Home / Browse projects / Pune, Maharashtra / Akashparv C
Akashparv C
By SHARADA SHRIKALP PROMOTERS & BUILDERS
RG-MH-18867 · RERA P52100077807 · Last updated on MahaRERA portal: 6 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 83.50 crore secured on the land, in favour of Sharada Shrikalp Promoters and Builders
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Akashparv C is a Residential / Group Housing project by SHARADA SHRIKALP PROMOTERS & BUILDERS in Pune, Maharashtra, registered with MahaRERA as P52100077807 on 7 Nov 2024. Possession is promised by 31 Dec 2028. 24 of the 74 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameAkashparv C
- TypeResidential / Group Housing
- Location
- Bavdhan Road
- Chandani Chowk
- Bavdhan Kh.
- Haveli
- Pune
- 411021
- Pincode411021
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100077807
- ReraGenie IDRG-MH-18867
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on7 Nov 2024
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings1 building record
- Documents filed87 files
Current status
Figures as on 6 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing C | NA | 28 | 26 | 74 | 0 | 74 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 6 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 20%.
Wing C: 47% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 20% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities19
As on 6 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 50% |
| Solid Waste Management And Disposal | Yes | 50% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 50% |
| Open Parking | Yes | 0% |
| Swimming Pool and Kids pool | Yes | 70% |
| Open Cafe | Yes | 50% |
| Indoor Game Area | Yes | 50% |
| Club House Banquet and Gym | Yes | 70% |
Parking filed197
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| SANMATI SAHKARI GRUH RACHANA SANSTHA | Bavdhan Kh. | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Wing C | NA | Rs 94.27 cr | Rs 68.65 cr |
| - | NA | Rs 26.62 cr | Rs 6.27 cr |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | CUBIX ARCHITECTS Imran Shaikh |
| Architect | Cubix Architects and Associates |
| Architect | Sandeep Hardikar |
| Engineer | SANDIP NAISE |
| Chartered Accountant | P B SHAH |
| Chartered Accountant | Pramod B. Shah |
| Chartered Accountant | Rushabh Jain |
| Chartered Accountant | Rishabh R Jain |
| Partner | Role in project |
|---|---|
| SHARADA SHRIKALP PROMOTERS & BUILDERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 Oct 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Jul 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Jul 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed87
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2024-2025)File: Form 5 for 2024-25.pdf | 6 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 2A 2026.pdf | 29 Jun 2026 |
| Form 1File: Form 1 April 2026.pdf | 30 Apr 2026 |
| Form 2File: Form 2 April 2026 Akashparv.pdf | 30 Apr 2026 |
| Form 3File: Form 3 April 26 Akashparv_compressed.pdf | 30 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory April 2026.pdf | 30 Apr 2026 |
| Form 1File: FORM 1 AKASHPARV JAN 26.pdf | 16 Mar 2026 |
| Form 2File: Form 2 Akashparv C Jan 26.pdf | 16 Mar 2026 |
| Form 3File: Form 3 Akashparv Jan 26_compressed.pdf | 16 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: AKASHPARV - C WING - SOLD UNSOLD - DEC 2025.pdf | 16 Mar 2026 |
| Form 1File: Form 1 Nov 25.pdf | 1 Dec 2025 |
| Form 2File: Form 2 Nov 25.pdf | 1 Dec 2025 |
| Form 3File: Form 3 Nov25_compressed.pdf | 1 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf | 1 Dec 2025 |
| Form 1File: Form 1 Akashparv - April 25.pdf | 21 Nov 2025 |
| Form 2File: Form 2 April 25.pdf | 21 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Book Inventory April 2025.pdf | 21 Nov 2025 |
| Form 3File: Form 3 Akashparv April 2025_compressed (1).pdf | 21 Nov 2025 |
| Form 2A (FY 2024-2025)File: Form 2A Signed.pdf | 8 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold or Booked Inventory.pdf | 29 Jul 2025 |
| Form 3File: Form 3 July 25 Akashparv.pdf | 29 Jul 2025 |
| Form 1File: Form 1 July 25 Akashparv.pdf | 29 Jul 2025 |
| Form 2File: Form 2.pdf | 29 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Akashparv - April 25.pdf | 18 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Akashparv April 2025_compressed.pdf | 18 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 April 25.pdf | 18 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Book Inventory April 2025.pdf | 18 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Akashparv C Jan 25.pdf | 22 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jan 25_compressed.pdf | 22 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Akashparv C Jan 25.pdf | 22 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Akashparv C Jan 25.pdf | 22 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jan 25_compressed.pdf | 22 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Akashparv C Jan 25.pdf | 22 Jan 2025 |
| Other - FinanceFile: Declaration about Land cost - Nil.pdf | 29 Oct 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of Secured - Unsecured Finance with CA.pdf | 29 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 New_compressed (1).pdf | 17 Oct 2024 |
| CERSAI detailsFile: Declaration of CERSAI.pdf | 17 Oct 2024 |
| Other - FinanceFile: Loan Sanction Letter 80 cr reduced.pdf | 17 Oct 2024 |
| Other - FinanceFile: Declaration about Landowner share.pdf | 17 Oct 2024 |
| Other - TechnicalFile: Form 2 Latest.pdf | 17 Oct 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_Akashparv 70 Cr.pdf | 16 Oct 2024 |
| Details of encumbrances concerned to FinanceFile: Financial Encumbrance revised.pdf | 9 Oct 2024 |
| CERSAI detailsFile: CERSAI Search Report - C Wing - Aditya Birla- 09-10-2024.pdf | 9 Oct 2024 |
| Details of encumbrances concerned to LegalFile: Financial Encumbrance revised.pdf | 9 Oct 2024 |
| Other - TechnicalFile: CREDAI Membership Details.pdf | 8 Oct 2024 |
| Copy of the legal title reportFile: New Search Title_compressed.pdf | 7 Oct 2024 |
| Proforma of Agreement for saleFile: Agreement to Sale - C Wing.pdf | 7 Oct 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf | 13 Aug 2024 |
| Other - TechnicalFile: Annexure A.pdf | 13 Aug 2024 |
| Other - LegalFile: Bhagwan Mahavir Mandal Letter.pdf | 9 Aug 2024 |
| Other - FinanceFile: Declaration about Account Number.pdf | 9 Aug 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B Bank Letter.pdf | 9 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 7 Aug 2024 |
| Other - TechnicalFile: Screenshot of Mail of CC.pdf | 7 Aug 2024 |
| Layout approvalFile: Layout plan.pdf | 30 Jul 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrances.pdf | 30 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: Layout plan.pdf | 30 Jul 2024 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf | 30 Jul 2024 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE 2024- Akashparv C.pdf | 30 Jul 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrances.pdf | 30 Jul 2024 |
| Other - TechnicalFile: Declaration about Plot Area.pdf | 30 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other organization Sagar Yadav.pdf | 30 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other organization Vilas Yadav.pdf | 30 Jul 2024 |
| PAN CardFile: PAN Card.PDF | 25 Jul 2024 |
| Building plan approvalFile: plan32.pdf | 23 Jul 2024 |
| Building plan approvalFile: plan31.pdf | 23 Jul 2024 |
| Building plan approvalFile: plan30.pdf | 23 Jul 2024 |
| Building plan approvalFile: plan29.pdf | 23 Jul 2024 |
| Building plan approvalFile: plan28.pdf | 23 Jul 2024 |
| Building plan approvalFile: plan27.pdf | 23 Jul 2024 |
| Building plan approvalFile: plan26.pdf | 23 Jul 2024 |
| Building plan approvalFile: plan25.pdf | 23 Jul 2024 |
| Building plan approvalFile: plan24.pdf | 23 Jul 2024 |
| Declaration in FORM BFile: Affidavit Cum Declaration FORM B.pdf | 23 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Akashparv C.pdf | 23 Jul 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: building cc_compressed.pdf | 23 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: plan24.pdf | 23 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: plan25.pdf | 23 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: plan26.pdf | 23 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: plan27.pdf | 23 Jul 2024 |
Promoter's earlier projects7
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Akashparv DP52100048452 | Near to Chandani Chowk, Pune | 7 | Jan 2023 | Ongoing | Dec 2024 | Not delivered |
| PARITOSH I | BALEWADI | 131 | - | Completed | Dec 2016 | Late, Mar 2017 |
| STEP ONE | KOTHRUD | 15 | - | Completed | Apr 2015 | Nov 2014 |
| SPANDAN D12 D13 | WARJE | 70 | - | Completed | May 2014 | Late, Jul 2014 |
| MEGHSPARSH I | AMBEGAON | 172 | - | Completed | Mar 2014 | Jan 2014 |
| SPANDAN | WARJE | 27 | - | Completed | Mar 2013 | Late, Apr 2013 |
| SPANDAN RESIDENCY | WARJE | 28 | - | Completed | Feb 2013 | Dec 2012 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 87 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Akashparv C on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Chandani Chowk13,700+ in Pune
Filed coordinates, straight-line distance. 11 registered projects within 2 km.
NYATI EQUINOX I
MIHIR HOMES ENTERPRISE LLP
Puraniks Abitante Fiore, Phase 2A
Puranik Buildcon Private Limited
Puraniks Abitante Fiore, Phase 2B
Puranik Buildcon Private Limited
cloud 51
OREE REALITY PVT LTD
CIELO BY VTP LUXE
DELAS REALCON LLP
Puraniks Abitante Fiore Phase 2C1
Puranik Buildcon Private Limited
Builder: SHARADA SHRIKALP PROMOTERS & BUILDERS
SHARADA SHRIKALP PROMOTERS & BUILDERS has 3 registrations on MahaRERA, including Akashparv A, B and Akashparv D. Its filings disclose 7 earlier MahaRERA projects: declares 3 of 6 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Akashparv C is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Akashparv C?
The registered promoter entity is SHARADA SHRIKALP PROMOTERS & BUILDERS, a partnership as per the filing. Its GSTIN 27ACBFS5164Q1ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Akashparv C?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Akashparv C?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Akashparv C?
The professionals named in the filing: Architect: CUBIX ARCHITECTS Imran Shaikh; Architect: Cubix Architects and Associates; Architect: Sandeep Hardikar; Engineer: SANDIP NAISE; Chartered Accountant: P B SHAH; Chartered Accountant: Pramod B. Shah. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Akashparv C?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.