Home / Browse projects / Pune, Maharashtra / AMC AVENUE

Completed No litigation declared Commercial project

AMC AVENUE

By KAMDHENU SPACES LLP

RG-MH-27328 · RERA P52100033404 · Last updated on MahaRERA portal: 13 Jun 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

AMC AVENUE is a Commercial project by KAMDHENU SPACES LLP in Pune, Maharashtra, registered with MahaRERA as P52100033404 on 16 Feb 2022. The registration is recorded completed; possession was promised by 31 Dec 2024.

At a glance

Project

  • NameAMC AVENUE
  • TypeCommercial
  • Location
    • MOHMMADWADI
    • PUNE
    • MOHAMMADWADI
    • Haveli
    • 411060
  • Pincode411060
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100033404
  • ReraGenie IDRG-MH-27328

Builder

  • NameKAMDHENU SPACES LLP
  • Entity typeOthers
  • Named personsSAHIL M. MILANI, KASHISH N. MILANI
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredFeb 2022PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on16 Feb 2022
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed74 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AMC AVENUENA40000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Jun 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

AMC AVENUE: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 13 Jun 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,140 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
BRISKBAND ASSOCIATESPune (M Corp.)Pune

Approvals and building plan

Permissible FSI3273.79
Proposed, not sanctioned2,659 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK LTD SHETTY COMPLEX, GP 69 THERMAX CHOWK, SAMBHAJI NAGAR

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJAIDEEP S DESHPANDE
EngineerRakesh R Ghule
Chartered AccountantCA Abhishek Taparia
Chartered AccountantRadhika Khandelwal & Associates
Chartered AccountantGER & Associates
PartnerRole in project
KAMDHENU SPACES LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jan 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 13 Feb 2024

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 KS LLP 2223.pdf13 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf13 Feb 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate_compressed.pdf13 Feb 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 KSLLP_compressed.pdf13 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 AMC.pdf12 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf12 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Kamdhenu Spaces LLP Q3_compressed.pdf12 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2_compressed.pdf20 Oct 2023
Building plan approvalFile: HPSC0924_compressed.pdf18 Jul 2023
Building plan approvalFile: HPSC0925_compressed.pdf18 Jul 2023
Building plan approvalFile: HPSC0926_compressed.pdf18 Jul 2023
Building plan approvalFile: HPSC0927_compressed.pdf18 Jul 2023
Building plan approvalFile: HPSC0928_compressed.pdf18 Jul 2023
Details of encumbrances concerned to FinanceFile: Emcumbrances Legal.pdf18 Jul 2023
Details of encumbrances concerned to LegalFile: Emcumbrances Legal.pdf18 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: HPSC0924_compressed.pdf18 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: HPSC0925_compressed.pdf18 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: HPSC0926_compressed.pdf18 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: HPSC0927_compressed.pdf18 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: HPSC0928_compressed.pdf18 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate compressed.pdf18 Jul 2023
Declaration about Commencement CertificateFile: Declaration of CC.pdf18 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_compressed.pdf18 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed.pdf18 Jul 2023
Disclosure of sold/ booked inventoryFile: Promoters Disclosure.pdf18 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 AMC_compressed.pdf18 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Final_compressed.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: Disclosure Final.pdf20 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final_compressed (1).pdf20 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_compressed.pdf8 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final_compressed.pdf21 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate_compressed.pdf20 Jan 2023
Disclosure of sold/ booked inventoryFile: Promoters Disclosure.pdf20 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1.pdf9 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Q2.pdf9 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Q1.pdf9 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Q2.pdf9 Nov 2022
Disclosure of sold/ booked inventoryFile: Disclosure Q1.pdf9 Nov 2022
Disclosure of sold/ booked inventoryFile: Disclosure Q2.pdf9 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf9 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Q2_compressed.pdf9 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate.pdf16 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf16 Apr 2022
Disclosure of sold/ booked inventoryFile: Promoter's Disclosure.pdf16 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Cert KSLLP Q4 2021-22_F.pdf16 Apr 2022
Proforma of Allotment letterFile: Draft Agreement - KS LLP.pdf4 Feb 2022
Layout approvalFile: 984.pdf20 Jan 2022
Building plan approvalFile: 983.pdf20 Jan 2022
Building plan approvalFile: 985.pdf20 Jan 2022
Building plan approvalFile: 985.pdf20 Jan 2022
Building plan approvalFile: 986.pdf20 Jan 2022
Building plan approvalFile: 987.pdf20 Jan 2022
Building plan approvalFile: 988.pdf20 Jan 2022
PAN CardFile: PAN.pdf20 Jan 2022
Copy of the legal title reportFile: Mohammdwadi Title 13-1-2022_compressed.pdf20 Jan 2022
Copy of the legal title reportFile: Mohammdwadi Title Flow _compressed_compressed.pdf20 Jan 2022
Details of encumbrancesFile: Self Declaration - Encumbrances.pdf20 Jan 2022
Copy of Layout Approval (in case of layout)File: 984.pdf20 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: 983.pdf20 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: 985.pdf20 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: 985.pdf20 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: 986.pdf20 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: 987.pdf20 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: 988.pdf20 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_1.pdf20 Jan 2022
Declaration about Commencement CertificateFile: Declaration - Commencement Certificate.pdf20 Jan 2022
Declaration in FORM BFile: Promoter.pdf20 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - New_compressed.pdf20 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate.pdf20 Jan 2022
CERSAI detailsFile: CERSAI_Search_Report_200228354948_For_Asset_Based_Search_19_01_2022_12_13_36_954a.pdf20 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf20 Jan 2022
Proforma of Allotment letterFile: Allotment Letter.pdf20 Jan 2022

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AMC AVENUE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUNE13,700+ in Pune

2 kmAMC AVENUECompleted 1Lapsed / revoked 4Other 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 11 registered projects within 2 km.

Builder: KAMDHENU SPACES LLP

KAMDHENU SPACES LLP has 2 registrations on MahaRERA, including AMC AVENUE and AUM AANGAN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if AMC AVENUE is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AMC AVENUE?

The registered promoter entity is KAMDHENU SPACES LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AMC AVENUE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AMC AVENUE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AMC AVENUE?

The professionals named in the filing: Architect: JAIDEEP S DESHPANDE; Engineer: Rakesh R Ghule; Chartered Accountant: CA Abhishek Taparia; Chartered Accountant: Radhika Khandelwal & Associates; Chartered Accountant: GER & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AMC AVENUE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AMC AVENUE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AMC AVENUE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.