Home / Browse projects / Pune, Maharashtra / AMBER
AMBER
RG-MH-03460 · RERA P52100019905 · Last updated on MahaRERA portal: 18 Apr 2023
Source: official MahaRERA filing
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AMBER is a Others project by Saffron Developers in Pune, Maharashtra, registered with MahaRERA as P52100019905 on 13 Mar 2019. The registration is recorded completed; possession was promised by 30 Mar 2023. 1 complaint is on record with the regulator.
At a glance
Project
- NameAMBER
- TypeOthers
- Location
- Baner Sus Road
- Baner
- Sus
- Mulshi
- Pune
- 411021
- Pincode411021
- RERA no.P52100019905
- ReraGenie IDRG-MH-03460
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on13 Mar 2019
- Promised completion30 Mar 2023
- Revised completionNone
- Buildings2 building records
- Documents filed101 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A wing | NA | 17 | 0 | 0 | 0 | 0 |
| B Wing | NA | 17 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 18 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.
A wing91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B Wing91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities17
As on 18 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 30% |
| Open Parking | No | Not applicable |
| Club House | Yes | 0% |
| Children Play area | Yes | 0% |
Parking filed66
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| A wing | 33 | 33 |
| B Wing | 33 | 33 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Saffron Developers | Pashan | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Direcection Next |
| Partner | Role in project |
|---|---|
| Saffron Developers | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000085378 | Durgesh Sunil Shalgar | Yashwant Shankarrao Nimhan | 25/03/2021 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 Mar 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Aug 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Aug 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Aug 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 3 Mar 2023
Documents filed101
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Architect Certificate.pdf | 18 Apr 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate_compressed.pdf | 3 Mar 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: revised oc.pdf | 3 Mar 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate.pdf | 3 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Emgineer Certificate 30 June 2022_compressed.pdf | 16 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A FY 2021-22.pdf | 15 Feb 2023 |
| Certificates of CA (Form 3)File: Form 3 CA Certificate 30 June 2022_compressed.pdf | 15 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_2021-22.pdf | 15 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 13 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory_compressed.pdf | 13 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other real estate organization.pdf | 13 Feb 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Disclosure about seperate bank account.pdf | 13 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 30 June 2022.pdf | 11 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 30 Sept 2022.pdf | 11 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 30 Decmber 2022.pdf | 11 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf | 16 May 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer Certificate.pdf | 16 May 2022 |
| Engineers Certificate on Quality Assurance (Form 2A)File: SaffronAMber_Form2A_May132022 (1).pdf | 16 May 2022 |
| Disclosure of sold/ booked inventoryFile: Inventory Declaration as on 31mar22.pdf | 16 May 2022 |
| Certificates of CA (Form 3)File: Form 3 31032022 scanned.pdf | 16 May 2022 |
| Certificates of CA (Form 3)File: Form 3_compressed.pdf | 7 Feb 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect certificate_compressed.pdf | 4 Feb 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate_compressed.pdf | 4 Feb 2022 |
| Engineers Certificate on Quality Assurance (Form 2A)File: Form 2 A_compressed.pdf | 4 Feb 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory_compressed.pdf | 4 Feb 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form No 5 Saffron Developers Scanned.pdf | 28 Dec 2021 |
| Disclosure of sold/ booked inventoryFile: Inventory Declaration as on 27th Oct 2021.pdf | 28 Oct 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate 30092021.pdf | 26 Oct 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer's Certificate 30092021.pdf | 26 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A)File: Form 2A Engineer's Certificate 30092021.pdf | 26 Oct 2021 |
| Certificates of CA (Form 3)File: Form 3 CA Certificate 30092021.pdf | 26 Oct 2021 |
| Declaration about Commencement CertificateFile: Declaration about commencement Format D.pdf | 26 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Declaration about Form 5.pdf | 26 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 31032021 2A.pdf | 9 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Signed Form 1 30062021.pdf | 12 Jul 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 30062021.pdf | 12 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A)File: Form 2A 30062021.pdf | 12 Jul 2021 |
| Certificates of CA (Form 3)File: Scan Form 3Amber30062021.pdf | 12 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: Inventory Declaration 15062021 Scan.pdf | 15 Jun 2021 |
| Declaration in FORM BFile: Affidavit Form B- Safrron Developers.pdf | 13 May 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Saffron Form 1.pdf | 29 Apr 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Saffron Form 1.pdf | 29 Apr 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form-2.pdf | 29 Apr 2021 |
| Engineers Certificate on Quality Assurance (Form 2A)File: form- 2 A.pdf | 29 Apr 2021 |
| Certificates of CA (Form 3)File: Scanned Form 3_Amber_31032021.pdf | 29 Apr 2021 |
| Certificates of CA (Form 3)File: Scanned Form 3_Amber_31032021.pdf | 29 Apr 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Architect Certificate.pdf | 21 Jan 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engineer's Certificate.pdf | 21 Jan 2021 |
| Engineers Certificate on Quality Assurance (Form 2A)File: Form 2A - Quality assurance Certificate.pdf | 21 Jan 2021 |
| Certificates of CA (Form 3)File: Form 3 - CA Cirtificate.pdf | 21 Jan 2021 |
| Certificates of CA (Form 3)File: Form 3 - CA Certificate.pdf | 21 Jan 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Sign 201920 Upload.pdf | 2 Dec 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf | 5 Oct 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2_Engg Certificate.pdf | 5 Oct 2020 |
| Engineers Certificate on Quality Assurance (Form 2A)File: Form2A_QualityCertificate.pdf | 5 Oct 2020 |
| Certificates of CA (Form 3)File: Signed Form 3 30092020.pdf | 5 Oct 2020 |
| Proforma of Allotment letterFile: New Agreement draft Saffron Developers 2020.pdf | 31 Aug 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_March 20.pdf | 13 Jul 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ June 20.pdf | 13 Jul 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer certificate_March 20_.pdf | 13 Jul 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate_June 20_.pdf | 13 Jul 2020 |
| Engineers Certificate on Quality Assurance (Form 2A)File: Form 2 A Quality assurance certificate_March 20_.pdf | 13 Jul 2020 |
| Engineers Certificate on Quality Assurance (Form 2A)File: Form 2 A Quality assurance certificate_June 20_.pdf | 13 Jul 2020 |
| Certificates of CA (Form 3)File: Form-3_March 20_.pdf | 13 Jul 2020 |
| Certificates of CA (Form 3)File: Form-3_June 20_.pdf | 13 Jul 2020 |
| Details of Restarting of Construction work post lockdownFile: self declaration post covid construction.pdf | 29 Jun 2020 |
| Details of encumbrancesFile: Encumbrance Mortgage Deed Combined.pdf | 1 Feb 2020 |
| Declaration in FORM BFile: Form B loan updated.pdf | 1 Feb 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31122019.pdf | 1 Feb 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: From 2 31122019.pdf | 1 Feb 2020 |
| Engineers Certificate on Quality Assurance (Form 2A)File: From 2A 31122019.pdf | 1 Feb 2020 |
| Certificates of CA (Form 3)File: Form 3 CA 31122019.pdf | 1 Feb 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engg certificate 30092019.pdf | 13 Nov 2019 |
| Proforma of Allotment letterFile: new agreement draft.pdf | 13 Nov 2019 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Signed.pdf | 8 Nov 2019 |
| Declaration in FORM BFile: Form B Revised.pdf | 2 Nov 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 300919.pdf | 2 Nov 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Eng Certificate revised RERA.pdf | 2 Nov 2019 |
| Certificates of CA (Form 3)File: Form 3 C A certificate_RERA.pdf | 2 Nov 2019 |
| Engineers Certificate on Quality Assurance (Form 2A)File: Form 2 A 30062019.pdf | 6 Oct 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 8 other registrations, which the RERA portal never shows together
- All 101 filed documents as one ZIP, foldered, with a manifest
Keep AMBER on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Baner13,700+ in Pune
NYATI EQUINOX I
MIHIR HOMES ENTERPRISE LLP
Puraniks Abitante Fiore, Phase 2A
Puranik Buildcon Private Limited
Puraniks Abitante Fiore, Phase 2B
Puranik Buildcon Private Limited
cloud 51
OREE REALITY PVT LTD
CIELO BY VTP LUXE
DELAS REALCON LLP
Puraniks Abitante Fiore Phase 2C1
Puranik Buildcon Private Limited
Builder: Saffron Developers
SAFFRON DEVELOPERS has 9 registrations on MahaRERA, including SILVER OAK PLAZA and SILVER CREST. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if AMBER is delayed beyond 30 Mar 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AMBER?
The registered promoter entity is Saffron Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AMBER?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against AMBER?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for AMBER?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AMBER?
The professionals named in the filing: Architect: Direcection Next. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AMBER?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback