ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Arihant Avanti Phase II

Registered No litigation declared Residential / Group Housing project

Arihant Avanti Phase II

By ARIHANT SUPERSTRUCTURES LIMITED

RG-MH-23529 · RERA P51700078840 · Last updated on MahaRERA portal: 17 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 13 other registrations.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2031Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Plinth, 20%
374 of 444Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 59 documents Report an error

Arihant Avanti Phase II is a Residential / Group Housing project by ARIHANT SUPERSTRUCTURES LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700078840 on 15 Jan 2025. Possession is promised by 31 Dec 2031. 70 of the 444 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameArihant Avanti Phase II
  • TypeResidential / Group Housing
  • Location
    • Survey No. 57/3 Village Padale
    • Survey No. 18/2 Village Shil & Survey No. 109/1/A
    • 109/1/B & 108/2 Village Daighar
    • Village- Padale
    • Shil and Daighar
    • Thane...
  • Pincode421204
  • RERA no.P51700078840
  • ReraGenie IDRG-MH-23529

Builder

  • NameARIHANT SUPERSTRUCTURES LIMITED
  • Entity typeCompany
  • CINL51900MH1983PLC029643
  • GSTIN27AABCS1848L1Z2
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsASHOKKUMAR BHANWARLAL CHHAJER, PARTH ASHOKKUMAR CHHAJER
  • Other registrations13 more →
  • Completed5 of 14

Key dates

this monthRegisteredJan 2025PromisedDec 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Jan 2025
  • Promised completion31 Dec 2031
  • Revised completionNone
  • Buildings1 building record
  • Documents filed59 files

Current status

16%70 of 444 units booked
7.9%Work done, per cost certificate

Figures as on 17 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Angelo Building No-1NA42414440444

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Plinth, at 20%.

Angelo Building No-1: 11% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth20%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes95%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed22

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots22
Closed/Covered22

Land and ownership8

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,168 sq m
Land owned byThe promoter, with other names on the file
Named landowners8
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Oct 2025
LandownerVillageDistrict
Mukesh Dharamshi (Alias Shankarlal) BhanushaliNavi Mumbai (M Corp.)Thane
M/s. Marvel Lifespaces LLPNavi Mumbai (M Corp.)Thane
Dinesh Shankarlal BhanushaliNavi Mumbai (M Corp.)Thane
M/s. Affluence PropertiesNavi Mumbai (M Corp.)Thane
Mayuresh Mukund KeniNavi Mumbai (M Corp.)Thane
Mandar Mukund KeniNavi Mumbai (M Corp.)Thane
Pramila Mukund KeniNavi Mumbai (M Corp.)Thane
Pradeep Dattatray KeniNavi Mumbai (M Corp.)Thane

Approvals and building plan

Sanctioning authorityTHANE MUNICIPAL CORPORATION
Permissible FSI27209.5
Proposed, not sanctioned25,210 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Shop No. 4, Arihant Auro Building, Opp. Turbhe Railway Station, Turbhe MIDC, Thane Belapur road, Navi Mumbai, Maharashtra.400705
Estimated costRs 120.99 cr
Cost incurredRs 9.56 cr
Work done7.9%
BuildingWingEstimatedIncurred
Angelo Building No-1NARs 113.95 crRs 9.56 cr
-NARs 7.04 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYogita Bhandarkar
EngineerKALEEM SAYYAD
EngineerAavez Ali
Chartered AccountantANJANI KUMAR GOYAL
Chartered AccountantUmmed Jain & Co.
PartnerRole in project
ARIHANT SUPERSTRUCTURES LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2031

Documents filed59

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 9 Form 1_Avanti Ph II_310326.pdf17 Apr 2026
Withdrawal Update Form 2File: Form 2_Avanti Ph II_250326.pdf17 Apr 2026
Withdrawal Update Form 3File: 9 Form 3_Avanti Ph II_250326.pdf17 Apr 2026
Withdrawal Update Form 1File: Form 1_Avanti Ph II_31122025.pdf29 Jan 2026
Withdrawal Update Form 2File: Form 2_Avanti Ph II_31122025.pdf29 Jan 2026
Withdrawal Update Form 3File: Form 3_Avanti Ph II_31122025.pdf29 Jan 2026
Withdrawal Update Form 1File: Form 1_AVANTI PHASE II_30092025.pdf24 Oct 2025
Withdrawal Update Form 2File: Form 2_Avanti Ph II_30092025.pdf24 Oct 2025
Withdrawal Update Form 3File: Form 3_Avanti Phase II_30092025.pdf24 Oct 2025
Form 5 (FY 2024-2025)File: Avanti Phase II.pdf17 Oct 2025
Form 2A (FY 2024-2025)File: Avanti Phase II.pdf4 Oct 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE Revised_Signed.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Avanti Ph II_310325.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Avanti Ph II_310325.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Avanti Ph II_310325.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE SIGNED.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Avanti-Declaration for Land Cost.pdf13 Jan 2025
Other - FinanceFile: 20426.pdf13 Jan 2025
Other - FinanceFile: 5398-3.pdf13 Jan 2025
Other - FinanceFile: 8387-2.pdf13 Jan 2025
Other - FinanceFile: 8387-1.pdf13 Jan 2025
Other - FinanceFile: Avanti-Declaration for Landowner Bank Account.pdf13 Jan 2025
Other - FinanceFile: Avanti-Declaration for Land Cost.pdf13 Jan 2025
Proforma of Allotment letterFile: Final Al_Arihant Avanti Phase II 23122024.pdf11 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - AVANTI PHASE II_11zon.pdf11 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Avanti Ph II - Format A.pdf11 Dec 2024
Deviation Report with respect to Allotment letterFile: Avanti Ph II - Allotment Letter Deviation.pdf11 Dec 2024
Deviation Report with respect to model copy of AgreementFile: Avanti Ph II - AFS Deviation_11zon.pdf11 Dec 2024
Proforma of Agreement for saleFile: RERA Draft Agreement to be uploaded dt 11122024.pdf11 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Avanti Ph II_Format B.pdf6 Dec 2024
Building plan approvalFile: scan1392_11zon.pdf2 Dec 2024
Building plan approvalFile: scan1385_11zon.pdf2 Dec 2024
Building plan approvalFile: scan1381_11zon (1).pdf2 Dec 2024
Building plan approvalFile: scan1380_11zon (2).pdf2 Dec 2024
Building plan approvalFile: scan_11zon (3).pdf2 Dec 2024
Layout approvalFile: scan_11zon (3).pdf2 Dec 2024
Copy of the legal title reportFile: Avanti_Legal Title Report_13112024_11zon.pdf2 Dec 2024
Copy of Layout Approval (in case of layout)File: scan_11zon (3).pdf2 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: scan_11zon (3).pdf2 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: scan1380_11zon (2).pdf2 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: scan1381_11zon (1).pdf2 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: scan1385_11zon.pdf2 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: scan1392_11zon.pdf2 Dec 2024
Other - TechnicalFile: 3 Other - Technical.pdf2 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 4 (4)_compressed.pdf2 Dec 2024
PAN CardFile: ASL Pan Card.pdf23 Nov 2024
Details of encumbrances concerned to FinanceFile: No ENCUMBRANCE LETTER -Dues.pdf23 Nov 2024
Details of encumbrances concerned to FinanceFile: No ENCUMBRANCE LETTER Litigations.pdf23 Nov 2024
Declaration in FORM BFile: FORM B - ARIHANT.pdf23 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - AVANTI PHASE II.PDF23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - AVANTI PHASE II.pdf23 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: AVANTI CC LETTER .PDF23 Nov 2024
Declaration about Commencement CertificateFile: FORMAT D(32).pdf23 Nov 2024
CERSAI detailsFile: Declaration of Cersai.pdf23 Nov 2024
Details of encumbrances concerned to LegalFile: No ENCUMBRANCE LETTER -Dues.pdf23 Nov 2024
Details of encumbrances concerned to LegalFile: No ENCUMBRANCE LETTER Litigations.pdf23 Nov 2024
Other - TechnicalFile: 1 Other - Technical (77).pdf23 Nov 2024
Other - TechnicalFile: Clarification Regarding Plot Area- Arihant Avanti.pdf23 Nov 2024
Disclosure for secured/unsecured finance availed for the projectFile: 1 Disclosure for secured_unsecured finance availed for the project (29).pdf23 Nov 2024

How this compares with Thane

16%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Arihant Avanti Phase II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Village- Padale, Shil and Daighar7,600+ in Thane

Builder: ARIHANT SUPERSTRUCTURES LIMITED

ARIHANT SUPERSTRUCTURES LIMITED has 14 registrations on MahaRERA, including ARIHANT ARSHIYA PHASE II and ARIHANT ARSHIYA PHASE III. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Arihant Avanti Phase II is delayed beyond 31 Dec 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Arihant Avanti Phase II?

The registered promoter entity is ARIHANT SUPERSTRUCTURES LIMITED, a company as per the filing. Its CIN L51900MH1983PLC029643 and GSTIN 27AABCS1848L1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Arihant Avanti Phase II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Arihant Avanti Phase II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Arihant Avanti Phase II?

The professionals named in the filing: Architect: Yogita Bhandarkar; Engineer: KALEEM SAYYAD; Engineer: Aavez Ali; Chartered Accountant: ANJANI KUMAR GOYAL; Chartered Accountant: Ummed Jain & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Arihant Avanti Phase II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Arihant Avanti Phase II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Arihant Avanti Phase II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.