ReraGenieLog inGet a buyer report

Home / Browse projects / Satara, Maharashtra / Anandvan Phase 1

Registered No litigation declared Residential / Group Housing project

Anandvan Phase 1

By SAHYADRI BUILDERS & DEVELOPERS

RG-MH-12001 · RERA P52700007067 · Last updated on MahaRERA portal: 11 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 23 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Nov 2026Possession promisedmoved 23 months from the original
7 of 11Construction stages donefurthest along: External plumbing and external plaster, 80%
0Complaints at MahaRERAon this registration
Jump to the 113 documents Report an error

Anandvan Phase 1 is a Residential / Group Housing project by SAHYADRI BUILDERS & DEVELOPERS in Satara, Maharashtra, registered with MahaRERA as P52700007067 on 17 Aug 2017. Possession is promised by 30 Nov 2026. The completion date has moved by 23 months from the original filing.

At a glance

Project

  • NameAnandvan Phase 1
  • TypeResidential / Group Housing
  • Location
    • WAI
    • Wai (Rural)
    • Satara
    • 412803
  • Pincode412803
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52700007067
  • ReraGenie IDRG-MH-12001

Builder

  • NameSAHYADRI BUILDERS & DEVELOPERS
  • Entity typePartnership
  • PartnersHEMALI YOGESH VARE, DATTATRAYA SHRIRANG VARE
  • Other registrations3 more →

Key dates

this monthRegisteredAug 2017First promiseDec 2024Revised toNov 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Aug 2017
  • Promised completion30 Nov 2026
  • Revised completionRevised to 30 Nov 2026 (originally 30 Dec 2024)
  • Buildings1 building record
  • Documents filed113 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Anandvan Phase 1NA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 80%.

Anandvan Phase 1: 86% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 11 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed137

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots137
Closed/Covered1
Open Space136

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,300 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI4663.0
Proposed, not sanctioned4,663 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchWai

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMadhuri Sagar Zite
PartnerRole in project
SAHYADRI BUILDERS & DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52700026057Dec 2024 → Nov 2026

Reason as filed by the promoter1. Shortage of Funds: o During the pandemic period, we faced significant challenges in securing the necessary loan approvals. o Additionally, no sales were made during this period, further limiting the availability of funds for project completion. 2. Labour Shortages: o Due to the COVID-19 lockdowns and restrictions, there was an acute shortage of labour, which severely impacted the progress of construction activities.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Nov 2026

Documents filed113

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 113 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 PHASE I - with sign.pdf11 May 2026
Form 2File: form 2 phase 1.pdf11 May 2026
Form 3File: Rera Phase 1 Jan to March 2026.pdf11 May 2026
Disclosure of Sold and Booked InventoryFile: Sold unslod phase 1.pdf11 May 2026
Form 1File: Form 1 - Aanandvan Phase 1 scan.pdf18 Feb 2026
Form 2File: Form 2 Phase I.pdf18 Feb 2026
Form 3File: Form 3 Phase I.pdf18 Feb 2026
Disclosure of Sold and Booked InventoryFile: sold unsold Phase I.pdf18 Feb 2026
Form 1File: F1 Sep 2025.pdf18 Nov 2025
Form 2File: F2 Sep2025.pdf18 Nov 2025
Form 3File: F3 Sep2025.pdf18 Nov 2025
Disclosure of Sold and Booked InventoryFile: Inventory Sep2025.pdf18 Nov 2025
Form 1File: Form 1 Phase I.pdf6 Aug 2025
Form 2File: Form 2 phase I.pdf6 Aug 2025
Form 3File: Phase 1 - April to June Form 3.pdf6 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold phase I.pdf6 Aug 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - phase I.pdf20 Apr 2025
Certificates of CA (Form 3)File: Phase I New - converted.pdf20 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - phase I.pdf20 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold unsold March 25 - phase I.pdf20 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - phase I.pdf20 Apr 2025
Declaration in FORM BFile: Form B affidavit -phase I.pdf19 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20 -phase I.pdf19 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21 phase I.pdf19 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2A 21-22 -phase I.pdf19 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Dec 24 -phase I.pdf19 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Sold Unsold 19-20.pdf2 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20.pdf2 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf2 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 17-18.pdf2 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 18-19.pdf2 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 19-20.pdf2 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 20-21.pdf2 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 21-22.pdf2 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 22-23.pdf2 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 23-24.pdf2 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Jun24.pdf2 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Dec24.pdf2 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf2 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A Phase I(2).pdf25 Feb 2025
Declaration in FORM BFile: affidavit.pdf21 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architectural form 1 -phase I.pdf21 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer form 2-phase 1.pdf21 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold phase I.pdf21 Feb 2025
Declaration about Commencement CertificateFile: format D-phase I.pdf21 Feb 2025
Declaration about Commencement CertificateFile: format D-phase I.pdf21 Feb 2025
Certificates of CA (Form 3)File: Anandvan Phase 1 RERA as on October to Dec 2024 7_1_11zon.pdf12 Feb 2025
Certificates of CA (Form 3)File: Anandvan Phase 1 RERA as on april to June 2024.pdf4 Jan 2025
Certificates of CA (Form 3)File: Anandvan Phase 1 RERA as on July to Sept 2024 6.pdf4 Jan 2025
Certificates of CA (Form 3)File: Anandvan Phase 1 RERA as on april to June 2024 5.pdf4 Jan 2025
Certificates of CA (Form 3)File: Anandvan Phase 1 RERA as on 20232024 4.pdf4 Jan 2025
Certificates of CA (Form 3)File: Anandvan Phase 1 RERA as on October to Dec 2023 3_11zon.pdf4 Jan 2025
Certificates of CA (Form 3)File: Anandvan Phase 1 RERA as on July to Sept 2023_11zon.pdf4 Jan 2025
Certificates of CA (Form 3)File: Anandvan Phase 1 RERA as on July to Sept 2023_11zon.pdf4 Jan 2025
Certificates of CA (Form 3)File: Anandvan Phase 1 RERA as on April to June 2024.pdf4 Jan 2025
Certificates of CA (Form 3)File: Anandvan Phase 1 RERA as on April to June 2024.pdf4 Jan 2025
Certificates of CA (Form 3)File: Anandvan Phase 1 RERA as on April to June 2024.pdf4 Jan 2025
Certificates of CA (Form 3)File: Anandvan Phase 1 RERA as on April to June 2024.pdf4 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 phase I.pdf4 Jan 2025
Proforma of Allotment letterFile: 4 Allotment Letter - phase I.pdf24 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A_Bank Account Declaration_Phase1.pdf24 Mar 2024
CERSAI detailsFile: Merged_Cersai Report_P1_18_03_2024.pdf19 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Anandvan Phase 1 Year 2017 to 2018.pdf18 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Anandvan Phase 1 Year 2018 to 2019.pdf18 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Anandvan Phase 1 Year 2019 to 2020.pdf18 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Anandvan Phase 1 Year 2020 to 2021.pdf18 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Anandvan Phase 1 Year 2021 to 2022.pdf18 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Anandvan Phase 1 Year 2022 to 2023.pdf18 Mar 2024
Details of encumbrances concerned to FinanceFile: 11 No Encum_Phase 1.pdf12 Mar 2024
Details of encumbrances concerned to LegalFile: 11 No Encum_Phase 1.pdf12 Mar 2024
Declaration about Commencement CertificateFile: 8 Format D_Phase 1.pdf12 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_18-23_P1-compressed.pdf12 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_18-19_P1.pdf12 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_19-20_P1.pdf12 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_20-21_P1.pdf12 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_21-22_P1.pdf12 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_22-23_P1.pdf12 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_22-23_P1.pdf12 Mar 2024
Certificates of CA (Form 3)File: Form 3_Anandvan_P1_18-19_Rev.pdf12 Mar 2024
Certificates of CA (Form 3)File: Form 3_Anandvan_P1_19-20_Rev.pdf12 Mar 2024

How this compares with Satara

16%of Satara projects moved their completion datethis one moved by 23 months
35%of Satara registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep Anandvan Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WAI1,100+ in Satara

2 kmAnandvan Phase 1Completed 2Lapsed / revoked 3Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: SAHYADRI BUILDERS & DEVELOPERS

SAHYADRI BUILDERS & DEVELOPERS has 4 registrations on MahaRERA, including Anandvan Phase 1 and SAHYADRI PARK PHASE 1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What are my rights if Anandvan Phase 1 is delayed beyond 30 Nov 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Anandvan Phase 1?

The registered promoter entity is SAHYADRI BUILDERS & DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Anandvan Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Anandvan Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Anandvan Phase 1?

The professionals named in the filing: Architect: Madhuri Sagar Zite. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Anandvan Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Anandvan Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Anandvan Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.