ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / AMAR OASIS

Registered No litigation declared Residential / Group Housing project

AMAR OASIS

By ACCENT PROJECT DEVELOPERS LLP

RG-MH-05698 · RERA P52100056262 · Last updated on MahaRERA portal: 7 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2029Possession promisedno revision filed
4 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 92%
10 of 12Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

AMAR OASIS is a Residential / Group Housing project by ACCENT PROJECT DEVELOPERS LLP in Pune, Maharashtra, registered with MahaRERA as P52100056262 on 22 May 2024. Possession is promised by 31 Mar 2029. 2 of the 12 units on this registration are recorded sold or booked, and 4 of 22 construction stages are filed complete.

At a glance

Project

  • NameAMAR OASIS
  • TypeResidential / Group Housing
  • Location
    • Off Baner Pashan Link Road
    • Pashan
    • Haveli
    • Pune
    • 411021
  • Pincode411021
  • RERA no.P52100056262
  • ReraGenie IDRG-MH-05698

Builder

  • NameACCENT PROJECT DEVELOPERS LLP
  • Entity typePartnership
  • PartnersRamkrishna Gunvantrao Deshpande, Suresh Thakchand Ghodekar

Key dates

this monthRegisteredMay 2024PromisedMar 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 May 2024
  • Promised completion31 Mar 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed85 files

Current status

17%2 of 12 units booked
22.8%Work done, per cost certificate

Figures as on 7 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA42202
WING BNA131110010

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 7 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 92%.

WING A41%
ActivityProgress
Excavation92%
Basement (if any)80%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure62%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises4%
Sanitary Fittings within the flats / premises12%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B41%
ActivityProgress
Excavation92%
Basement (if any)80%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure62%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises12%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 7 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed34

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots34
Closed/Covered17
Open Space17
BuildingClosed/CoveredOpen SpaceTotal
WING A5510
WING B121224

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,453 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Feb 2026
LandownerVillageDistrict
Rekha Eknath Khobragade & 19 othersPune (M Corp.)Pune

Approvals and building plan

Permissible FSI9550.65
Proposed, not sanctioned4,317 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch893/6, Lohiya Jain House, Bhandarkar Road, Pune-411004
Estimated costRs 42.73 cr
Cost incurredRs 9.75 cr
Work done22.82%
BuildingWingEstimatedIncurred
WING ANARs 24.54 crRs 6.30 cr
WING BNARs 12.27 crRs 3.14 cr
-NARs 5.92 crRs 30.98 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDESIGN 11
EngineerGAURAO PATIL
EngineerJW Consultants LLP
Chartered AccountantP.S. ATHAVALE & CO
Chartered AccountantApte & Co
PartnerRole in project
ACCENT PROJECT DEVELOPERS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jan 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2029

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: Form 2A - Amar Oasis 2024-25.pdf7 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A - Amar Oasis 2025-26.pdf7 Jul 2026
Withdrawal Update Form 1File: FORM 1-ARCHITECTS CERT_AO_Mar 26.pdf16 Jun 2026
Withdrawal Update Form 2File: FORM 2-ENGINEERS CERT_AO_Mar 26.pdf16 Jun 2026
Withdrawal Update Form 3File: Amar Oasis-Form3-March 2026.pdf16 Jun 2026
Withdrawal Update Form 1File: FORM 1-ARCHITECTS CERT_AO_Mar 26.pdf20 Apr 2026
Withdrawal Update Form 2File: FORM 2-ENGINEERS CERT_AO_Mar 26.pdf20 Apr 2026
Withdrawal Update Form 3File: AMAR OASIS - FORM 3_ Dec 2025.pdf20 Apr 2026
Withdrawal Update Form 1File: FORM 1-ARCHITECT CERT_AO_Dec 25.pdf4 Feb 2026
Withdrawal Update Form 2File: FORM 2 - ENGINEER CERT_AO_Dec 25.pdf4 Feb 2026
Withdrawal Update Form 3File: AMAR OASIS - FORM 3_ Dec 2025.pdf4 Feb 2026
Withdrawal Update Form 1File: FORM 1-ARCHITECT CERT_AO_Dec 25.pdf27 Jan 2026
Withdrawal Update Form 2File: FORM 2 - ENGINEER CERT_AO_Dec 25.pdf27 Jan 2026
Withdrawal Update Form 3File: AMAR OASIS - FORM 3_ 15 Sept 2025.pdf27 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 - Amar Oasis 2024-25.pdf4 Dec 2025
Withdrawal Update Form 1File: FORM 1-ARCHITECTu0027S CERT_AO_Sept 25.pdf4 Oct 2025
Withdrawal Update Form 2File: FORM 2 - ENGINEERu0027S CERT_AO_Sept 25.pdf4 Oct 2025
Withdrawal Update Form 3File: AMAR OASIS - FORM 3_ 15 Sept 2025.pdf4 Oct 2025
Withdrawal Update Form 1File: FORM 1-ARCHITECTu0027S CERT_AO_Mar 25.pdf30 Sep 2025
Withdrawal Update Form 1File: FORM 1-ARCHITECTu0027S CERT_AO_June 25.pdf30 Sep 2025
Withdrawal Update Form 2File: FORM 2 - ENGINEERS CERTIFICATE_AO_Mar 25.pdf30 Sep 2025
Withdrawal Update Form 2File: FORM 2 - ENGINEERu0027S CERT_AO_June 25.pdf30 Sep 2025
Withdrawal Update Form 3File: AMAR OASIS - FORM 3_ MAR 2025.pdf30 Sep 2025
Withdrawal Update Form 3File: FORM 3 Amar Oasis June 2025.pdf30 Sep 2025
Withdrawal Update Form 1File: FORM 1-ARCHITECTu0027S CERT_AO_June 25.pdf18 Jul 2025
Withdrawal Update Form 1File: FORM 1-ARCHITECTu0027S CERT_AO_June 25.pdf18 Jul 2025
Withdrawal Update Form 1File: FORM 1-ARCHITECTu0027S CERT_AO_June 25.pdf18 Jul 2025
Withdrawal Update Form 2File: FORM 2 - ENGINEERu0027S CERT_AO_June 25.pdf18 Jul 2025
Withdrawal Update Form 2File: FORM 2 - ENGINEERu0027S CERT_AO_June 25.pdf18 Jul 2025
Withdrawal Update Form 2File: FORM 2 - ENGINEERu0027S CERT_AO_June 25.pdf18 Jul 2025
Withdrawal Update Form 3File: Form 3 CA Certificate_300424.pdf18 Jul 2025
Withdrawal Update Form 3File: Form 3 CA Certificate_300424.pdf18 Jul 2025
Withdrawal Update Form 3File: Form 3 CA Certificate_300424.pdf18 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-ARCHITECT'S CERT_AO_Mar 25.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - ENGINEERS CERTIFICATE.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: AO - Sold Unsold Units _Mar 25.pdf17 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A - QUALITY ASSURANCE CERT_24-25.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 01 OASIS - FORM 3_ UPTO DEC 2024.pdf28 Mar 2025
Copy of the legal title reportFile: TITLE REPORT SUPPLEMENTARY -OASIS.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 01 OASIS - FORM 3_ UPTO SEPT 2024.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-ARCHITECT'S CERT_AO_Dec 24.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-ENGINEER'S CERT_AO_Dec 24.pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: AO - Disclosure of Sold Unsold Units _Dec 24.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 01 OASIS - FORM 3_ UPTO SEPT 2024.pdf25 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARCHITECT'S CERTIFICATE.pdf17 Oct 2024
Building plan approvalFile: AO - Sanction Plans.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - ENGINEER'S CERTIFICATE.pdf10 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: AO - Sanction Plans.pdf10 Oct 2024
Disclosure of sold/ booked inventoryFile: AO - Disclosure of Sold Unsold Units _Sept 24.pdf10 Oct 2024
Declaration about Commencement CertificateFile: Declaration for Commencement Cert.pdf5 Aug 2024
Building plan approvalFile: AO - Sanction Plans.pdf3 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: AO - Sanction Plans.pdf3 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: AO - Commencement Cert.pdf3 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARCHITECT'S CERTIFICATE.pdf3 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - ENGINEER'S CERTIFICATE.pdf3 Aug 2024
Disclosure of sold/ booked inventoryFile: AO - Disclosure of Sold And Unsold Units _June 24.pdf3 Aug 2024
Disclosure of sold/ booked inventoryFile: AO - Disclosure of Sold And Unsold Units _July 24.pdf3 Aug 2024
Other - LegalFile: FORM B - AFFIDAVIT PROMOTERS.pdf14 May 2024
Other - LegalFile: AO - Deed of Conveyance.pdf13 May 2024
Other - LegalFile: AO - Power of Attorney.pdf13 May 2024
Other - LegalFile: Form B Affidavit.pdf13 May 2024
Copy of the legal title reportFile: TITLE AND SERACH REPORT.pdf7 May 2024
Proforma of Agreement for saleFile: Agreement to Sale Draft_070524.pdf7 May 2024
Layout approvalFile: Building Plan.pdf30 Apr 2024
Copy of Layout Approval (in case of layout)File: Building Plan.pdf30 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate_300424.pdf30 Apr 2024
Other - TechnicalFile: Annexure A Order no 50.pdf30 Apr 2024
Other - TechnicalFile: EMAIL FROM PMC TO MAHARERA.pdf30 Apr 2024
Home Buyer /Allottee Grievance Redressal CellFile: GRIVIANCE CELL.pdf27 Apr 2024
Building plan approvalFile: Building Plan.pdf25 Apr 2024
PAN CardFile: Accent - PAN.pdf25 Apr 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Cert Finance and Legal.pdf25 Apr 2024
Details of encumbrances concerned to LegalFile: Encumbrance Cert Finance and Legal.pdf25 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan.pdf25 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE BUILDING.pdf25 Apr 2024
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf25 Apr 2024
Declaration in FORM BFile: Form B Affidavit.pdf25 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf25 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf25 Apr 2024
CERSAI detailsFile: CERSAI Undertaking.pdf25 Apr 2024

How this compares with Pune

17%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AMAR OASIS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pashan13,700+ in Pune

Builder: ACCENT PROJECT DEVELOPERS LLP

ACCENT PROJECT DEVELOPERS LLP has 1 registration on MahaRERA, including AMAR OASIS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if AMAR OASIS is delayed beyond 31 Mar 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AMAR OASIS?

The registered promoter entity is ACCENT PROJECT DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AMAR OASIS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AMAR OASIS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AMAR OASIS?

The professionals named in the filing: Architect: DESIGN 11; Engineer: GAURAO PATIL; Engineer: JW Consultants LLP; Chartered Accountant: P.S. ATHAVALE & CO; Chartered Accountant: Apte & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AMAR OASIS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AMAR OASIS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AMAR OASIS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.