ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Altavista - Phase 3

Registered No litigation declared Residential / Group Housing project

Altavista - Phase 3

By SPENTA ENCLAVE PRIVATE LIMITED

RG-MH-44273 · RERA P51800021249 · Last updated on MahaRERA portal: 16 Jul 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 36 months
  • 1 extension taken
  • Rs 676.00 crore secured on the land, in favour of JM Financial Asset Reconstruction Company Ltd, Motilal Oswal Real Estate Investment Advisors II Pvt Ltd
  • The charge is held by JM Financial Asset Reconstruction Company Ltd, a distressed-debt buyer or stressed-asset fund rather than an originating lender

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2028Possession promisedmoved 36 months from the original
5 of 11Construction stages donefurthest along: Staircases, 50%
29 of 64Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 192 documents Report an error

Altavista - Phase 3 is a Residential / Group Housing project by SPENTA ENCLAVE PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800021249 on 14 Jun 2019. Possession is promised by 30 Jun 2028. The completion date has moved by 36 months from the original filing. 35 of the 64 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameAltavista - Phase 3
  • TypeResidential / Group Housing
  • Location
    • Off V.N. Purav Marg
    • Chembur
    • Kurla
    • Mumbai Suburban
    • 400071
  • Pincode400071
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800021249
  • ReraGenie IDRG-MH-44273

Builder

  • NameSPENTA ENCLAVE PRIVATE LIMITED
  • Entity typeCompany
  • Director - SuspendedVishwatej Salvi
  • Other registrations5 more →
  • Completed1 of 6
  • Declared earlier projects2 →

Key dates

this monthRegisteredJun 2019First promiseJun 2025Revised toJun 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Jun 2019
  • Promised completion30 Jun 2028
  • Revised completionRevised to 30 Jun 2028 (originally 30 Jun 2025)
  • Buildings1 building record
  • Documents filed192 files

Current status

55%35 of 64 units booked
54.8%Work done, per cost certificate

Figures as on 16 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing HNA292364064

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 50%.

Wing H: 51% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises8%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed64

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots64
Closed/Covered64

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area300 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofJM Financial Asset Reconstruction Company Ltd, Motilal Oswal Real Estate Investment Advisors II Pvt Ltd
Secured amountRs 676.00 crore
Declared on29 May 2025

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI5456.0
Proposed, not sanctioned5,456 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTulsiani Chambers, Free Press Journal Marg, Nariman Point, Mumbai - 400021
Estimated costRs 44.65 cr
Cost incurredRs 24.47 cr
Work done54.8%
BuildingWingEstimatedIncurred
Wing HNARs 44.65 crRs 24.47 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRajendra Ulhas Pagnis
EngineerSuresh Kamble
EngineerManohar Ganesh Gadgil Shasme Design Consulatants
Chartered AccountantParas Thakkar & Associates
Chartered AccountantShashank R. Jain & Associates
PartnerRole in project
SPENTA ENCLAVE PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA20062501686Jun 2025 → Jun 2028

Reason as filed by the promoterRefer explanatory statement for reason for delay

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000197467Vikas LateySpenta Enclave Pvt. Ltd02/07/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Feb 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Jun 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jun 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2028

Documents filed192

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 192 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Phase 3 Form 1.pdf16 Jul 2026
Withdrawal Update Form 2File: Form 2 Phase 3 .pdf16 Jul 2026
Withdrawal Update Form 3File: Phase 3 Form 3_compressed (1).pdf16 Jul 2026
Withdrawal Update Form 1File: Phase 3 Form 1.pdf29 Apr 2026
Withdrawal Update Form 2File: Phase 3 Form 2.pdf29 Apr 2026
Withdrawal Update Form 3File: Phase 3 Form 3_compressed.pdf29 Apr 2026
Withdrawal Update Form 1File: Form 1 Q1FY2025-26 Altavista Phase 3.pdf13 Feb 2026
Withdrawal Update Form 1File: Form1_Altavista Phase 3.pdf13 Feb 2026
Withdrawal Update Form 1File: Phase 3.pdf13 Feb 2026
Withdrawal Update Form 2File: Form 2 Q1FY2025-26 Altavista Phase 3.pdf13 Feb 2026
Withdrawal Update Form 2File: Form 2 Q1FY2025-26 Altavista Phase 3.pdf13 Feb 2026
Withdrawal Update Form 2File: phase 3 Form 2.pdf13 Feb 2026
Withdrawal Update Form 3File: Form 3 P3- 30062025.pdf13 Feb 2026
Withdrawal Update Form 3File: Form 3 P3 -30092025.pdf13 Feb 2026
Withdrawal Update Form 3File: Form 3 Phase 3_compressed.pdf13 Feb 2026
Form 5 (FY 2024-2025)File: Form 5_Altavista Phase 3.pdf23 Sep 2025
Commencement certificateFile: Comemncement Certificate.pdf17 Jul 2025
Layout approvalFile: Layout Plan H wing.pdf20 Jun 2025
Building plan approvalFile: H wing Page 1.pdf20 Jun 2025
Building plan approvalFile: H wing Page 2.pdf20 Jun 2025
Building plan approvalFile: H wing Page 3.pdf20 Jun 2025
Building plan approvalFile: H wing Page 4.pdf20 Jun 2025
Building plan approvalFile: H wing Page 5.pdf20 Jun 2025
Building plan approvalFile: H wing Page 6.pdf20 Jun 2025
Building plan approvalFile: H wing Page 7.pdf20 Jun 2025
Building plan approvalFile: H wing Page 8.pdf20 Jun 2025
Building plan approvalFile: H wing Page 9.pdf20 Jun 2025
Building plan approvalFile: H wing Page 10.pdf20 Jun 2025
Building plan approvalFile: H wing Page 11.pdf20 Jun 2025
Building plan approvalFile: H wing Page 12.pdf20 Jun 2025
Building plan approvalFile: H wing Page 13.pdf20 Jun 2025
Building plan approvalFile: H wing Page 14.pdf20 Jun 2025
Building plan approvalFile: H wing Page 15.pdf20 Jun 2025
Building plan approvalFile: H wing Page 16.pdf20 Jun 2025
Building plan approvalFile: H wing Page 17.pdf20 Jun 2025
Building plan approvalFile: H wing Page 18.pdf20 Jun 2025
Building plan approvalFile: H wing Page 19.pdf20 Jun 2025
Building plan approvalFile: H wing Page 20.pdf20 Jun 2025
Building plan approvalFile: H wing Page 21.pdf20 Jun 2025
Building plan approvalFile: H wing Page 22.pdf20 Jun 2025
Building plan approvalFile: H wing Page 23.pdf20 Jun 2025
Building plan approvalFile: H wing Page 24.pdf20 Jun 2025
Building plan approvalFile: H wing Page 25.pdf20 Jun 2025
Building plan approvalFile: H wing Page 26.pdf20 Jun 2025
Building plan approvalFile: H wing Page 27.pdf20 Jun 2025
Building plan approvalFile: H wing Page 28.pdf20 Jun 2025
Building plan approvalFile: H wing Page 29.pdf20 Jun 2025
Building plan approvalFile: H wing Page 30.pdf20 Jun 2025
Building plan approvalFile: H wing Page 31.pdf20 Jun 2025
Building plan approvalFile: H wing Page 32.pdf20 Jun 2025
Building plan approvalFile: H wing Page 33.pdf20 Jun 2025
Building plan approvalFile: H wing Page 34.pdf20 Jun 2025
Building plan approvalFile: H wing Page 35.pdf20 Jun 2025
Building plan approvalFile: H wing Page 36.pdf20 Jun 2025
Building plan approvalFile: H wing Page 37.pdf20 Jun 2025
Building plan approvalFile: H wing Page 38.pdf20 Jun 2025
Building plan approvalFile: H wing Page 39.pdf20 Jun 2025
Building plan approvalFile: H wing Page 40.pdf20 Jun 2025
Building plan approvalFile: H wing Page 41.pdf20 Jun 2025
Building plan approvalFile: H wing Page 42.pdf20 Jun 2025
Building plan approvalFile: H wing Page 43.pdf20 Jun 2025
Form 1File: Altavista Phase 3_Q4FY2024-25.pdf19 Jun 2025
Form 2File: Altavista Phase 3_Q4FY2024-25.pdf19 Jun 2025
Form 3File: Altavista P3_Q4FY2024-25.pdf19 Jun 2025
Disclosure of Sold and Booked InventoryFile: Altavista Phase 3_Q4FY2024-25.pdf19 Jun 2025
Form 2A (FY 2024-2025)File: Form 2A Altavista Phase 3_FY2024-25.pdf30 May 2025
Certificates of CA (Form 3)File: Altavista P3_Q4FY2024-25.pdf28 Apr 2025
Disclosure of sold/ booked inventoryFile: Altavista Phase 3_Q4FY2024-25.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Altavista Phase 3_Q4FY2024-25.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Altavista Phase 3_Q4FY2024-25.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: Altavista Phase 3_Q4FY2023-24.pdf24 Mar 2025
Disclosure of sold/ booked inventoryFile: Altavista Phase 3_Q1FY2024-25.pdf24 Mar 2025
Disclosure of sold/ booked inventoryFile: Altavista Phase 3_Q2FY2024-25.pdf24 Mar 2025
Disclosure of sold/ booked inventoryFile: Altavista Phase 3_Q3FY2024-25.pdf24 Mar 2025
Certificates of CA (Form 3)File: Form 3_Q3FY2024-25_Phase3_compressed.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Altavista Phase III.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Phase3_Q3FY2024-25.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate- Phase3- Q2.pdf13 Dec 2024
Certificates of CA (Form 3)File: P3 Form 3 30092024.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: P3 - Form2.pdf23 Oct 2024

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Altavista - Wing BAltavista Off VN Purav Marg Chembur East Mumbai 40007190CompletedDec 2019Nov 2019
Altavista - Wing AAltavista Off VN Purav Marg Chembur East Mumbai 40007190CompletedDec 2019Nov 2019

How this compares with Mumbai Suburban

55%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 36 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Altavista - Phase 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chembur6,700+ in Mumbai Suburban

2 kmAltavista - Phase 3Completed 135Lapsed / revoked 96Other 140Dot size: filed unitsN

Filed coordinates, straight-line distance. 371 registered projects within 2 km.

Builder: SPENTA ENCLAVE PRIVATE LIMITED

SPENTA ENCLAVE PRIVATE LIMITED has 6 registrations on MahaRERA, including Altavista - Phase 1 and Altavista - Phase 2. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Altavista - Phase 3 is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Altavista - Phase 3?

The registered promoter entity is SPENTA ENCLAVE PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Altavista - Phase 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Altavista - Phase 3?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Altavista - Phase 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Altavista - Phase 3?

The professionals named in the filing: Architect: Rajendra Ulhas Pagnis; Engineer: Suresh Kamble; Engineer: Manohar Ganesh Gadgil Shasme Design Consulatants; Chartered Accountant: Paras Thakkar & Associates; Chartered Accountant: Shashank R. Jain & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Altavista - Phase 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Altavista - Phase 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Altavista - Phase 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.