Registered No litigation declared Residential / Group Housing project

Anvi Serenity

By Anvi Associates

RG-MH-80499 · RERA P52100049170 · Last updated on MahaRERA portal: 4 Aug 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 24 months from the original
6 of 11Construction stages doneacross 3 buildings; furthest along: Internal walls, 80%
53 of 71Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 158 documents Report an error

Anvi Serenity is a Residential / Group Housing project by Anvi Associates in Pune, Maharashtra, registered with MahaRERA as P52100049170 on 3 Feb 2023. Possession is promised by 31 Dec 2027. The completion date has moved by 24 months from the original filing. 18 of the 71 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameAnvi Serenity
  • TypeResidential / Group Housing
  • Location
    • BAVDHAN BUDRUK S NO 24/5/A
    • BAVDHAN BUDRUK
    • Bavadhan BK
    • Mulshi
    • Pune
    • 411021
  • Pincode411021
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100049170
  • ReraGenie IDRG-MH-80499

Builder

  • NameAnvi Associates
  • Entity typePartnership
  • PartnersVIKAS BABAJI CHARWAD, RAVINDRA SAKHARAM TAGUNDE

Key dates

this monthRegisteredFeb 2023First promiseDec 2025Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Feb 2023
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2025)
  • Buildings3 building records
  • Documents filed158 files

Current status

25%18 of 71 units booked
81.4%Work done, per cost certificate

Figures as on 4 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANVI SERENITYNA87581371
Anvi SerenityAnvi Serenity97000
Anvi SerenityAnvi Serenity A53000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 4 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 80%.

ANVI SERENITY86%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
Anvi Serenity · wing Anvi SerenityNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
Anvi Serenity · wing Anvi Serenity ANot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 4 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed181

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots181
Closed/Covered26
Open Space155

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,600 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Nov 2025
LandownerVillageDistrict
Kailas Dattu BhundeBavadhan BKPune
SAKAHARAM DATTATRAY BHUNDEBavadhan BKPune

Approvals and building plan

Sanctioning authorityPMC Pune
Permissible FSI2688.58
Proposed, not sanctioned2,689 sq m
Buildings approved2
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchWARJE PUNE MAHARASHTRA 411058
Estimated costRs 34.50 cr
Cost incurredRs 28.08 cr
Work done81.39%
BuildingWingEstimatedIncurred
ANVI SERENITYNARs 11.50 crRs 9.36 cr
Anvi SerenityAnvi SerenityRs 11.50 crRs 9.36 cr
-NARs 11.50 crRs 9.36 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAJESH THAKORE YOGIRAJ ASSOCIATES Rajesh Thakore
ArchitectKshitija S More
EngineerAmit Jori Amit Jori
EngineerPravin More Pravin More
EngineerKiran Dhondiram Desai
Chartered AccountantDinesh Sudam Kudale Sudam Kudale
Chartered AccountantSagar R Pujari
PartnerRole in project
Anvi Associates-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA01122518480Dec 2025 → Dec 2027

Reason as filed by the promoterAdjacent plot added and revised sanction

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12602456Asif AnsariAnvi Associates27/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Oct 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed158

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 158 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: AR cretificates .pdf4 Aug 2026
Form 2File: engineer cretificates .pdf4 Aug 2026
Form 3File: CA cretificates.pdf4 Aug 2026
Disclosure of Sold and Booked InventoryFile: Sold Mar 23.pdf4 Aug 2026
Form 1File: AR cretificates .pdf4 Aug 2026
Form 2File: engineer cretificates .pdf4 Aug 2026
Form 3File: CA cretificates.pdf4 Aug 2026
Disclosure of Sold and Booked InventoryFile: Sold Jun 23.pdf4 Aug 2026
Form 1File: AR cretificates .pdf4 Aug 2026
Form 2File: engineer cretificates .pdf4 Aug 2026
Form 3File: CA cretificates.pdf4 Aug 2026
Disclosure of Sold and Booked InventoryFile: Sold Sep 23.pdf4 Aug 2026
Form 1File: Architect.pdf4 Aug 2026
Form 2File: Engineers.pdf4 Aug 2026
Form 3File: CA1.pdf4 Aug 2026
Disclosure of Sold and Booked InventoryFile: Sold Dec 23.pdf4 Aug 2026
Form 1File: Arch.pdf4 Aug 2026
Form 2File: Engineer.pdf4 Aug 2026
Form 3File: CA anvi.pdf4 Aug 2026
Disclosure of Sold and Booked InventoryFile: Sold Mar 24.pdf4 Aug 2026
Form 1File: AR cretificates .pdf4 Aug 2026
Form 2File: engineers cretificates .pdf4 Aug 2026
Form 3File: CA cretificates .pdf4 Aug 2026
Disclosure of Sold and Booked InventoryFile: Sold June 24.pdf4 Aug 2026
Form 1File: Arch Dec 24.pdf4 Aug 2026
Form 2File: Eng Sep 24.pdf4 Aug 2026
Form 3File: CA Dec 24.pdf4 Aug 2026
Disclosure of Sold and Booked InventoryFile: Sold Sep 24.pdf4 Aug 2026
Form 1File: Arch Dec 24.pdf4 Aug 2026
Form 2File: Eng Dec 24.pdf4 Aug 2026
Form 3File: CA Dec 24.pdf4 Aug 2026
Disclosure of Sold and Booked InventoryFile: Sold Dec 24.pdf4 Aug 2026
Form 1File: Arch Mar 25.pdf4 Aug 2026
Form 2File: Eng Mar 25.pdf4 Aug 2026
Form 3File: CA Mar 25.pdf4 Aug 2026
Disclosure of Sold and Booked InventoryFile: Sold Mar 25.pdf4 Aug 2026
Withdrawal Update Form 1File: Arch Dec 25.pdf4 Aug 2026
Withdrawal Update Form 1File: Arch Dec 25.pdf4 Aug 2026
Withdrawal Update Form 1File: Arch Mar 26.pdf4 Aug 2026
Withdrawal Update Form 1File: Architect Jun 26.pdf4 Aug 2026
Withdrawal Update Form 2File: Engineer Dec 25.pdf4 Aug 2026
Withdrawal Update Form 2File: Engineer Dec 25.pdf4 Aug 2026
Withdrawal Update Form 2File: Engineer Mar 26.pdf4 Aug 2026
Withdrawal Update Form 2File: Engineer Jun 26.pdf4 Aug 2026
Withdrawal Update Form 3File: CA Dec 25.pdf4 Aug 2026
Withdrawal Update Form 3File: CA Dec 25.pdf4 Aug 2026
Withdrawal Update Form 3File: CA Mar 26.pdf4 Aug 2026
Withdrawal Update Form 3File: CA Jun 26.pdf4 Aug 2026
Form 2A (FY 2022-2023)File: QA 2022 to 2023.pdf4 Aug 2026
Form 2A (FY 2023-2024)File: quality assurance certificate 2023 to 2024.pdf4 Aug 2026
Form 2A (FY 2024-2025)File: QA 2024 to 2025.pdf4 Aug 2026
Form 2A (FY 2025-2026)File: QA 2025 to 2026.pdf4 Aug 2026
Form 2A (FY 2026-2027)File: QA 2026 to 2027.pdf4 Aug 2026
Form 5 (FY 2022-2023)File: Form 5 2022 to 23.pdf4 Aug 2026
Form 5 (FY 2023-2024)File: Form 5 2023 to 2024.pdf4 Aug 2026
Form 5 (FY 2024-2025)File: Form 5 2024 to 25.pdf4 Aug 2026
Form 5 (FY 2025-2026)File: Form 5 2025 to 26.pdf4 Aug 2026
Withdrawal Update Form 1File: Arch Jun 25.pdf1 Dec 2025
Withdrawal Update Form 1File: Architect.pdf1 Dec 2025
Withdrawal Update Form 2File: Engineer com.pdf1 Dec 2025
Withdrawal Update Form 2File: Engineer.pdf1 Dec 2025
Withdrawal Update Form 3File: CA Jun 25.pdf1 Dec 2025
Withdrawal Update Form 3File: CA.pdf1 Dec 2025
Declaration and undertaking (Annexure A)File: Secured Unsecured.pdf24 Nov 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Mar 25.pdf12 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Dec 23.pdf11 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Dec 24.pdf11 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Sept 23.pdf11 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA June 24.pdf11 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Dec 24.pdf11 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Mar 25.pdf11 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Mar 25.pdf11 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng June 25.pdf11 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Dec 24.pdf11 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Sep 24.pdf11 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng June 24.pdf11 Jul 2025
Disclosure of sold/ booked inventoryFile: Sold June 24.pdf11 Jul 2025
Disclosure of sold/ booked inventoryFile: Sold Sep 24.pdf11 Jul 2025
Disclosure of sold/ booked inventoryFile: Sold Mar 25.pdf11 Jul 2025
Disclosure of sold/ booked inventoryFile: Sold June 25.pdf11 Jul 2025

How this compares with Pune

25%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Anvi Serenity on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BAVDHAN BUDRUK13,700+ in Pune

2 kmAnvi SerenityCompleted 61Lapsed / revoked 37Other 57Dot size: filed unitsN

Filed coordinates, straight-line distance. 155 registered projects within 2 km.

Builder: Anvi Associates

Anvi Associates has 1 registration on MahaRERA, including Anvi Serenity. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Anvi Serenity is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Anvi Serenity?

The registered promoter entity is Anvi Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Anvi Serenity?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Anvi Serenity?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Anvi Serenity?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Anvi Serenity?

The professionals named in the filing: Architect: RAJESH THAKORE YOGIRAJ ASSOCIATES Rajesh Thakore; Architect: Kshitija S More; Engineer: Amit Jori Amit Jori; Engineer: Pravin More Pravin More; Engineer: Kiran Dhondiram Desai; Chartered Accountant: Dinesh Sudam Kudale Sudam Kudale. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Anvi Serenity?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Anvi Serenity. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Anvi Serenity to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.