Home / Browse projects / Pune, Maharashtra / AMARA Quadream Residences Phase 2 Bldg A and B
AMARA Quadream Residences Phase 2 Bldg A and B
RG-MH-35269 · RERA P52100050474 · Last updated on MahaRERA portal: 1 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 7 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AMARA Quadream Residences Phase 2 Bldg A and B is a Residential / Group Housing project by GAGAN SHARDA DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100050474 on 17 Apr 2023. Possession was promised by 31 Mar 2026 and is now 7 months past that date. 5 of the 48 units on this registration are recorded sold or booked, and 1 of 22 construction stages are filed complete.
At a glance
Project
- NameAMARA Quadream Residences Phase 2 Bldg A and B
- TypeResidential / Group Housing
- Location
- 24/2A/6
- 24/2/1/1
- Undri
- Haveli
- Pune
- 411060
- Pincode411060
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100050474
- ReraGenie IDRG-MH-35269
Builder
- NameGAGAN SHARDA DEVELOPERS
- Entity typePartnership
- PartnersAJAY SHIVNARAYAN GUPTA, AMIT SHIVNARAYAN GUPTA, JAGDISH TIKARAM GOYAL
- Other registrations1 more →
- Completed1 of 2
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on17 Apr 2023
- Promised completion31 Mar 2026
- Revised completionNone
- Buildings2 building records
- Documents filed80 files
Current status
Figures as on 1 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing A | NA | 6 | 6 | 24 | 0 | 24 |
| Wing B | NA | 6 | 6 | 24 | 0 | 24 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 1 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.
Wing A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing B9%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 1 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 85% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 85% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 85% |
| Street Lighting | Yes | 85% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed34
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| Wing A | 17 | 17 |
| Wing B | 17 | 17 |
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Gurmukh J Sukhwani | Pimpri Chinchawad (M Corp.) | Pune |
| Basant T Sukhwani | Pimpri Chinchawad (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Wing A | NA | Rs 3.32 cr | - |
| Wing B | NA | Rs 3.32 cr | Rs 74,167 |
| - | NA | Rs 1.29 cr | Rs 1.14 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Cubic Architects Associates |
| Engineer | Bajirao Vitthal Mahadik Mahadik |
| Chartered Accountant | Milani and Associates |
| Chartered Accountant | Patel & Sharma |
| Chartered Accountant | ASAK & Co |
| Chartered Accountant | Agarwal Sarawgi & Associates |
| Partner | Role in project |
|---|---|
| GAGAN SHARDA DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 10 Feb 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Feb 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Feb 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed80
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Archt Cert Q4 25-26.pdf | 1 May 2026 |
| Withdrawal Update Form 2File: Form 2 Engi Cert Q4 25-26.pdf | 1 May 2026 |
| Withdrawal Update Form 3File: Form 3 CA Cert Q4 25-26.pdf | 1 May 2026 |
| Withdrawal Update Form 1File: Form 1 Archt Cert Q3 FY 2025-26.pdf | 19 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Engineers Cert Q3 FY 2025-26.pdf | 19 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 CA Cert Q3 FY 2025-26.pdf | 19 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 Arch Certificate Q2 2025-26.pdf | 13 Oct 2025 |
| Withdrawal Update Form 2File: Form 2 Engi Certificate Q2 2025-26.pdf | 13 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 CA Certificate Q2 2025-26.pdf | 13 Oct 2025 |
| Form 2A (FY 2024-2025)File: Form 2A Engineer Certitificate 310325.pdf | 29 Sep 2025 |
| Form 5 (FY 2023-2024)File: Form 5 signed by client.pdf | 19 Sep 2025 |
| Form 5 (FY 2024-2025)File: Form 5 signed.pdf | 19 Sep 2025 |
| Withdrawal Update Form 1File: Form 1 Arch Cert.pdf | 31 Jul 2025 |
| Withdrawal Update Form 2File: Form 2 Engi Cert.pdf | 31 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 CA Cert.pdf | 31 Jul 2025 |
| Withdrawal Update Form 1File: Form 1 Arch Cert.pdf | 19 Jul 2025 |
| Withdrawal Update Form 2File: Form 2 Engi Cert.pdf | 19 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 CA Cert.pdf | 19 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Cert Q4 2425.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Cert Q4 2425.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Cert Q4 2425.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory details Q4 2425.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Details for Q3 2425 updated -edited.pdf | 17 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Certificate Q3 2425.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Q3 2425.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engi Certificate Q3 2425.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Details for Q3 2425.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Certificate Q2 2425.pdf | 8 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Q2 2425.pdf | 8 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Q2 2425.pdf | 8 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Invertory Q2 2425.pdf | 8 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 signed by client.pdf | 16 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Certificate Q1 2024-25.pdf | 19 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Certificate Q1 2024-25.pdf | 18 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Bldg Q1 2024-25.pdf | 18 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Certificate Q1 2024-25.pdf | 18 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 26 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Q4.pdf | 26 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Details Q4.pdf | 26 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Q4.pdf | 26 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Certificate Q3 2324.pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Q3 2324 Updated.pdf | 20 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory Q3 2324.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Certificate Q3 2324.pdf | 20 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 for Q1 2324.pdf | 12 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 for Q2 2324.pdf | 12 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 for Q1 2324.pdf | 12 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 for Q2 2324.pdf | 12 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory Q1 2324.pdf | 12 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory Q2 2324.pdf | 12 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 300623_Compressed.pdf | 12 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_30-09-2023_Compressed.pdf | 12 Dec 2023 |
| Deviation Report with respect to Allotment letterFile: Dated Deviation Allotment Letter.pdf | 27 Mar 2023 |
| Deviation Report with respect to model copy of AgreementFile: Dated Deviation Agreement for Sale.pdf | 27 Mar 2023 |
| Proforma of Agreement for saleFile: Model_AFS_in_English_CASACHIN_11032023-REVISED.pdf | 11 Mar 2023 |
| Proforma of Allotment letterFile: Model Allotment Letter.pdf | 24 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: Declaration of Encumbrances (Finance).pdf | 23 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: Declaration of Encumbrances (Legal).pdf | 23 Feb 2023 |
| Details of encumbrances concerned to LegalFile: Declaration of Encumbrances (Finance).pdf | 23 Feb 2023 |
| Details of encumbrances concerned to LegalFile: Declaration of Encumbrances (Legal).pdf | 23 Feb 2023 |
| Declaration about Commencement CertificateFile: Declaration about CC.pdf | 23 Feb 2023 |
| Declaration in FORM BFile: Form B GSD.pdf | 23 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf | 23 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.pdf | 23 Feb 2023 |
| CERSAI detailsFile: Cersai Report.pdf | 23 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf | 23 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annx A Ajay SG.pdf | 23 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annx A Amit SG.pdf | 23 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annx A JTG.pdf | 23 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annx A MJG.pdf | 23 Feb 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration for Seprate Bank Account.pdf | 23 Feb 2023 |
| Layout approvalFile: 1-4 Layout Approval.pdf | 10 Feb 2023 |
| Building plan approvalFile: 2-4 Building Plan Wing A.pdf | 10 Feb 2023 |
| Building plan approvalFile: 3-4 Building Plan Wing B.pdf | 10 Feb 2023 |
| PAN CardFile: PAN.pdf | 10 Feb 2023 |
| Copy of the legal title reportFile: Search Title Report.pdf | 10 Feb 2023 |
| Copy of Layout Approval (in case of layout)File: 1-4 Layout Approval.pdf | 10 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 2-4 Building Plan Wing A.pdf | 10 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 3-4 Building Plan Wing B.pdf | 10 Feb 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 10 Feb 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 80 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep AMARA Quadream Residences Phase 2 Bldg A and on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Undri13,700+ in Pune
Filed coordinates, straight-line distance. 427 registered projects within 2 km.
THE SPECTRUM
SHRIRAM PROPERTIES LIMITED
GANGA MILLENNIA UNDRI BUILDING J,K,L,M AND N
GOEL GANGA INDIA PVT LTD
NYATI ESTEBAN II
NYATI REALTORS LLP
Lodha Pune NIBM Project
Lodha Developers Limited
KHUSH VISTA
Elated Housing LLP
The Atrium
Arhumashtika Life Spaces
Builder: GAGAN SHARDA DEVELOPERS
GAGAN SHARDA DEVELOPERS has 2 registrations on MahaRERA, including Quadream Residences Phase 1 Bldg C D and Common Amenities and AMARA Quadream Residences Phase 2 Bldg A and B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that AMARA Quadream Residences Phase 2 Bldg A and B shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if AMARA Quadream Residences Phase 2 Bldg A and B is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AMARA Quadream Residences Phase 2 Bldg A and B?
The registered promoter entity is GAGAN SHARDA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AMARA Quadream Residences Phase 2 Bldg A and B?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for AMARA Quadream Residences Phase 2 Bldg A and B?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AMARA Quadream Residences Phase 2 Bldg A and B?
The professionals named in the filing: Architect: Cubic Architects Associates; Engineer: Bajirao Vitthal Mahadik Mahadik; Chartered Accountant: Milani and Associates; Chartered Accountant: Patel & Sharma; Chartered Accountant: ASAK & Co; Chartered Accountant: Agarwal Sarawgi & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AMARA Quadream Residences Phase 2 Bldg A and B?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback