ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Anandtara Dyankunj

Registered No litigation declared Residential / Group Housing project

Anandtara Dyankunj

By Aanandtara properties

RG-MH-38536 · RERA P52100053321 · Last updated on MahaRERA portal: 14 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jul 2027Possession promisedno revision filed
2 of 22Construction stages doneacross 2 buildings; furthest along: Plinth, 95%
7 of 11Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

Anandtara Dyankunj is a Residential / Group Housing project by Aanandtara properties in Pune, Maharashtra, registered with MahaRERA as P52100053321 on 27 Oct 2023. Possession is promised by 1 Jul 2027. 4 of the 11 units on this registration are recorded sold or booked, and 2 of 22 construction stages are filed complete.

At a glance

Project

  • NameAnandtara Dyankunj
  • TypeResidential / Group Housing
  • Location
    • Manjari Bk road
    • Keshavnagar
    • Keshavnagar-Mundwa
    • Pune City
    • Pune
    • 411036
  • Pincode411036
  • RERA no.P52100053321
  • ReraGenie IDRG-MH-38536

Builder

  • NameAanandtara properties
  • Entity typePartnership
  • PartnersPRAVIN PRATAPRAO GAIKWAD, SACHIN PRATAPRAO GAIKWAD
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2023PromisedJul 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Oct 2023
  • Promised completion1 Jul 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed81 files

Current status

36%4 of 11 units booked
13.5%Work done, per cost certificate

Figures as on 14 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA43909
BNA22202

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 14 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Plinth, at 95%.

A32%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth95%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises2%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed35

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots35
Closed/Covered2
Open Space33
BuildingClosed/CoveredOpen SpaceTotal
A12526
B189

Land and ownership6

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area954 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Feb 2026
LandownerVillageDistrict
Pallavi Shantanu KodreKeshavnagar-MundwaPune
Kaiwalya Shantanu KodreKeshavnagar-MundwaPune
Rupali Dnyaneshwar KodreKeshavnagar-MundwaPune
Dipali Dyaneshwar KodreKeshavnagar-MundwaPune
Kalawati Dnyaneshwar KodreKeshavnagar-MundwaPune
Shantanu Dnyaneshwar KodreKeshavnagar-MundwaPune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI655.85
Proposed, not sanctioned656 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchIndian Bank Arora Tower East wing 1 st floor M G Road Pune 411001
Estimated costRs 4.63 cr
Cost incurredRs 62.32 lakh
Work done13.46%
BuildingWingEstimatedIncurred
ANARs 2.44 crRs 37.62 lakh
BNARs 1.10 crRs 12.35 lakh
-NARs 1.10 crRs 12.35 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGIRISH MANE
EngineerSuhas A Gaikwad
Chartered AccountantPCV AND COMPANY VIJAPURE PARAS
PartnerRole in project
Aanandtara properties-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 1 Jul 2027

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: final form 1.pdf14 May 2026
Withdrawal Update Form 1File: final form 1.pdf14 May 2026
Withdrawal Update Form 2File: form 2.pdf14 May 2026
Withdrawal Update Form 2File: form 2.pdf14 May 2026
Withdrawal Update Form 3File: RERA_FORM_3_DNYANKUNJ.pdf14 May 2026
Withdrawal Update Form 3File: form 3.pdf14 May 2026
Withdrawal Update Form 1File: final form 1.pdf30 Apr 2026
Withdrawal Update Form 1File: final form 1.pdf30 Apr 2026
Withdrawal Update Form 2File: form 2.pdf30 Apr 2026
Withdrawal Update Form 2File: form 2.pdf30 Apr 2026
Withdrawal Update Form 3File: RERA_FORM_3_DNYANKUNJ.pdf30 Apr 2026
Withdrawal Update Form 3File: RERA_FORM_3_DNYANKUNJ.pdf30 Apr 2026
Withdrawal Update Form 1File: form 1.pdf11 Feb 2026
Withdrawal Update Form 1File: form 1.pdf11 Feb 2026
Withdrawal Update Form 2File: Form_2___Dnyankunj__Dec_25.pdf11 Feb 2026
Withdrawal Update Form 2File: Form_2___Dnyankunj__Dec_25.pdf11 Feb 2026
Withdrawal Update Form 3File: FORM 3.pdf11 Feb 2026
Withdrawal Update Form 3File: FORM 3.pdf11 Feb 2026
Withdrawal Update Form 1File: form 1 final.pdf10 Feb 2026
Withdrawal Update Form 1File: form 1.pdf10 Feb 2026
Withdrawal Update Form 1File: form 1.pdf10 Feb 2026
Withdrawal Update Form 2File: form 2 vaibhav sir.pdf10 Feb 2026
Withdrawal Update Form 2File: FORM 2.pdf10 Feb 2026
Withdrawal Update Form 2File: FORM 2.pdf10 Feb 2026
Withdrawal Update Form 3File: form 3.pdf10 Feb 2026
Withdrawal Update Form 3File: FORM 3 FINAL_compressed.pdf10 Feb 2026
Withdrawal Update Form 3File: FORM 3 FINAL_compressed.pdf10 Feb 2026
Withdrawal Update Form 1File: form 1.pdf12 Nov 2025
Withdrawal Update Form 1File: form 1.pdf12 Nov 2025
Withdrawal Update Form 1File: form 1.pdf12 Nov 2025
Withdrawal Update Form 2File: FORM 2.pdf12 Nov 2025
Withdrawal Update Form 2File: FORM 2.pdf12 Nov 2025
Withdrawal Update Form 2File: FORM 2.pdf12 Nov 2025
Withdrawal Update Form 3File: form 3.pdf12 Nov 2025
Withdrawal Update Form 3File: form 3.pdf12 Nov 2025
Withdrawal Update Form 3File: form 3.pdf12 Nov 2025
Withdrawal Update Form 1File: form 1.pdf11 Nov 2025
Withdrawal Update Form 2File: FORM 2.pdf11 Nov 2025
Withdrawal Update Form 3File: form 3.pdf11 Nov 2025
Withdrawal Update Form 1File: form 1 final.pdf14 Aug 2025
Withdrawal Update Form 2File: form 2 vaibhav sir.pdf14 Aug 2025
Withdrawal Update Form 3File: form 3.pdf14 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf26 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf26 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 sept 2024.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 dec 2024.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jan 2025 form 3.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jan 2025 form 3.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 sept 2024.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 dec 2024.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf10 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf10 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM_2 (1).pdf10 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 June 2024_compressed.pdf10 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FOR_RERA-FORM-1-Rev.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf19 Apr 2024
Declaration in FORM BFile: FORM B PROMOTER COLOR.pdf26 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 OF 3.pdf20 Oct 2023
PAN CardFile: AnandtarA Prop pan.pdf16 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A pv.pdf9 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A sch.pdf6 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank declaration latest.pdf1 Sep 2023
Copy of the legal title reportFile: amended title report.pdf25 Aug 2023
Details of encumbrances concerned to FinanceFile: Ecumbrances declaration as to legal.pdf25 Aug 2023
Details of encumbrances concerned to LegalFile: Ecumbrances declaration as to legal.pdf25 Aug 2023
CERSAI detailsFile: report of cersai details.pdf25 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclorsure of interest in other real estate org.pdf25 Aug 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER PROFORMA.pdf25 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf11 Aug 2023
Declaration about Commencement CertificateFile: declaration abt commencement cert.pdf3 Aug 2023
Deviation Report with respect to Allotment letterFile: deviation report in allotment letter.pdf27 Jul 2023
Deviation Report with respect to model copy of AgreementFile: deviation report of agreement.pdf27 Jul 2023
Building plan approvalFile: Approved plan.pdf25 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: Approved plan.pdf25 Jul 2023
Layout approvalFile: Approved plan.pdf24 Jul 2023
Copy of the legal title reportFile: titile certificate.pdf24 Jul 2023
Copy of Layout Approval (in case of layout)File: Approved plan.pdf24 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: commencement certificate.pdf24 Jul 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
ANANDTARAS HARITARAP52100004122KONDHVE DHAWADE, PuneAug 2017CompletedDec 2019Registered original: Dec 2018Jun 2017

How this compares with Pune

36%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Anandtara Dyankunj on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Keshavnagar13,700+ in Pune

Builder: Aanandtara properties

Aanandtara properties has 1 registration on MahaRERA, including Anandtara Dyankunj. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Anandtara Dyankunj is delayed beyond 1 Jul 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Anandtara Dyankunj?

The registered promoter entity is Aanandtara properties, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Anandtara Dyankunj?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Anandtara Dyankunj?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Anandtara Dyankunj?

The professionals named in the filing: Architect: GIRISH MANE; Engineer: Suhas A Gaikwad; Chartered Accountant: PCV AND COMPANY VIJAPURE PARAS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Anandtara Dyankunj?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Anandtara Dyankunj. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Anandtara Dyankunj to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.