Registered No litigation declared Residential / Group Housing project

Aishani Royale

By Eskcays Estatess Private Limited

RG-MH-18402 · RERA P99000076873 · Last updated on MahaRERA portal: 23 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Staircases, 75%
14 of 20Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

Aishani Royale is a Residential / Group Housing project by Eskcays Estatess Private Limited in Palghar, Maharashtra, registered with MahaRERA as P99000076873 on 3 Jul 2024. Possession is promised by 30 Dec 2028. 6 of the 20 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameAishani Royale
  • TypeResidential / Group Housing
  • Location
    • Palghar
    • 401404
  • Pincode401404
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000076873
  • ReraGenie IDRG-MH-18402

Builder

  • NameEskcays Estatess Private Limited
  • Entity typeCompany
  • Managing DirectorKirtikumar Hemraj Bafna
  • Other registrations2 more →
  • Past their filed date1

Key dates

this monthRegisteredJul 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Jul 2024
  • Promised completion30 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed71 files

Current status

30%6 of 20 units booked
56.2%Work done, per cost certificate

Figures as on 23 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Aishani RoyaleNA6620020

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 75%.

Aishani Royale: 57% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed5

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots5
Closed/Covered1
Open Space4

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area385 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on14 Feb 2026
LandownerVillageDistrict
Neeta Prakash Lulla And Vanshita DInesh LullaPalghar Palghar

Approvals and building plan

Sanctioning authorityPalghar Municipal Council
Permissible FSI858.31
Proposed, not sanctioned858 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Satyam Commercial Complex, Kacheri Rd, Palghar, Maharashtra 401404
Estimated costRs 1.49 cr
Cost incurredRs 83.53 lakh
Work done56.25%
BuildingWingEstimatedIncurred
Aishani RoyaleNARs 1.39 crRs 83.53 lakh
-NARs 9.28 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectChirag Bafna
EngineerMRUDULA KALE
Chartered AccountantB R Kotecha & Co
Chartered AccountantSIDDHARTH BHUPENDRA GOGARI
Chartered AccountantEESHA Bafna
PartnerRole in project
Eskcays Estatess Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2028

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1_ARCH_Q4_2025-26_Aishani Royale (2).pdf23 May 2026
Withdrawal Update Form 2File: Form 2_Q4_2025-26_Eng Certificate_Aishani Royale (1).pdf23 May 2026
Withdrawal Update Form 3File: Form 3_CA_Q4_2025-26_Aishani Royale Dt 23_05_2026.pdf23 May 2026
Form 2A (FY 2024-2025)File: EEPL-AISHANI ROYALE.pdf14 Feb 2026
Form 1File: Form 1_ARCH_Q3_2025-26_Aishani Royale.pdf22 Jan 2026
Form 2File: Form 2_Q3_2025-26_Eng Certificate_Aishani Royale.pdf22 Jan 2026
Form 3File: Form 3_Q3_2025-26_CA_Aishani Royale_22012026.pdf22 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold Inventory_Q3_FY2025-26_Aishani Royale_170126.pdf22 Jan 2026
Form 1File: Form 1_ARCH_Q2_2025-26_Aishani Royale.pdf29 Nov 2025
Form 2File: Form 2_Q2_2025-26_Eng Certificate_Aishani Royale.pdf29 Nov 2025
Form 3File: Form 3_Q2_2025-26_Aishani Royale_01112025.pdf29 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY Q2_FY_2025-26_AISHANI ROYALE.pdf29 Nov 2025
Form 5 (FY 2024-2025)File: FORM 5 FY 2024-25 EEPL AISHANI.pdf27 Sep 2025
Form 1File: FORM 1_ARCH_Q4_FY2024-25_Aishani.pdf24 Aug 2025
Form 2File: FORM 2_ENG_Q4_FY2024-25_Aishani.pdf24 Aug 2025
Form 3File: FORM 3_CA_Q4_FY2024-25_Aishani.pdf24 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY_Q4_FY2024-25_Aishani.pdf24 Aug 2025
Form 1File: FORM 1_ARCH_Q3_FY2024-25_Aishani.pdf24 Aug 2025
Form 2File: FORM 2_ENG_Q3_FY2024-25_Aishani.pdf24 Aug 2025
Form 3File: FORM 3_CA_Q3_FY2024-25_Aishani.pdf24 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY_Q3_FY2024-25_Aishani.pdf24 Aug 2025
Form 1File: FORM 1_ARCH_Q3_FY2024-25_Aishani.pdf24 Aug 2025
Form 2File: FORM 2_ENG_Q3_FY2024-25_Aishani.pdf24 Aug 2025
Form 3File: FORM 3_CA_Q3_FY2024-25_Aishani.pdf24 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY_Q3_FY2024-25_Aishani.pdf24 Aug 2025
Form 1File: Form 1_Q1_2025-26_Aishani Royale.pdf3 Aug 2025
Form 2File: Form 2_Q1_2025-26_Eng Certificate_Aishani Royale.pdf3 Aug 2025
Form 3File: Form 3_Q1_2025-26_Aishani Royale_27072025.pdf3 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY Q1_FY_2025-26_AISHANI ROYALE.pdf3 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 FY_24-25 Aishani Royale.pdf26 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Q4_FY_24-25 Eng Certificate Aishani Royale 200425.pdf20 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY Q3_FY_2024-25 AISHANI ROYALE.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3_CACertificate_BK_Aishani Royale_Q4_2024-25_05042025.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer cert Q3 2425 AISHANI 06012025.pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Aishani Royale Q32425.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3_CACertificate_BK_Aishani Royale_Q3_2024-25_120125 signed.pdf14 Jan 2025
Disclosure of sold/ booked inventoryFile: Q3 SOLD INVENTORY AISHANI ROYALE .pdf14 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM Q1 AISHANI 1RERA.pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AISHANI Q2 2024 (1).pdf29 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3_CACertificate_BK_Aishani Royale_Q2_FY24-25_26_10_24 signed.pdf29 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer cert q2 AISHANI pdf.pdf29 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY AISHANI Q2.pdf29 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 FY 2023 24 - AISHANI ROYALE - Sign.pdf28 Oct 2024
Other - LegalFile: SCANNED LDA OF NEETA LULLA 15 1-10pg_comp.pdf18 Jun 2024
Other - LegalFile: SCANNED LDA OF NEETA LULLA 15 11-21pg_comp.pdf18 Jun 2024
Other - LegalFile: SCANNED LDA OF NEETA LULLA 15 22-32pg_comp.pdf18 Jun 2024
Other - LegalFile: SCANNED LDA OF NEETA LULLA 15 33-43pg_comp.pdf18 Jun 2024
Other - LegalFile: SCANNED LDA OF NEETA LULLA 15 44-54pg_comp.pdf18 Jun 2024
Other - LegalFile: SCANNED LDA OF NEETA LULLA 15 55-65pg_comp.pdf18 Jun 2024
Other - TechnicalFile: Annexure A.pdf6 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: CLatest_Declaration about separate bank account for real estate projects - aishani royale 1 Jun 2024
PAN CardFile: EEPL_Pan Card_compressed.pdf31 May 2024
Copy of the legal title reportFile: legal title report - Aishani royale.pdf27 May 2024
Declaration in FORM BFile: Form B Affidavit Cus Declaration Eskcays Estatess PVT LTD.pdf27 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: aishami ENGINEERS CERTIFICATE FORM - 2 3rd qt.pdf27 May 2024
CERSAI detailsFile: Cersai Declaration for aishani royale.pdf27 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_signed.pdf27 May 2024
Details of encumbrances concerned to FinanceFile: Merged_declaration for no encumbrance finance - aishani royale.pdf26 May 2024
Details of encumbrances concerned to LegalFile: Merged_declaration for no encumbrance finance - aishani royale.pdf26 May 2024
Declaration about Commencement CertificateFile: declaration about commencement certificate - aishsni royale.pdf26 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest in other real estate organizations - aishani royale.pdf26 May 2024
Proforma of Agreement for saleFile: AFS.pdf26 May 2024
Proforma of Allotment letterFile: Format of model allotment letter.pdf26 May 2024
Deviation Report with respect to Allotment letterFile: declaration for no deviation from model from of allotment letter - aishani royale.pdf26 May 2024
Deviation Report with respect to model copy of AgreementFile: declaration for no deviation from AFS - aishani royale.pdf26 May 2024
Layout approvalFile: Ashani Mansion_Passing DWG_Sign VALID.pdf25 May 2024
Building plan approvalFile: Ashani Mansion_Passing DWG_Sign VALID.pdf25 May 2024
Copy of Layout Approval (in case of layout)File: Ashani Mansion_Passing DWG_Sign VALID.pdf25 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Ashani Mansion_Passing DWG_Sign VALID.pdf25 May 2024
Commencement Certificates / NA Order for plotted developmentFile: AISHANI Royale Commencement Certificate Dt 24_05_24.pdf25 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 comp.pdf25 May 2024

How this compares with Palghar

30%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Aishani Royale on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Palghar3,200+ in Palghar

2 kmAishani RoyaleCompleted 112Lapsed / revoked 45Other 123Dot size: filed unitsN

Filed coordinates, straight-line distance. 280 registered projects within 2 km.

Builder: Eskcays Estatess Private Limited

Eskcays Estatess Private Limited has 3 registrations on MahaRERA, including OSIAN ROYALE and Aishani Royale. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Aishani Royale is delayed beyond 30 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Aishani Royale?

The registered promoter entity is Eskcays Estatess Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Aishani Royale?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Aishani Royale?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Aishani Royale?

The professionals named in the filing: Architect: Chirag Bafna; Engineer: MRUDULA KALE; Chartered Accountant: B R Kotecha & Co; Chartered Accountant: SIDDHARTH BHUPENDRA GOGARI; Chartered Accountant: EESHA Bafna. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Aishani Royale?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Aishani Royale. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Aishani Royale to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.