ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / ARCH DEVELOPERS

Registered No litigation declared Residential / Group Housing project

ARCH DEVELOPERS

By ARCH DEVELOPERS

RG-MH-29984 · RERA P99000029591 · Last updated on MahaRERA portal: 18 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 48 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 48 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 80%
55 of 88Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

ARCH DEVELOPERS is a Residential / Group Housing project by ARCH DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000029591 on 11 Jun 2021. Possession is promised by 31 Mar 2027. The completion date has moved by 48 months from the original filing. 33 of the 88 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameARCH DEVELOPERS
  • TypeResidential / Group Housing
  • Location
    • WALIV NAKA
    • VASAI EAST
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401208
  • Pincode401208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000029591
  • ReraGenie IDRG-MH-29984

Builder

  • NameARCH DEVELOPERS
  • Entity typePartnership
  • PartnersIRFAN ADAM MEMON, IRFAN MOHAMMAD MEMON, MOHAMMAD ASLAM KHAN, KHALID ILYAS MALIK, ILYAS ABDULRAHIM SUNASARA, PRADEEP HIMATLAL MEHTA, HEMANT PADMAN PATIL
  • Other registrations6 more →
  • Completed6 of 7

Key dates

this monthRegisteredJun 2021First promiseMar 2023Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Jun 2021
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 31 Mar 2023)
  • Buildings1 building record
  • Documents filed71 files

Current status

38%33 of 88 units booked

Figures as on 18 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VIJAYNAGAR BUILDING NO 2 E AND FNA9908888

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 80%.

VIJAYNAGAR BUILDING NO 2 E AND F: 52% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 18 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes20%
Water SupplyYes20%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsYes20%
Landscaping & Tree PlantingYes20%
Street LightingYes20%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes20%
Solid Waste Management And DisposalYes20%
Water conservation /Rain water harvestingYes20%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes20%
Electrical meter room, sub-station, receiving stationYes20%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed40

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots40
Open Space40

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,786 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityvasai virar shahar mahanagarpalika
Permissible FSI5785.76
Proposed, not sanctioned5,786 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchWALIV -NAKA

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMR SANJAY S NARANG
EngineerS S AND ASSOCIATES
Chartered AccountantS M VAGADARGI AND CO
Chartered AccountantRahim Mansur Rajwani
PartnerRole in project
ARCH DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000016506Mar 2023 → Mar 2027

Reason as filed by the promoterAs on 17/12/2020 CC was approved only for Bldg NO 2 Wing E and Wing F St+4, 40 Flats Built Up Area 1676.72 sq.m however as on 27/06/2022 CC has been revised for Bldg No 2 Wing E St+9 44 Flats and Wing F St+9 44Flats with buit up area of 2892.88 sq.m . so we are in pledge for extension of the project.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 May 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 May 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 15 Dec 2022

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: form 1 certificate.pdf18 Jun 2026
Form 2File: form 2.pdf18 Jun 2026
Form 3File: CA CERTIFIED FORM 3.pdf18 Jun 2026
Disclosure of Sold and Booked InventoryFile: sold and unsold inventory.pdf18 Jun 2026
Form 1File: form 1.pdf18 Jun 2026
Form 2File: form 2.pdf18 Jun 2026
Form 3File: FORM -3.pdf18 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold and booked Inventory.pdf18 Jun 2026
Form 1File: Form 1.pdf18 Jun 2026
Form 2File: Form 2.pdf18 Jun 2026
Form 3File: FORM -3.pdf18 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold and booked Inventory.pdf18 Jun 2026
Form 1File: form 1.pdf18 Jun 2026
Form 2File: Form 2.pdf18 Jun 2026
Form 3File: FORM -3.pdf18 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold and booked Inventory.pdf18 Jun 2026
Form 5 (FY 2024-2025)File: Signed FORM 5 24-25.pdf29 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_.pdf12 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 certificate SIGN.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 certificate SIGN.pdf24 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 ff.pdf4 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 ff.pdf4 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A designated bank account SIGN.pdf17 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 30-09-24.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 30-09-24.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf5 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE REVISED.pdf5 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VP-0140 Form-1_upload.pdf18 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: VP-0140 Form-2_upload.pdf18 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A.pdf18 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3 FOR UPLOAD_11zon.pdf18 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 for Uploding.pdf18 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: arch devlopers form 3 dec 23_compressed.pdf11 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf29 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf29 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: arch developers01_compressed.pdf4 Oct 2023
Building plan approvalFile: Disclosure of Sold Booked Inventory.pdf12 Aug 2023
Building plan approvalFile: REVISED FLOOR PLAN WING F_compressed.pdf12 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Disclosure of Sold Booked Inventory.pdf12 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: REVISED FLOOR PLAN WING F_compressed.pdf12 Aug 2023
Declaration about Commencement CertificateFile: Declaration of commencement certificate.pdf12 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf19 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf19 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf19 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 updated 2023_compressed.pdf19 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5_compressed.pdf19 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf1 May 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf1 May 2023
Other - TechnicalFile: Form-2A.pdf1 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf28 Apr 2023
Other - TechnicalFile: FORM-2A.pdf28 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: CC_compressed.pdf11 Feb 2023
Proforma of Agreement for saleFile: AGREEMENT FOR SALE.pdf2 Jan 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC FOR C WING VIJAY NAGAR.pdf15 Dec 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC for VIJAY Nagar.pdf15 Dec 2022
Proforma of Allotment letterFile: ALLotment letter.pdf4 Jun 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf3 Jun 2021
Building plan approvalFile: Floor plan bldg 2 wing E.pdf31 May 2021
Layout approvalFile: Layout plan BLDG 2 E ANDF.pdf31 May 2021
Building plan approvalFile: Floor plan bldg2 wing F.pdf31 May 2021
PAN CardFile: firm pan card.pdf31 May 2021
Copy of the legal title reportFile: SEARCH REPORT.pdf31 May 2021
Details of encumbrancesFile: Encumbrance certificate.pdf31 May 2021
Copy of Layout Approval (in case of layout)File: Layout plan BLDG 2 E ANDF.pdf31 May 2021
Building Plan Approval / NA Order for plotted developmentFile: Floor plan bldg 2 wing E.pdf31 May 2021
Building Plan Approval / NA Order for plotted developmentFile: Floor plan bldg2 wing F.pdf31 May 2021
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf31 May 2021
Declaration in FORM BFile: FORM B.pdf31 May 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate form 1.pdf31 May 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate form 2.pdf31 May 2021
Proforma of Allotment letterFile: agreement copy.pdf31 May 2021

How this compares with Palghar

38%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 48 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ARCH DEVELOPERS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VASAI EAST3,200+ in Palghar

2 kmARCH DEVELOPERSCompleted 23Lapsed / revoked 11Other 22Dot size: filed unitsN

Filed coordinates, straight-line distance. 56 registered projects within 2 km.

Builder: ARCH DEVELOPERS

ARCH DEVELOPERS has 7 registrations on MahaRERA, including ARCH SAPTARANG and ARCH GULMOHAR. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if ARCH DEVELOPERS is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ARCH DEVELOPERS?

The registered promoter entity is ARCH DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ARCH DEVELOPERS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ARCH DEVELOPERS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ARCH DEVELOPERS?

The professionals named in the filing: Architect: MR SANJAY S NARANG; Engineer: S S AND ASSOCIATES; Chartered Accountant: S M VAGADARGI AND CO; Chartered Accountant: Rahim Mansur Rajwani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ARCH DEVELOPERS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ARCH DEVELOPERS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ARCH DEVELOPERS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.