ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Altavista - Phase 1

Completed No litigation declared Residential / Group Housing project

Altavista - Phase 1

By SPENTA ENCLAVE PRIVATE LIMITED

RG-MH-08072 · RERA P51800001050 · Last updated on MahaRERA portal: 17 Jun 2026

Source: official MahaRERA filing

Red flags

  • 18 complaints at MahaRERA
  • Completion date moved by 55 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jul 2024Possession promisedregistration recorded completed
40 of 44Construction stages doneacross 4 buildings; furthest along: Podiums (if any), 0%
18Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

Altavista - Phase 1 is a Residential / Group Housing project by SPENTA ENCLAVE PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800001050 on 25 Jul 2017. The registration is recorded completed; possession was promised by 31 Jul 2024. The completion date has moved by 55 months from the original filing. 18 complaints are on record with the regulator.

At a glance

Project

  • NameAltavista - Phase 1
  • TypeResidential / Group Housing
  • Location
    • Kurla
    • Mumbai Suburban
    • 400071
  • Pincode400071
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800001050
  • ReraGenie IDRG-MH-08072

Builder

  • NameSPENTA ENCLAVE PRIVATE LIMITED
  • Entity typeCompany
  • Director - SuspendedVishwatej Salvi
  • Other registrations5 more →
  • Completed1 of 6
  • Declared earlier projects2 →

Key dates

this monthRegisteredJul 2017First promiseDec 2019Revised toJul 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Jul 2017
  • Promised completion31 Jul 2024
  • Revised completionRevised to 31 Jul 2024 (originally 31 Dec 2019)
  • Buildings4 building records
  • Documents filed91 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA290000
Wing BNA290000
Wing CNA290000
Wing DNA290000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 17 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

40 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 0%.

Wing A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wing B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wing C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wing D91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 17 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
NANoNot applicable

Parking filed486

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots486
Closed/Covered486
BuildingClosed/CoveredTotal
Wing A9090
Wing B9090
Wing C176176
Wing D130130

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,795 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI30657.0
Proposed, not sanctioned30,657 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch101-104, Ground Floor, Tulsiani Chambers, Free Press Journal Marg, Nariman Point, Mumbai - 400021

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRajendra Ulhas Pagnis
EngineerManohar Ganesh Gadgil Shasme Design Consulatants
PartnerRole in project
SPENTA ENCLAVE PRIVATE LIMITED-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800005348Dec 2019 → Dec 2020

Reason as filed by the promoterThe project being undertaken is being undertaken under the provisions of chapter 33(10) of the DCR pertaining to the rehabilitation of slums. As per provisions of this chapter, OC for Sale Wings cannot be granted until such time that OC is obtained for an equivalent area of Rehab. The Rehab OC was delayed despite construction completion on schedule for the following reasons. 1) Delay caused by locals in permitting us to demolish and shift a temporary staircase allowing for movement from our property to an adjacent property. 2) A letter dated 29/07/2019 (attached) sent by Police to SRA stopping

EXT51800017403Dec 2019 → Jul 2024

Reason as filed by the promoterIn the aforementioned project Altavista Phase 1 we have completed 4 wings having 445 residential flats. Unfortunately, the elevator company messed up the installation of 2 elevators and we could not take occupation for 6 flats only, out of the total 445 residential flats. The elevators are now installed but in the meantime, our company is admitted to National Company Law Tribunal (NCLT) for the resolution process. The other 439 residential flats occupation certificate is received and they all are occupying their flats. Along with this letter we are enclosing herewith the Occupation certificate

Complaints filed with MahaRERA18

Case no.ComplainantRespondentFiled
CC006000000012242Subhash BawaSpenta Enclave Private Limited01/12/2017
CC006000000196080Debanik BasuSpenta Enclave Private Limited17/02/2021
CC006000000198163MANISH AGARWALSPENTA ENCLAVE PVT LTD05/12/2021
CC006000000182111Umesh Prabhakar Dhopate and Pranita Umesh DhopateSpenta Enclave Pvt Ltd08/01/2020
CC006000000193129Anil Kishinchand RajaniSpenta Enclave Private Limited25/07/2020
CC006000000193279Mrs Sneha Vijay Nair and Mr Vijaykumar MadhavanSpenta Enclave Private Limited10/06/2020
CC006000000193504Mr. Dhirendra Kumar Sinha and Mrs. Devyani SinghSpenta Enclave Private Limited28/07/2020
CC006000000193598Amisha GhiaSpenta Enclave Pvt Ltd27/07/2020
CC006000000194734Geeta PramodKumar GuptaSPENTA ENCLAVE PRIVATE LIMITED31/10/2020
CC006000000195325Monish SatweSpenta Enclave Pvt. Ltd.21/12/2020
CC006000000195328Monish SatweSpenta Enclave Pvt. Ltd.21/12/2020
CC006000000195989Urvanki I ShahSpenta Enclave Pvt Ltd14/05/2021
CC006000000196203Rajan Singh ChughAlta Vista Builder Builder Spenta Corporation28/02/2021
CC006000000197549Mr Shrinivas Manche & Mrs Vanita MancheSpenta Enclave Private Limited07/07/2021
CC006000000221130Ganesh Praful TondwalkarSPENTA ENCLAVE PVT. LTD16/05/2022
CC006000000292650Smriti Parekhspenta enclave pvt ltd14/09/2022
CC12500008Rajesh JhunjhunwalaAnil Kishinchand Rajani01/01/2025
CC12500009Rajesh JhunjhunwalaGanesh Praful Tondwalkar01/01/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jun 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 31 Jan 2025

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: OC 13.pdf17 Jun 2026
Occupational CertificateFile: sra letter to Rera.pdf17 Jun 2026
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 ALtavista Phase 1.pdf31 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf31 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Dec23.pdf2 Feb 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: C Wing 6 FLATS OC LETTER.pdf1 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form2A FY2019-20_P1.pdf25 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form2A FY2020-21_P1.pdf25 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form2A FY2021-22_P1.pdf25 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form2A FY2022-23_P1.pdf25 Aug 2023
Declaration in FORM BFile: Form B.pdf23 Aug 2023
Certificates of CA (Form 3)File: (P1) SPENTA ENCLAVE PVT LTD FORM-3 310321_compressed.pdf18 Aug 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Soc_certificate_Altavista_A_B_D_wing.pdf4 Jul 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: RERA Letter Society.PDF23 Feb 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: AV_Phase1_Society_MahaRERA.pdf10 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 2018-19 CA (Form 5).pdf6 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 2019-20 CA (Form 5).pdf6 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Wing Abcd.PDF25 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P1_compressed.pdf26 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Phase 1 FY2020-21.pdf1 Oct 2021
Disclosure of sold/ booked inventoryFile: Altavista Phase 1 Inventory.PDF18 Aug 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OCC Letter Part CD wing.pdf18 Aug 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Letter_1.pdf6 Jul 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Letter_2.pdf6 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate Phase 1_Form2.pdf2 Jul 2021
Certificates of CA (Form 3)File: (P1) SPENTA ENCLAVE PVT LTD FORM-3 3112020.pdf2 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: CC SALE BLDG E F UPTO 15TH FLOOR AND J AND K TILL PLINTH.pdf21 Jun 2021
Declaration about Commencement CertificateFile: Format D Altavista P1.pdf21 Jun 2021
Disclosure of sold/ booked inventoryFile: Inventory Disclosure Altavista P1.pdf14 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate Mar 2021 Phase I Tower ABCD.pdf16 Apr 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Phase 1_Form2.pdf22 Mar 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate Dec 2020 Phase I Tower ABCD.pdf31 Jan 2021
Certificates of CA (Form 3)File: Form 3 Spenta Enclave Pvt Ltd.PDF7 Jan 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate of Altavista Phase - 1.pdf27 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect P1 Sep 2020.pdf9 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Certificate Altavista Phase-1.pdf9 Nov 2020
Certificates of CA (Form 3)File: Altavista Form 3 P1 June20.PDF9 Nov 2020
Certificates of CA (Form 5)File: Form 5 Phase 1 (1).pdf30 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Phase 2 Q1 FY202021.pdf8 Sep 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Certificate of Phase-1.pdf27 Aug 2020
Certificates of CA (Form 3)File: FORM-3 Phase-I (1).pdf27 Aug 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA CERTIFICATE PHASE I JAN TO MARCH 2020_compressed (1).pdf10 Aug 2020
Details of Restarting of Construction work post lockdownFile: Phase I.pdf4 Jul 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate Sign Phase 1_Form2.PDF27 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Altavista Phase 1_ Architect Certificate Dec.PDF20 Feb 2020
Certificates of CA (Form 3)File: FORM-3 ALATVISTA PHASE-I Q-3 2019-20 (2).pdf20 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Altavista Phase 1_ Architect Certificate Sep.PDF23 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Altavista Phase 1_ Engineer Certificate.pdf23 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Altavista Phase 1_ Engineer Certificate.pdf23 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Altavista Phase 1_ Architect Certificate.PDF7 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Altavista Phase 1_ Architect Certificate.PDF7 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Altavista Phase 1_ Architect Certificate.PDF7 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Altavista Phase 1_ Architect Certificate.PDF7 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Altavista Phase 1_ Engineer Certificate.PDF7 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Altavista Phase 1_ Engineer Certificate.PDF7 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Altavista Phase 1_ Engineer Certificate.PDF7 Jan 2020
Certificates of CA (Form 3)File: Altavista Phase 1_ RERA Certificate.PDF7 Jan 2020
Certificates of CA (Form 3)File: Alta vista Phase I Rera Certificate.PDF7 Jan 2020
Certificates of CA (Form 3)File: Altavista Phase I.pdf27 Nov 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ppartocanb.pdf15 Nov 2019
Certificates of CA (Form 5)File: Spenta Enclave Phase I Form 5.pdf30 Sep 2019
Certificates of CA (Form 3)File: PH1 FORM 3 -1.pdf8 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate_1.pdf1 Aug 2019
Certificates of CA (Form 3)File: Form 3 Alta Vista I final1.pdf25 Jun 2019
Details of encumbrancesFile: Letter of Encumberances_Phase 3 Final.pdf4 May 2019
Certificates of CA (Form 3)File: Alta Vista Phase I Form iii.pdf4 Feb 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATES1.pdf20 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engg certificate form2.pdf20 Dec 2018
Certificates of CA (Form 3)File: form 3 sept phiCertificate1 26.pdf20 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERTIFICATE JUNE18.pdf13 Nov 2018
Certificates of CA (Form 3)File: CA CERTIFICATE JUNE18.pdf13 Nov 2018
Certificates of CA (Form 3)File: CA CERTIFICATE JUNE18.pdf13 Nov 2018
Certificates of CA (Form 5)File: Altavista Phase 1- Annual Return.pdf30 Sep 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Altavista ENg P I-1 mb.pdf2 Nov 2017
Declaration in FORM BFile: Form B Phase I-1mb.pdf31 Oct 2017
Details of encumbrancesFile: Encumbrance - enclave.pdf30 Oct 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Artitech enclave A-D-1mb.pdf30 Oct 2017
Certificates of CA (Form 3)File: Spenta Enclave RERA Certificate Phase I-1mb.pdf30 Oct 2017
Declaration in FORM BFile: Form B (Phase 1).pdf20 Jul 2017
Details of encumbrancesFile: Final Letter of Encumberance.pdf19 Jul 2017

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Altavista - Wing BAltavista Off VN Purav Marg Chembur East Mumbai 40007190CompletedDec 2019Nov 2019
Altavista - Wing AAltavista Off VN Purav Marg Chembur East Mumbai 40007190CompletedDec 2019Nov 2019

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 55 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Altavista - Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kurla6,700+ in Mumbai Suburban

2 kmAltavista - Phase 1Completed 137Lapsed / revoked 97Other 144Dot size: filed unitsN

Filed coordinates, straight-line distance. 378 registered projects within 2 km.

Builder: SPENTA ENCLAVE PRIVATE LIMITED

SPENTA ENCLAVE PRIVATE LIMITED has 6 registrations on MahaRERA, including Altavista - Phase 1 and Altavista - Phase 2. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Altavista - Phase 1 is delayed beyond 31 Jul 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Altavista - Phase 1?

The registered promoter entity is SPENTA ENCLAVE PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Altavista - Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Altavista - Phase 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Altavista - Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Altavista - Phase 1?

The professionals named in the filing: Architect: Rajendra Ulhas Pagnis; Engineer: Manohar Ganesh Gadgil Shasme Design Consulatants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Altavista - Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Altavista - Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Altavista - Phase 1 to a free account