Completed No litigation declared Residential / Group Housing project

ANANDTARAS HARITARA

By ANANDTARA PROPERTIES

RG-MH-10074 · RERA P52100004122 · Last updated on MahaRERA portal: 22 Jun 2023

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2019Possession promisedregistration recorded completed
30 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 42 documents Report an error

ANANDTARAS HARITARA is a Residential / Group Housing project by ANANDTARA PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100004122 on 8 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2019. The completion date has moved by 12 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameANANDTARAS HARITARA
  • TypeResidential / Group Housing
  • Location
    • KONDHVE DHAWADE
    • Haveli
    • Pune
    • 411023
  • Pincode411023
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100004122
  • ReraGenie IDRG-MH-10074

Builder

  • NameANANDTARA PROPERTIES
  • Entity typePartnership
  • PartnersPRAVIN PRATAPRAO GAIKWAD, SACHIN PRATAPRAO GAIKWAD
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2017First promiseDec 2018Revised toDec 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on8 Aug 2017
  • Promised completion31 Dec 2019
  • Revised completionRevised to 31 Dec 2019 (originally 31 Dec 2018)
  • Buildings3 building records
  • Documents filed42 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A BuildingNA140000
B BuildingNA140000
C BuildingNA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 22 Jun 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

30 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

A Building91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B Building91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C Building91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities24

As on 22 Jun 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
Jogging TrackYes0%
One Passenger Lift and One Streture LiftYes100%
OWC PlantYes100%
Reflexology PathwayYes100%
Senior Citizen ParkYes100%
Gas BankYes100%
Children Play Area with EquipmentYes0%
CCTV Cameras in Main Entrance Gate and Building LobbyYes100%
AGREEMENT TO SALE of AlloteeYes100%

Parking filed67

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots67
Closed/Covered67
BuildingClosed/CoveredTotal
A Building2121
B Building2323
C Building2323

Land and ownership6

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,146 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
LandownerVillageDistrict
MR. RAMCHANDRA HARIBHAU SARPATIL AND OTHERSPune (M Corp.)Pune
MR. SUNIL SUDAM SARPATIL AND OTHERSPune (M Corp.)Pune
MR. BALASAHEB HARIBHAU SARPATIL AND OTHERSPune (M Corp.)Pune
MR. UTTAM HARIBHAU SARPATIL AND OTHERSPune (M Corp.)Pune
SMT. SUNANDA SAMBHAJI SARPATIL AND OTHERSPune (M Corp.)Pune
MRSS. PAVITRA PRADIP LIMBORE AND OTHERSPune (M Corp.)Pune

Approvals and building plan

Permissible FSI11290.71
Proposed, not sanctioned11,171 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKIRKEE BUSINESS CENTER AMBEKAR ROAD KIRKEE PUNE 411003

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/S. G. A. Bhilare Consultants Pvt. Ltd.
PartnerRole in project
ANANDTARA PROPERTIES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100002040Dec 2018 → Dec 2019

Reason as filed by the promoterwe required the increase area in the said project. Hence we have applied for the expansion FSI area in the authorised office i.e PMRDA, we have paid amount under this application through Challan. we are request to you please give extension for this project. As per old DC rule 25 % of the floor plate provide for refuse area. as per modify DC rules is the minimum 15 sq. mtr area is sufficient for refuse area. our project old refuse FSI area is "A" -Building 128 sq. mtr. "B" -Building 135 sq. mtr. and "C" -Building 168 sq. mtr. however now we required as per the Modify DC rules changes the FSI ar

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000064878Ganesh Giriya PoojariGanesh Ramchandra Sarpatil01/12/2020

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Nov 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Nov 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Nov 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 2 Aug 2021

Documents filed42

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: form 4.pdf22 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: RERA form 2 haritara.pdf19 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: RERA form 2 haritara.pdf19 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: RERA form 2 haritara.pdf19 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form No 5 of 2019.pdf14 Jun 2023
Declaration about Commencement CertificateFile: 1 declaration abt commencement certificate.pdf19 Apr 2023
Proforma of Agreement for saleFile: profarma of agr for sale 1.pdf13 Apr 2023
Deviation Report with respect to model copy of AgreementFile: model copy of Agr 1.pdf4 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: discloser of ac.pdf24 Mar 2023
Deviation Report with respect to Allotment letterFile: 1 deviation regarding allotment letter.pdf24 Mar 2023
Details of encumbrances concerned to FinanceFile: 1 b details of encumbrances concerned to legal.pdf18 Mar 2023
Details of encumbrances concerned to LegalFile: 1 b details of encumbrances concerned to legal.pdf18 Mar 2023
CERSAI detailsFile: CERSAI DETAILS.pdf18 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest in other real estate orgonization.pdf18 Mar 2023
OtherFile: Completion Certificate of Haritara.pdf6 Sep 2021
OtherFile: document(16).pdf6 Sep 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate of Haritara.pdf2 Aug 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Certificate of Haritara.pdf2 Aug 2021
Layout approvalFile: Revised Haritara Layout.pdf25 Nov 2019
Building plan approvalFile: Revised Haritara full Layout.pdf25 Nov 2019
Copy of Layout Approval (in case of layout)File: Revised Haritara Layout.pdf25 Nov 2019
Building Plan Approval (IOD)File: Revised Haritara full Layout.pdf25 Nov 2019
Commencement Certificates / NA Order for plotted developmentFile: Haritara CC 2019.pdf25 Nov 2019
Certificates of CA (Form 5)File: Haritara_Form__18-19.pdf4 Nov 2019
Certificates of CA (Form 5)File: Haritara Form 5.pdf3 Oct 2019
PAN CardFile: pan properties.pdf29 Dec 2018
Form 2AFile: Engineer Certificate.pdf29 Dec 2018
Certificates of CA (Form 5)File: Audit Report.pdf29 Dec 2018
Certificates of CA (Form 5)File: properties.pdf29 Dec 2018
Layout approvalFile: Layout plan.pdf29 Jul 2017
Building plan approvalFile: Building Plan 1.pdf29 Jul 2017
Copy of the legal title reportFile: Legal Title Report.pdf29 Jul 2017
Details of encumbrancesFile: Details of Encumbrances 001.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout plan.pdf29 Jul 2017
Building Plan Approval (IOD)File: Building Plan 1.pdf29 Jul 2017
Proforma of Allotment letterFile: AGREEMENT_RERA__Haritara_28-7-2017(1).pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf28 Jul 2017
Declaration in FORM BFile: Declaration Form B.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate.pdf28 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE.pdf28 Jul 2017
Certificates of CA (Form 3)File: Certificate of CA.pdf28 Jul 2017
Proforma of Allotment letterFile: ALLOTMENT LETER.pdf28 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ANANDTARAS HARITARA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KONDHVE DHAWADE13,700+ in Pune

2 kmANANDTARAS HARITARACompleted 5Lapsed / revoked 9Other 8Dot size: filed unitsN

Filed coordinates, straight-line distance. 22 registered projects within 2 km.

Builder: ANANDTARA PROPERTIES

ANANDTARA PROPERTIES has 2 registrations on MahaRERA, including ANANDTARAS HARITARA and Olive Orchard. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ANANDTARAS HARITARA is delayed beyond 31 Dec 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ANANDTARAS HARITARA?

The registered promoter entity is ANANDTARA PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ANANDTARAS HARITARA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ANANDTARAS HARITARA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ANANDTARAS HARITARA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ANANDTARAS HARITARA?

The professionals named in the filing: Architect: M/S. G. A. Bhilare Consultants Pvt. Ltd.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ANANDTARAS HARITARA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ANANDTARAS HARITARA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ANANDTARAS HARITARA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.