ReraGenieLog inGet a buyer report

Home / Browse projects / Nashik, Maharashtra / Anuveena Heights

Registered No litigation declared Residential / Group Housing project

Anuveena Heights

By Vivek Deepak Moule

RG-MH-19397 · RERA P51600077677 · Last updated on MahaRERA portal: 4 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 12 months from the original
7 of 11Construction stages donefurthest along: External plumbing and external plaster, 90%
18 of 25Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 49 documents Report an error

Anuveena Heights is a Residential / Group Housing project by Vivek Deepak Moule in Nashik, Maharashtra, registered with MahaRERA as P51600077677 on 21 Oct 2024. Possession is promised by 30 Jun 2027. The completion date has moved by 12 months from the original filing. 7 of the 25 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameAnuveena Heights
  • TypeResidential / Group Housing
  • Location
    • Amber Link Road
    • Near Jyoti Farm
    • Satpur
    • Satpur
    • Nashik
    • 422010
  • Pincode422010
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600077677
  • ReraGenie IDRG-MH-19397

Builder

  • NameVivek Deepak Moule
  • Entity typeIndividual
  • GSTIN27CROPM4969B2ZB

Key dates

this monthRegisteredOct 2024First promiseJun 2026Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Oct 2024
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 15 Jun 2026)
  • Buildings1 building record
  • Documents filed49 files

Current status

28%7 of 25 units booked
73.7%Work done, per cost certificate

Figures as on 4 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Anuveena HeightsNA5525025

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 90%.

Anuveena Heights: 80% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 4 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed33

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots33
Closed/Covered9
Open Space24

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area465 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on27 Aug 2026
LandownerVillageDistrict
Sushil Suresh AnturlikarNashik (M Corp.)Nashik
Vaishali Sushil AnturlikarNashik (M Corp.)Nashik

Approvals and building plan

Sanctioning authorityNMC
Permissible FSI1283.85
Proposed, not sanctioned1,284 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchA-I &2 'PRATHAMESH APARTMENT, THATTENAGAR, GANGAPUR ROAD, NASIK
Estimated costRs 2.40 cr
Cost incurredRs 1.77 cr
Work done73.66%
BuildingWingEstimatedIncurred
Anuveena HeightsNARs 2.40 crRs 1.77 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectG S Associates
EngineerAkash Consultancy
Chartered AccountantSachin K. Mishra & Co.
PartnerRole in project
Vivek Deepak Moule-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA03092622455Jun 2026 → Jun 2027

Reason as filed by the promoterThere were liquidity issues and delays in funding. Labour and material shortages, along with disruptions in supply chains and workforce availability, are impacting construction timelines.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed49

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: RERA Audit Report_24-25_Anuveena Heights.pdf4 Sep 2026
Form 2A (FY 2025-2026)File: Form 2A 2025-26.pdf3 Sep 2026
Form 1File: Architect Certificate -Mar 25.pdf29 Aug 2026
Form 2File: Engineer Certificate_Mar 25.pdf29 Aug 2026
Form 3File: CA Certificate_Anuveena_Mar25.pdf29 Aug 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory - March 25.pdf29 Aug 2026
Withdrawal Update Form 1File: Architect Certificate -Jun 25.pdf29 Aug 2026
Withdrawal Update Form 1File: Architect Certificate -Sep 25.pdf29 Aug 2026
Withdrawal Update Form 1File: Architect Certificate -Dec 25.pdf29 Aug 2026
Withdrawal Update Form 1File: Architect Certificate -Mar 26.pdf29 Aug 2026
Withdrawal Update Form 1File: Architect Certificate -Jun 26.pdf29 Aug 2026
Withdrawal Update Form 2File: Engineer Certificate_Jun 25.pdf29 Aug 2026
Withdrawal Update Form 2File: Engineer Certificate_Sep 25.pdf29 Aug 2026
Withdrawal Update Form 2File: Engineer Certificate_Dec 25.pdf29 Aug 2026
Withdrawal Update Form 2File: Engineer Certificate_Mar 26.pdf29 Aug 2026
Withdrawal Update Form 2File: Engineer Certificate_Jun 26.pdf29 Aug 2026
Withdrawal Update Form 3File: CA Certificate_Anuveena_Jun25.pdf29 Aug 2026
Withdrawal Update Form 3File: CA Certificate_Anuveena_Sep25.pdf29 Aug 2026
Withdrawal Update Form 3File: CA Certificate_Anuveena_Dec25.pdf29 Aug 2026
Withdrawal Update Form 3File: CA Certificate_Anuveena_Mar26.pdf29 Aug 2026
Withdrawal Update Form 3File: CA Certificate_Anuveena_Jun26.pdf29 Aug 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certifiacte.pdf17 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format-B.pdf17 Oct 2024
Copy of the legal title reportFile: Legal Title Report_1 (3 files merged).pdf10 Oct 2024
Other - LegalFile: Development Agreement.pdf10 Oct 2024
Other - LegalFile: POA.pdf10 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format-A_1 (4 files merged).pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar - Moule.pdf18 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Er - moule.pdf18 Jul 2024
Other - TechnicalFile: Declaration of One Plot One Registration - Anuveena Heights.pdf18 Jul 2024
Proforma of Agreement for saleFile: Draft Agreement For Sale.pdf18 Jul 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for securedunsecured finance availed for the project (1).pdf17 Jul 2024
Building plan approvalFile: Plan.pdf11 Jul 2024
Layout approvalFile: Plan.pdf11 Jul 2024
PAN CardFile: PAN Card.pdf11 Jul 2024
Details of encumbrances concerned to FinanceFile: Encumbrances concerned to Finance.pdf11 Jul 2024
Details of encumbrances concerned to FinanceFile: Encumbrances concerned to Legal.pdf11 Jul 2024
Copy of Layout Approval (in case of layout)File: Plan.pdf11 Jul 2024
Proforma of Allotment letterFile: Allotment letter.pdf11 Jul 2024
Declaration in FORM BFile: Form B Developers.pdf11 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: HPSCANNER3978 - Copy.pdf11 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan.pdf11 Jul 2024
Declaration about Commencement CertificateFile: Form D.pdf11 Jul 2024
CERSAI detailsFile: CERSAI details.pdf11 Jul 2024
Deviation Report with respect to Allotment letterFile: Deviation Report - Allotment letter.pdf11 Jul 2024
Details of encumbrances concerned to LegalFile: Encumbrances concerned to Finance.pdf11 Jul 2024
Details of encumbrances concerned to LegalFile: Encumbrances concerned to Legal.pdf11 Jul 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report - Agreement.pdf11 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf11 Jul 2024

How this compares with Nashik

28%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one moved by 12 months
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Anuveena Heights on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Jyoti Farm, Satpur4,100+ in Nashik

2 kmAnuveena HeightsCompleted 29Lapsed / revoked 10Other 18Dot size: filed unitsN

Filed coordinates, straight-line distance. 57 registered projects within 2 km.

Builder: Vivek Deepak Moule

Vivek Deepak Moule has 1 registration on MahaRERA, including Anuveena Heights. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if Anuveena Heights is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Anuveena Heights?

The registered promoter entity is Vivek Deepak Moule, an individual as per the filing. Its GSTIN 27CROPM4969B2ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Anuveena Heights?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Anuveena Heights?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Anuveena Heights?

The professionals named in the filing: Architect: G S Associates; Engineer: Akash Consultancy; Chartered Accountant: Sachin K. Mishra & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Anuveena Heights?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Anuveena Heights. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Anuveena Heights to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.