pdf | 29 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 Arkade Nest.pdf | 7 Aug 2025 |
| Withdrawal Update Form 2File: Form 2 Nest 1 Jun 25 - Old.pdf | 7 Aug 2025 |
| Withdrawal Update Form 3File: arkade nest 1_11zon.pdf | 7 Aug 2025 |
| Building plan approvalFile: Drawing (2)_compressed-1-3_11zon.pdf | 29 Apr 2025 |
| Building plan approvalFile: Drawing (2)_compressed-4-6.pdf | 29 Apr 2025 |
| Building plan approvalFile: 2454406Amendletter_signed.pdf | 29 Apr 2025 |
| Form 2 Nest Mar 25 | 29 Apr 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Drawing (2)_compressed-7-9_11zon.pdf | 29 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Drawing (2)_compressed-1-3_11zon.pdf | 29 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Drawing (2)_compressed-4-6.pdf | 29 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 2454406Amendletter_signed.pdf | 29 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nest Form 3 Mar 25_compressed.pdf | 28 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold and unsold Nest Mar 25.pdf | 11 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form_2A_Nest Mar 25.pdf | 11 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Nest Mar 25.pdf | 5 Apr 2025 |
| Layout approvalFile: Drawing (2)_compressed-1-3_11zon.pdf | 13 Feb 2025 |
| Layout approvalFile: Drawing (2)_compressed-4-6.pdf | 13 Feb 2025 |
| Layout approvalFile: Drawing (2)_compressed-7-9_11zon.pdf | 13 Feb 2025 |
| Building plan approvalFile: 2454406Amendletter_signed.pdf | 13 Feb 2025 |
| Copy of Layout Approval (in case of layout)File: Drawing (2)_compressed-1-3_11zon.pdf | 13 Feb 2025 |
| Copy of Layout Approval (in case of layout)File: Drawing (2)_compressed-4-6.pdf | 13 Feb 2025 |
| Copy of Layout Approval (in case of layout)File: Drawing (2)_compressed-7-9_11zon.pdf | 13 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 2454406Amendletter_signed.pdf | 13 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Arkade Nest Dec 24.pdf | 12 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nest Dec 24_compressed.pdf | 29 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Nest Inventory declaration dec 24.pdf | 29 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Nest Dec 24.pdf | 14 Jan 2025 |
| Details of encumbrances concerned to FinanceFile: Arkade Nest-Financial encumbrance.pdf | 28 Nov 2024 |
| Details of encumbrances concerned to LegalFile: Arkade Nest-Financial encumbrance.pdf | 28 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Nest Sep 24.pdf | 7 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Nest Sep 24-Both sign_compressed.pdf | 23 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nest form 3 Sep24-s_compressed.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Nest Sep 24.pdf | 19 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Arkade Nest-Form 5-FY 24.pdf | 15 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Nest Sep 2024.pdf | 14 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Nest Jun 24.pdf | 26 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Nest june 2024_compressed.pdf | 26 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventories Nest-Jun 24 Final.pdf | 25 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Nest Jun 24.pdf | 13 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold UnSold March 24 Arkade Nest_compressed.pdf | 25 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Untitled_20240424_110728_NEST MAR 24_compressed.pdf | 24 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Arkade Nest Form 2 March 2024.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Nest Dec 23-R.pdf | 19 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Nest Dec 23-R.pdf | 17 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Arkade Nest - CA Certificate (Form 3).pdf | 16 Apr 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Affidavit Format A - Arkade Nest.pdf | 16 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Nest March 2024.pdf | 11 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Arkade Nest March 24.pdf | 10 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Arkade Nest CC Revalidation 15022414022025.pdf | 16 Mar 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 2410672_FurtherCC_signed.pdf | 9 Feb 2024 |
| Declaration about Commencement CertificateFile: Format D -1.pdf | 9 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Nest Dec 23-1.pdf | 6 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Arkade Nest Dec 23.pdf | 31 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Arkade Nest Dec 23.pdf | 31 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 23 Nest.pdf | 22 Jan 2024 |
| Layout approvalFile: Page 1.pdf | 1 Dec 2023 |
| Copy of Layout Approval (in case of layout)File: Page 1.pdf | 1 Dec 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Affidavit Format A - Arkade Nest.pdf | 1 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nest Revised Form 3_compressed.pdf | 9 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2 Engineers Certificate_Arkade Nest_Sept 23.pdf | 8 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Arkade Nest - Declaration of Sold Unsold Units - Sep 23.pdf | 2 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Arkade Nest - Form 3 Sep 23 - Signed_compressed.pdf | 2 Nov 2023 |
| Building plan approvalFile: Ammended Plan Approval letter - Nest.pdf | 9 Oct 2023 |
Promoter's earlier projects10
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Arkade SereneP51800029961 | Sunder Nagar Malad West, Mumbai Suburban | - | Jul 2021 | Completed | Jun 2024 | Feb 2023 |
| ARKADE EARTH-CARNATIONP51800014422 | Kanjurmarg East, Mumbai Suburban | - | Nov 2017 | Completed | Dec 2023 | Apr 2021 |
| ARKADE EARTH-ASPENP51800006579 | Kanjurmarg East, Mumbai Suburban | - | Aug 2017 | Completed | Dec 2023 | Apr 2021 |
| ARKADE EARTH- BLUEBELLP51800011586 | Kanjurmarg East, Mumbai Suburban | - | Aug 2017 | Completed | Dec 2023 | Apr 2021 |
| Darshan | Darshan Vile Parle East Mumbai 57 | 10 | - | Completed | Jun 2023 | Nov 2022 |
| ARKADE EARTH-DAFFODILP51800004440 | Kanjurmarg East, Mumbai Suburban | - | Aug 2017 | Completed | Dec 2022 | Feb 2020 |
| ARKADE EARTH - HAZELP51800022666 | KANJURMARG EAST, Mumbai Suburban | - | Oct 2019 | Completed | Dec 2022 | Apr 2022 |
| ARKADE EARTH - GARDENIAP51800010074 | Kanjurmarg East, Mumbai Suburban | - | Aug 2017 | Completed | Dec 2022 | Feb 2020 |
| ARKADE EARTH - FERNP51800004750 | Kanjurmarg East, Mumbai Suburban | - | Aug 2017 | Completed | Dec 2022 | Feb 2020 |
| ARKADE EARTH - EBONYP51800008953 | Kanjurmarg East, Mumbai Suburban | - | Aug 2017 | Completed | Dec 2022 | Feb 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 143 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Arkade Nest on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mulund West6,700+ in Mumbai Suburban
Eternia Towers A to D
Oberoi Constructions Limited
Bellanza Phase 1 - Wing A, B, C at The Prestig
PRESTIGE MULUND REALTY PRIVATE LIMITED
Atmosphere O2
Atmosphere Realty Pvt Ltd
Bellanza Phase 2 - Wing D, E, F at The Prestig
PRESTIGE MULUND REALTY PRIVATE LIMITED
Forest Hills Ph 1 at The Prestige City
PRESTIGE MULUND REALTY PRIVATE LIMITED
Kalpataru Elitus
Arimas Real Estate Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: Arkade Developers Pvt. Ltd.
Arkade Developers Pvt. Ltd. has 1 registration on MahaRERA, including Arkade Nest. Its filings disclose 10 earlier MahaRERA projects: declares 10 of 10 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Arkade Nest is delayed beyond 30 Jun 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Arkade Nest?
The registered promoter entity is Arkade Developers Pvt. Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Arkade Nest?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Arkade Nest?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Arkade Nest?
The professionals named in the filing: Architect: Kalakruti Arhitect and planners; Architect: Kalakruti Architects & Planners; Engineer: Jignesh Mohan Patel; Chartered Accountant: Mittal & Associates; Chartered Accountant: Santosh B Morge & Co; Chartered Accountant: Amit T Jain & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Arkade Nest?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback