Red flags
- Registration lapsed
- Possession 16 months past the filed date
- 3 complaints at MahaRERA
- Completion date moved by 66 months
- 3 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Amaltas Residency is a Residential / Group Housing project by Tattva & Mittal Corporation Pvt Ltd in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800010534 on 31 Aug 2017. Possession was promised by 30 Jun 2025 and is now 16 months past that date. The completion date has moved by 66 months from the original filing. 3 complaints are on record with the regulator.
At a glance
Project
- NameAmaltas Residency
- TypeResidential / Group Housing
- Location
- Road No. 2
- Chembur
- Kurla
- Mumbai Suburban
- 400071
- Pincode400071
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800010534
- ReraGenie IDRG-MH-26620
Builder
- NameTattva & Mittal Corporation Pvt Ltd
- Entity typeCompany
- CINU70102MH2014PTC256129
- GSTIN27AAFCT1136J1ZC
- Managing DirectorVINAYAK Jadhav
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on31 Aug 2017
- Promised completion30 Jun 2025
- Revised completionRevised to 30 Jun 2025 (originally 31 Dec 2019)
- Buildings1 building record
- Documents filed120 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Amaltas Residency | NA | 17 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 16 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.
Amaltas Residency: 76% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 5% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 40% |
Progress on shared amenities15
As on 16 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed31
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Chartered Accountant | M/s. Gaurav S. Rajpal & Co. |
| Partner | Role in project |
|---|---|
| Tattva & Mittal Corporation Pvt Ltd | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterSoon after we took over the Project and started construction work, the legal heirs of the original owner of the Project Land filed a case against the Society and the Promoter challenging the title of the Society to the Project Land, being Suit No. 758 of 2016 in the Hon’ble Bombay High Court. The said case caused delay in the project implementation. The said case was ultimately settled on or about 1st Nov, 2017. Additionally, the residents/ tenants/ owners of the adjoining bldg. started claiming that the Project Land is part of a larger layout known as Kandhari Colony and the open amenity spac
Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 53.85% allottees for purpose of extension of RERA registration period of the said project.
Reason as filed by the promoterThe project experienced significant delays initially due to the pandemic, which disrupted progress and affected timelines. Following this, there was a legal dispute with the society concerning the title of the land, further delaying our efforts. This legal matter was resolved in January 2024; however, the combined impact of these challenges has pushed our schedule considerably The current status of the project is that it is nearing the final stages of completion. Only the installation of passenger and car lifts remains, along with a few pending possession instalments, following which we will p
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 758/2016 | Bombay High Court | Disposed |
| 384, 447,457, 458/2018 | Bombay High Court | AD INTERIM RELIEF |
Complaints filed with MahaRERA3
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000001633 | Kunal Naik | Tattva & Mittal Corporation Private Limited | 01/11/2017 |
| CC006000000231228 | NISHAT GODA | TATTVA & MITTAL CORPORATION PVT LTD | 28/05/2022 |
| CC006000000428995 | KAMAL KISHORE SOMANI | Tattva & Mittal Corporation Pvt Ltd | 28/01/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 May 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 May 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed120
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 120 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of CA (Form 3)File: Form 3 - Amaltas Residency as on Dec 2024.pdf | 16 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Amaltas Residency as on Dec 2024.pdf | 16 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 18 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 15 Feb 2025 |
| Certificates of CA (Form 3)File: 20 Certificates of CA (Form 3).pdf | 15 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 19 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 15 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 As on 30-09-2024.pdf | 9 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Amaltas Residency as on June 2024 (REVISED).pdf | 6 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Amaltas Residency as on Sep 2024 (REVISED).pdf | 6 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory as on 30th Sep 2024.pdf | 30 Oct 2024 |
| Certificates of CA (Form 3)File: Form 3-Amaltas Residency-30th Sep 2024.pdf | 28 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Amaltas Residency as on Sep 2024 (1).pdf | 28 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 of Amaltas Residency as on 31-03-2024.pdf | 28 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory (1).pdf | 21 Oct 2024 |
| Declaration in FORM BFile: FORM -B Affidavit Cum Declaration.pdf | 19 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 As on 31-03-2024.pdf | 19 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 As on 30-06-2024.pdf | 19 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 As on 30-09-2024.pdf | 19 Oct 2024 |
| Certificates of CA (Form 3)File: Form 3-Amaltas Residency-30th June 2024.pdf | 19 Oct 2024 |
| Certificates of CA (Form 3)File: Form 3-Amaltas Residency-31st March 2024.pdf | 19 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Amaltas Residency as on March 2024.pdf | 19 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Amaltas Residency as on June 2024.pdf | 19 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2023-24.pdf | 19 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project) (1).pdf | 16 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 16 Jul 2024 |
| Certificates of CA (Form 3)File: 16 Certificates of CA (Form 3).pdf | 16 Jul 2024 |
| Layout approvalFile: Drawing (Latest) - Amaltas Residency_Page 1.pdf | 30 May 2024 |
| Building plan approvalFile: Drawing (Latest) - Amaltas Residency_Pages 2-4.pdf | 30 May 2024 |
| Copy of Layout Approval (in case of layout)File: Drawing (Latest) - Amaltas Residency_Page 1.pdf | 30 May 2024 |
| Building Plan Approval (IOD)File: Drawing (Latest) - Amaltas Residency_Pages 2-4.pdf | 30 May 2024 |
| Building plan approvalFile: Drawing (2)_compressed.pdf | 29 May 2024 |
| Building Plan Approval (IOD)File: Drawing (2)_compressed.pdf | 29 May 2024 |
| Declaration in FORM BFile: Form B (Affidavit cum Declaration).pdf | 3 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Dec.pdf | 3 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 02.pdf | 3 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: (Form 2A FY 2019-20).pdf | 3 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: (Form 2A FY 2020-21).pdf | 3 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Circular 29 .pdf | 3 Apr 2024 |
| Certificates of CA (Form 3)File: Form 03.pdf | 3 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: FORM 05 (2017-2018).pdf | 3 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 05 (2018-2019).pdf | 3 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 05 (2019-2020).pdf | 3 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 05 (2020-2021).pdf | 3 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 05 (2021-2022).pdf | 3 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 05 (2022-2023).pdf | 3 Apr 2024 |
| Declaration about Commencement CertificateFile: Format D.pdf | 2 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A (2021-22).pdf | 2 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A (2022-23).pdf | 2 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf | 2 Apr 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf | 2 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Amaltas Residency as on Sep 2023.pdf | 28 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Amaltas Residency as on Dec 2023.pdf | 28 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3 - Amaltas Residency as on Sep 2023.pdf | 28 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3 - Amaltas Residency as on Dec 2023.pdf | 28 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Amaltas For December 2023.pdf | 22 Mar 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC - Amaltas Residency.pdf | 8 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Amaltas Residency June 2023.pdf | 6 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3-Amaltas Residency as on June 2023.pdf | 6 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Amaltas Residency Sept 2022 - Form 2.pdf | 27 Nov 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-Amaltas Residency as on 31-12-2022.pdf | 27 Nov 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Amaltas Residency as on 31-03-2023.pdf | 27 Nov 2023 |
| Certificates of CA (Form 3)File: Form 3- Amaltas Residency as on September 2022.pdf | 27 Nov 2023 |
| Certificates of CA (Form 3)File: Form 3-Amaltas Residency-31-12-2022.pdf | 27 Nov 2023 |
| Certificates of CA (Form 3)File: Form 3-Amaltas Residency-31-03-2023.pdf | 27 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 as on March 2023.pdf | 24 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Amaltas For June 2023.pdf | 24 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Amaltas For September 2023.pdf | 24 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- Amaltas as on 2022-23.pdf | 30 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Amaltas Residency as on 04-04-2023.pdf | 17 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Amaltas Residency Mar 18 - Form 2.pdf | 30 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Amaltas Residency Mar 19 - Form 2.pdf | 30 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Amaltas Residency Mar 20 - Form 2.pdf | 30 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Amaltas Residency Mar 21 - Form 2.pdf | 30 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Amaltas Residency Jun 22 - Form 2.pdf | 30 May 2023 |
| Certificates of CA (Form 3)File: Form 3- Amaltas Residency as on June 2022.pdf | 30 May 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Latest Commencement Certificate.pdf | 5 May 2023 |
| Certificates of CA (Form 3)File: Form 3- Amaltas Residency as on March 2018.pdf | 5 May 2023 |
| Certificates of CA (Form 3)File: Form 3- Amaltas Residency as on March 2019.pdf | 5 May 2023 |
| Certificates of CA (Form 3)File: Form 3- Amaltas Residency ason March 2020.pdf | 5 May 2023 |
| Certificates of CA (Form 3)File: Form 3- Amaltas Residency as on March 2021.pdf | 5 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 of Amaltas Residency for FY 21-22.pdf | 14 Apr 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 120 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Amaltas Residency on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Chembur6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 475 registered projects within 2 km.
Hiranandani Maitri Park Phase 1
SHODEN DEVELOPERS PRIVATE LIMITED
Premiere by Panache
Panache Developers Pvt Ltd.
Sai Shrushti
Shree Sai Realtors
MASS METROPOLIS
GRACE URBAN DEVELOPMENT CORPORATION
ELEVIA
VIDA INFRAHUB LLP
PODDAR HARMONY
PODDAR CREATORS LLP
See every Mumbai Suburban project, with the district possession charts
Builder: Tattva & Mittal Corporation Pvt Ltd
Tattva & Mittal Corporation Pvt Ltd has 1 registration on MahaRERA, including Amaltas Residency. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that Amaltas Residency shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Amaltas Residency is delayed beyond 30 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Amaltas Residency?
The registered promoter entity is Tattva & Mittal Corporation Pvt Ltd, a company as per the filing. Its CIN U70102MH2014PTC256129 and GSTIN 27AAFCT1136J1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Amaltas Residency?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Amaltas Residency?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Amaltas Residency?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Amaltas Residency?
The professionals named in the filing: Chartered Accountant: M/s. Gaurav S. Rajpal & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Amaltas Residency?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback