Anandvan Phase II

By Sahyadri Builders and Developers

RG-MH-12262 · RERA P52700003940 · Last updated on MahaRERA portal: 11 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 23 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Nov 2026Possession promisedmoved 23 months from the original
6 of 11Construction stages donefurthest along: External plumbing and external plaster, 60%
0Complaints at MahaRERAon this registration
Jump to the 111 documents Report an error

Anandvan Phase II is a Residential / Group Housing project by Sahyadri Builders and Developers in Satara, Maharashtra, registered with MahaRERA as P52700003940 on 7 Aug 2017. Possession is promised by 30 Nov 2026. The completion date has moved by 23 months from the original filing.

At a glance

Project

  • NameAnandvan Phase II
  • TypeResidential / Group Housing
  • Location
    • WAI
    • Wai (Rural)
    • Satara
    • 412803
  • Pincode412803
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52700003940
  • ReraGenie IDRG-MH-12262

Builder

  • NameSahyadri Builders and Developers
  • Entity typePartnership
  • PartnersHEMALI YOGESH VARE, DATTATRYA SHRIRANG VARE
  • Other registrations1 more →

Key dates

this monthRegisteredAug 2017First promiseDec 2024Revised toNov 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Aug 2017
  • Promised completion30 Nov 2026
  • Revised completionRevised to 30 Nov 2026 (originally 30 Dec 2024)
  • Buildings1 building record
  • Documents filed111 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Anandvan Phase IINA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 60%.

Anandvan Phase II: 70% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure8%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Progress on shared amenities15

As on 11 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed201

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots201
Closed/Covered1
Open Space200

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,466 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Sahyadri Builders and DevelopersSongirwadi (Rural) (CT)Satara
Sahayadri Builders and DevelopersSongirwadi (Rural) (CT)Satara

Approvals and building plan

Permissible FSI4787.0
Proposed, not sanctioned4,787 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchWai

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMadhuri Sagar Zite
PartnerRole in project
Sahyadri Builders and Developers-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52700026061Dec 2024 → Nov 2026

Reason as filed by the promoter1. Reason for Delay The project experienced significant delays due to multiple challenges: o COVID-19 Pandemic: During the COVID-19 period, the construction activities were severely affected due to a shortage of labourers and restrictions on movement. This disruption caused substantial delays in the project timeline. o Financial Constraints: Additionally, the project faced acute financial difficulties, with a lack of available funds and challenges in securing loans, further affecting the continuity of construction. 2. Changes in Floor Plan There was also a requirement for modifications in the

Litigation declared1

CaseCourtStatus
80/2017/2017Wai CourtCase Closed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Nov 2026

Documents filed111

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 111 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 PHASE II - with sign.pdf11 May 2026
Form 2File: form 2 phase 2.pdf11 May 2026
Form 3File: Rera Phase 2 Jan to March 2026.pdf11 May 2026
Disclosure of Sold and Booked InventoryFile: Sold unslod phase 2.pdf11 May 2026
Form 1File: Form 1 - Aanandvan Phase 2 scan.pdf18 Feb 2026
Form 2File: Form 2 Phase II.pdf18 Feb 2026
Form 3File: Form 3 Phase II.pdf18 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Phase II.pdf18 Feb 2026
Form 1File: F1 Sep 2025.pdf18 Nov 2025
Form 2File: F2 Sep2025.pdf18 Nov 2025
Form 3File: F3 Sep2025.pdf18 Nov 2025
Disclosure of Sold and Booked InventoryFile: Inventory Sep2025.pdf18 Nov 2025
Form 1File: Form 1 Phase 2.pdf6 Aug 2025
Form 2File: Form2 phase 2.pdf6 Aug 2025
Form 3File: Phase 2 - April to June Form 3.pdf6 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold phase 2.pdf6 Aug 2025
Certificates of CA (Form 3)File: Phase II RERA Form -3 final.pdf22 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - phase 2.pdf20 Apr 2025
Certificates of CA (Form 3)File: PHASE II New - converted.pdf20 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - phase 2.pdf20 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold unsold March 25 - phase II.pdf20 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - phase 2.pdf20 Apr 2025
Declaration in FORM BFile: Form B affidavit -phase 2.pdf19 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20 -phase 2.pdf19 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21 -phase 2.pdf19 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22 -phase 2.pdf19 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Dec 24 -phase 2.pdf19 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20 phase 2.pdf2 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21 phase 2.pdf2 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 17-18 II.pdf2 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 18-19 II.pdf2 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 19-20 II.pdf2 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 20-21 II.pdf2 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 20-21 II.pdf2 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 21-22 II.pdf2 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 22-23 II.pdf2 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 23-24 II.pdf2 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Jun24 II.pdf2 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Sep 24 II.pdf2 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Dec24 II.pdf2 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22 Phase 2.pdf2 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A Form phase ii.pdf25 Feb 2025
Declaration in FORM BFile: Architectural form 1 - phase 2.pdf21 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architectural form 1 - phase 2.pdf21 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer form 2-phase 2.pdf21 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold phase 2.pdf21 Feb 2025
Declaration about Commencement CertificateFile: Format D-phase 2.pdf21 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT’S CERTIFICATE ANANDVAN PHASE II RERA form1.pdf4 Jan 2025
Certificates of CA (Form 3)File: Anandvan Phase 2 RERA as on April to June 2023_7_11zon 1.pdf4 Jan 2025
Certificates of CA (Form 3)File: Anandvan Phase 2 RERA as on July to Sept 2023_2_11zon 2.pdf4 Jan 2025
Certificates of CA (Form 3)File: Anandvan Phase 2 RERA as on October to Dec 2023_3_11zon 3.pdf4 Jan 2025
Certificates of CA (Form 3)File: Anandvan Phase 2 RERA as on 2023-2024_4_11zon 4.pdf4 Jan 2025
Certificates of CA (Form 3)File: Anandvan Phase 2 RERA as on April to June 2024_5_11zon 5.pdf4 Jan 2025
Certificates of CA (Form 3)File: Anandvan Phase 2 RERA as on July to Sept 2024_6_11zon 6.pdf4 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Phase 2 RERA Form2.pdf4 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA form5 Phase II .pdf4 Jan 2025
CERSAI detailsFile: Merged_Cersai Report_P2_19_03_2024.pdf24 Mar 2024
Proforma of Allotment letterFile: 4 Allotment Letter phase II.pdf24 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A_Bank Account Declaration_Phase 2.pdf24 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Anandvan Phase 2 Year 2017 to 2018.pdf18 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Anandvan Phase 2 Year 2018 to 2019.pdf18 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Anandvan Phase 2 Year 2019 to 2020.pdf18 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Anandvan Phase 2 Year 2020 to 2021.pdf18 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Anandvan Phase 2 Year 2021 to 2022.pdf18 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Anandvan Phase 2 Year 2022 to 2023.pdf18 Mar 2024
Details of encumbrances concerned to FinanceFile: 12 Encum_Phase 2.pdf12 Mar 2024
Details of encumbrances concerned to LegalFile: 12 Encum_Phase 2.pdf12 Mar 2024
Declaration about Commencement CertificateFile: 8 Format D_Phase 2.pdf12 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_18-23_P2-compressed.pdf12 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_18-19_P2.pdf12 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_19-20_P2.pdf12 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_20-21_P2.pdf12 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_21-22_P2.pdf12 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_22-23_P2.pdf12 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_22-23_P2.pdf12 Mar 2024
Certificates of CA (Form 3)File: Form 3_Anandvan_P2_18-19.pdf12 Mar 2024
Certificates of CA (Form 3)File: Form 3_Anandvan_P2_19-20.pdf12 Mar 2024
Certificates of CA (Form 3)File: Form 3_Anandvan_P2_20-21.pdf12 Mar 2024
Certificates of CA (Form 3)File: Form 3_Anandvan_P2_21-22.pdf12 Mar 2024
Certificates of CA (Form 3)File: Form 3_Anandvan_P2_22-23.pdf12 Mar 2024

How this compares with Satara

16%of Satara projects moved their completion datethis one moved by 23 months
35%of Satara registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep Anandvan Phase II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WAI1,100+ in Satara

Builder: Sahyadri Builders and Developers

Sahyadri Builders and Developers has 2 registrations on MahaRERA, including Anandvan Phase II and Sahyadri. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What are my rights if Anandvan Phase II is delayed beyond 30 Nov 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Anandvan Phase II?

The registered promoter entity is Sahyadri Builders and Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Anandvan Phase II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Anandvan Phase II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Anandvan Phase II?

The professionals named in the filing: Architect: Madhuri Sagar Zite. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Anandvan Phase II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Anandvan Phase II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Anandvan Phase II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.