Home / Browse projects / Pune, Maharashtra / ARKAA GALAXY
ARKAA GALAXY
By AGARWAL AND BHONDVE BUILDCON LLP
RG-MH-87812 · RERA P52100045836 · Last updated on MahaRERA portal: 19 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 36 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ARKAA GALAXY is a Residential / Group Housing project by AGARWAL AND BHONDVE BUILDCON LLP in Pune, Maharashtra, registered with MahaRERA as P52100045836 on 15 Jun 2022. Possession is promised by 31 Dec 2028. The completion date has moved by 36 months from the original filing. 0 of the 57 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.
At a glance
Project
- NameARKAA GALAXY
- TypeResidential / Group Housing
- Location
- SURVEY NUMBER 76
- RAVET
- RAVET
- Haveli
- Pune
- 412101
- Pincode412101
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100045836
- ReraGenie IDRG-MH-87812
Builder
- NameAGARWAL AND BHONDVE BUILDCON LLP
- Entity typePartnership
- PartnersSHEETAL SOMNATH WAGHMARE, ALOK SANJAY MANTRI
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on15 Jun 2022
- Promised completion31 Dec 2028
- Revised completionRevised to 31 Dec 2028 (originally 31 Dec 2025)
- Buildings3 building records
- Documents filed91 files
Current status
Figures as on 19 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING B | NA | 7 | 7 | 28 | 1 | 29 |
| BUILDING B | WING A | 9 | 7 | 0 | 0 | 0 |
| BUILDING B | BUILDING A | 9 | 7 | 28 | 0 | 28 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 19 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 90%.
WING B8%
| Activity | Progress |
|---|---|
| Excavation | 90% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING B · wing WING ANot stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
BUILDING B · wing BUILDING ANot stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 19 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed24
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SWAMI NATHU BHONDVE | Ravet | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUILDING B | BUILDING A | Rs 17.72 cr | Rs 1.93 cr |
| WING B | NA | Rs 12.63 cr | Rs 2.31 cr |
| - | NA | Rs 81.16 lakh | - |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SANDEEP DANGE |
| Engineer | N. D. JARAG AND ASSOCIATES |
| Engineer | SHAILESH BHONDVE |
| Engineer | Sanjay Kawade |
| Chartered Accountant | VINIT D ACHHA AND ASSOCIATES |
| Chartered Accountant | Mohmedyasir A Bagwan |
| Partner | Role in project |
|---|---|
| AGARWAL AND BHONDVE BUILDCON LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterA few days after our project was registered in RERA we stopped the project because of some disagreements in Landover but now everything is cleared so there are no disagreements, so now we are applying the project extension
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 Jun 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 May 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 Jun 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed91
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 19 Jul 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 19 Jul 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 19 Jul 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 19 Jul 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 19 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 Arkaa Galaxy Q4 FY 2025-26.pdf | 19 Jul 2026 |
| Form 2A (FY 2022-2023)File: Form 2A 22-23.pdf | 19 Jul 2026 |
| Form 2A (FY 2023-2024)File: Form 2A 23-24.pdf | 19 Jul 2026 |
| Form 2A (FY 2024-2025)File: Form 5 24-25.pdf | 19 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 2A 25-26.pdf | 19 Jul 2026 |
| Withdrawal Update Form 1File: Arka Galaxy Form 1.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Arkaa.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Arkaa_1.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 20 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2.pdf | 20 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 Arkka 1.pdf | 20 Oct 2025 |
| Form 5 (FY 2024-2025)File: FORM 5.pdf | 26 Sep 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 23 Aug 2025 |
| Withdrawal Update Form 2File: Form 2 2.pdf | 23 Aug 2025 |
| Withdrawal Update Form 3File: Form 3 1_compressed.pdf | 23 Aug 2025 |
| Form 1File: Form 1.pdf | 25 Jun 2025 |
| Form 2File: Form 2.pdf | 25 Jun 2025 |
| Form 3File: Form 3- Agarwal and Bhondve Buildcon LLP_compressed.pdf | 25 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory.pdf | 25 Jun 2025 |
| Layout approvalFile: Layout 11.pdf | 9 May 2025 |
| Copy of Layout Approval (in case of layout)File: Layout 11.pdf | 9 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 18 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 18 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 18 Apr 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Extension.pdf | 18 Apr 2025 |
| Details of encumbrances concerned to FinanceFile: Enc Legal.pdf | 28 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory.pdf | 28 Feb 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf | 28 Feb 2025 |
| Details of encumbrances concerned to LegalFile: Enc Legal.pdf | 28 Feb 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DOI.pdf | 28 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf | 28 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24.pdf | 28 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Form 1 Dec 22.pdf | 20 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Form 1 march 23.pdf | 20 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Form 1 June 23.pdf | 20 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Form 1 Sep 23.pdf | 20 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 Form 1 Dec 23.pdf | 20 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 Form 1 March 24.pdf | 20 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 Form 1 June 24.pdf | 20 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 Form 1 Sep 24.pdf | 20 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 Form 1 Dec 24.pdf | 20 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 sep 22.pdf | 20 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7 Form 3 March 24_11zon.pdf | 20 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10 Form 3 Dec 24_11zon.pdf | 20 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 9 Form 3 Sep 24_11zon.pdf | 20 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8 Form 3 June 24_11zon.pdf | 20 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6 Form 3 Dec 23_11zon.pdf | 20 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 Form 3 June 23_11zon.pdf | 20 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 March 23_11zon.pdf | 20 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 Form 3 dec 22_11zon.pdf | 20 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 Form 3 Sep 22_11zon.pdf | 20 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 Form 3 Sep 23_11zon.pdf | 20 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 04 Apr-Jun 23.pdf | 20 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 Oct-Dec 24.pdf | 20 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 09 Jul- Sep 24.pdf | 20 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 08 Jan-Mar 24.pdf | 20 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 07 Apr-Jun 24.pdf | 20 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 06 Oct- Dec 23.pdf | 20 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 05 Jul-Sep 23.pdf | 20 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03 Jan Mar 23.pdf | 20 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 02 Oct-Dec 22.pdf | 20 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 01 Jun-Sep 22.pdf | 20 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf | 20 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24.pdf | 20 Feb 2025 |
| Layout approvalFile: Layout 1.pdf | 13 Jun 2022 |
| Building plan approvalFile: Plan 2.pdf | 13 Jun 2022 |
| Building plan approvalFile: Plan 1.pdf | 13 Jun 2022 |
| Building plan approvalFile: Plan 3.pdf | 13 Jun 2022 |
| Copy of Layout Approval (in case of layout)File: Layout 1.pdf | 13 Jun 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf | 13 Jun 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 1.pdf | 13 Jun 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 3.pdf | 13 Jun 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: C C.pdf | 13 Jun 2022 |
| Details of encumbrancesFile: No Encumbrance.pdf | 8 Jun 2022 |
| Declaration in FORM BFile: Form B - Promoter.pdf | 8 Jun 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 91 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep ARKAA GALAXY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near RAVET13,700+ in Pune
Filed coordinates, straight-line distance. 261 registered projects within 2 km.
Godrej Park Greens
Godrej Skyline Developers Limited
FOREST GROVE AT GODREJ PARK GREENS
Godrej Skyline Developers Limited
Om Mangalam Samruddhi
NDG Homes LLP
PCMC EWS KIWALE
Pimpri Chinchwad Municipal Corporation
Godrej Nurture
Godrej Skyline Developers Limited
My Home Sanctuary Phase I
MAMURDI DEVELOPERS LLP
Builder: AGARWAL AND BHONDVE BUILDCON LLP
AGARWAL AND BHONDVE BUILDCON LLP has 1 registration on MahaRERA, including ARKAA GALAXY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if ARKAA GALAXY is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ARKAA GALAXY?
The registered promoter entity is AGARWAL AND BHONDVE BUILDCON LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ARKAA GALAXY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ARKAA GALAXY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ARKAA GALAXY?
The professionals named in the filing: Architect: SANDEEP DANGE; Engineer: N. D. JARAG AND ASSOCIATES; Engineer: SHAILESH BHONDVE; Engineer: Sanjay Kawade; Chartered Accountant: VINIT D ACHHA AND ASSOCIATES; Chartered Accountant: Mohmedyasir A Bagwan. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ARKAA GALAXY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback