ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / AIKYAM

Registered No litigation declared Mixed project

AIKYAM

By URWAY INFRA LLP

RG-MH-00197 · RERA PM1260002501835 · Last updated on MahaRERA portal: 22 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken
  • Allotment letter deviates from the model form

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2030Possession promisedmoved 12 months from the original
0 of 27Construction stages doneacross 3 buildings; furthest along: Excavation, 70%
207 of 207Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 28 documents Report an error

AIKYAM is a Mixed project by URWAY INFRA LLP in Pune, Maharashtra, registered with MahaRERA as PM1260002501835 on 23 Dec 2025. Possession is promised by 31 Mar 2030. The completion date has moved by 12 months from the original filing. 0 of the 207 units on this registration are recorded sold or booked, and 0 of 27 construction stages are filed complete.

At a glance

Project

  • NameAIKYAM
  • TypeMixed
  • Location
    • Ravet
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PM1260002501835
  • ReraGenie IDRG-MH-00197

Builder

  • NameURWAY INFRA LLP
  • Entity typeLimited Liability Partnership
  • LLPINACF-2309
  • GSTIN27AAIFU1759J1ZP
  • PartnersROHIT GANGARAM AWARE, AVINASH PRALAHAD DIGHE, Virendraprasad Sharad Jadhav

Key dates

this monthRegisteredDec 2025First promiseMar 2029Revised toMar 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Dec 2025
  • Promised completion31 Mar 2030
  • Revised completionRevised to 31 Mar 2030 (originally 31 Mar 2029)
  • Buildings3 building records
  • Documents filed28 files

Current status

0%0 of 207 units booked
4.5%Work done, per cost certificate

Figures as on 22 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WingNA12927027
D WingNA34301800180
C WingNA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 22 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 27 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 70%.

A Wing1%
ActivityProgress
Excavation10%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D Wing8%
ActivityProgress
Excavation70%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C Wing0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNo0%
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNoNot applicable

Parking filed357

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots357
Closed/Covered301
Open Space56
BuildingClosed/CoveredOpen SpaceTotal
A Wing41041
D Wing17438212
C Wing8618104

Land and ownership104

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area12,511 sq m
Land owned byThe promoter, with other names on the file
Named landowners104
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Nov 2025
LandownerVillageDistrict
Gitabai Haribhau ShelkePimpri Chinchawad (M Corp.)Pune
Manisha Ashok KanchanPimpri Chinchawad (M Corp.)Pune
Sunita Vishnu IchakePimpri Chinchawad (M Corp.)Pune
Anita Sanjay DabhadePimpri Chinchawad (M Corp.)Pune
Vanita Tanaji TamjirePimpri Chinchawad (M Corp.)Pune
Tanaji Shanakar ShelkePimpri Chinchawad (M Corp.)Pune
Shalan Tanaji ShelkePimpri Chinchawad (M Corp.)Pune
Sagar Tanaji ShelkePimpri Chinchawad (M Corp.)Pune
Revati Sagar ShelkePimpri Chinchawad (M Corp.)Pune
Nita Khandu YevlePimpri Chinchawad (M Corp.)Pune
Aparna Umesh RakshePimpri Chinchawad (M Corp.)Pune
Samir Tanaji ShelkePimpri Chinchawad (M Corp.)Pune
Pornima Samir ShelkePimpri Chinchawad (M Corp.)Pune
Kalidas Govind ShelkePimpri Chinchawad (M Corp.)Pune
Aasha Kalidas ShelkePimpri Chinchawad (M Corp.)Pune
Archana Nilesh ZendePimpri Chinchawad (M Corp.)Pune
Aparna Tushar ThorvePimpri Chinchawad (M Corp.)Pune
kalyni Mayur KatePimpri Chinchawad (M Corp.)Pune
Kunal Kalidas ShelkePimpri Chinchawad (M Corp.)Pune
Janardan shankar ShelkePimpri Chinchawad (M Corp.)Pune
Lilabai Janardan ShelkePimpri Chinchawad (M Corp.)Pune
Mahesh Janardan ShelkePimpri Chinchawad (M Corp.)Pune
Pooja Mahesh ShelkePimpri Chinchawad (M Corp.)Pune
Dinesh Janardan ShelkePimpri Chinchawad (M Corp.)Pune
Priti Dinesh ShelkePimpri Chinchawad (M Corp.)Pune
Mira Dattatray BhondvePimpri Chinchawad (M Corp.)Pune
Sachin Dattatray BhondvePimpri Chinchawad (M Corp.)Pune
Aarti Sachin BhondvePimpri Chinchawad (M Corp.)Pune
Vishal Dattatray BhondvePimpri Chinchawad (M Corp.)Pune
Punam Vishal BhondvePimpri Chinchawad (M Corp.)Pune
Palavi Mukesh MedankarPimpri Chinchawad (M Corp.)Pune
Khandu Namdev BhondvePimpri Chinchawad (M Corp.)Pune
Sarasvati khandu BhondvePimpri Chinchawad (M Corp.)Pune
Sunil Khandu BhondvePimpri Chinchawad (M Corp.)Pune
Swati Sunil BhondvePimpri Chinchawad (M Corp.)Pune
Shantaram Khandu BhondvePimpri Chinchawad (M Corp.)Pune
Sangita Shantaram BhondvePimpri Chinchawad (M Corp.)Pune
Ujavala Raju BotrePimpri Chinchawad (M Corp.)Pune
Nirmala Tanaji kalokhePimpri Chinchawad (M Corp.)Pune
Babei Suresh BhanusePimpri Chinchawad (M Corp.)Pune
Sambhaji Sadashiv ShelkePimpri Chinchawad (M Corp.)Pune
Shaila Sambhaji ShelkePimpri Chinchawad (M Corp.)Pune
Atul Sambhaji ShelkePimpri Chinchawad (M Corp.)Pune
Rajshree Atul ShelkePimpri Chinchawad (M Corp.)Pune
Akshya Sambhaji ShelkePimpri Chinchawad (M Corp.)Pune
Priyanka Akshya ShelkePimpri Chinchawad (M Corp.)Pune
Hirabai Savant KhairePimpri Chinchawad (M Corp.)Pune
Rajendra vasant KhairePimpri Chinchawad (M Corp.)Pune
Ganesh Vasant KhairePimpri Chinchawad (M Corp.)Pune
Somnath Vasant KhairePimpri Chinchawad (M Corp.)Pune
Subhadra Parshuram ChavhanPimpri Chinchawad (M Corp.)Pune
Hemant Parshuram ChavhanPimpri Chinchawad (M Corp.)Pune
Somnath Parshuram ChavhanPimpri Chinchawad (M Corp.)Pune
Tushar Parshuram ChavhanPimpri Chinchawad (M Corp.)Pune
Mina Kisan ShelkePimpri Chinchawad (M Corp.)Pune
Balasaheb Sadashiv ShelkePimpri Chinchawad (M Corp.)Pune
Urmila Suraj Shelke Urmila Balasaheb PawarPimpri Chinchawad (M Corp.)Pune
Ratna Balu ShelkePimpri Chinchawad (M Corp.)Pune
Suraj Balu ShelkePimpri Chinchawad (M Corp.)Pune
Kajal Vikas SatkarPimpri Chinchawad (M Corp.)Pune
Sukhvani Construction Pro Dipa Ghansham SukhvaniPimpri Chinchawad (M Corp.)Pune
Raju Govind ShelkePimpri Chinchawad (M Corp.)Pune
Chaya Raghunath SakharePimpri Chinchawad (M Corp.)Pune
Shobha Baban MurkutePimpri Chinchawad (M Corp.)Pune
Surekha Dasharat SatavPimpri Chinchawad (M Corp.)Pune
Vaishali Raju ShelkePimpri Chinchawad (M Corp.)Pune
Jay Raju ShelkePimpri Chinchawad (M Corp.)Pune
Ayush Raju ShelkePimpri Chinchawad (M Corp.)Pune
Rajendra Tukaram BhondvePimpri Chinchawad (M Corp.)Pune
Bhau Haribhau PandavPimpri Chinchawad (M Corp.)Pune
Mangesh Bhau PandavPimpri Chinchawad (M Corp.)Pune
Ganesh Tukaram BhondvePimpri Chinchawad (M Corp.)Pune
Nitin Ramchandra BhondvePimpri Chinchawad (M Corp.)Pune
Dattatray Ramchandra BhondvePimpri Chinchawad (M Corp.)Pune
Dattatray Namdev BhondvePimpri Chinchawad (M Corp.)Pune
Vishal Eknath ShelkePimpri Chinchawad (M Corp.)Pune
Nisha Vishal ShelkePimpri Chinchawad (M Corp.)Pune
Samruddhi Vishal ShelkePimpri Chinchawad (M Corp.)Pune
Asha Vasant KatePimpri Chinchawad (M Corp.)Pune
Lilabai Eknath ShelkePimpri Chinchawad (M Corp.)Pune
Sandip Eknath ShelkePimpri Chinchawad (M Corp.)Pune
Punam Sandip ShelkePimpri Chinchawad (M Corp.)Pune
Sanika Sandip ShelkePimpri Chinchawad (M Corp.)Pune
Shravni sandip ShelkePimpri Chinchawad (M Corp.)Pune
Sanskruti sandip ShelkePimpri Chinchawad (M Corp.)Pune
Rekha Hanumant ThakarPimpri Chinchawad (M Corp.)Pune
Sakuntala Chintaman KatePimpri Chinchawad (M Corp.)Pune
Jayshree Rajendra BhondvePimpri Chinchawad (M Corp.)Pune
Aditya Rajendra BhondvePimpri Chinchawad (M Corp.)Pune
Sanskruti Aditya Bhondve Sanskruti Manohar SavlePimpri Chinchawad (M Corp.)Pune
Adarsh Rajesh BhondvePimpri Chinchawad (M Corp.)Pune
Rekha Ganesh BhondvePimpri Chinchawad (M Corp.)Pune
Pratik Ganesh BhondvePimpri Chinchawad (M Corp.)Pune
Piush Ganesh Bhondve Ganesh Tukaram BhondvePimpri Chinchawad (M Corp.)Pune
Shakuntala Nitin BhondvePimpri Chinchawad (M Corp.)Pune
Amar Nitin BhondvePimpri Chinchawad (M Corp.)Pune
Sakshi Nitin BhondvePimpri Chinchawad (M Corp.)Pune
Vidhya Dattatray BhondvePimpri Chinchawad (M Corp.)Pune
Rajni Navnath More Rajani Dattatray BhondvePimpri Chinchawad (M Corp.)Pune
Snehal Aniket Shitole Snehal Dattatray BhondvePimpri Chinchawad (M Corp.)Pune
Nikita Ganesh Pigale Nikita Dattatray BhondvePimpri Chinchawad (M Corp.)Pune
Yash Dattatray BhondvePimpri Chinchawad (M Corp.)Pune
Shruti Vishal ShelkePimpri Chinchawad (M Corp.)Pune
Shreya Vishal ShelkePimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI21972.12
Proposed, not sanctioned21,972 sq m
Buildings approved4
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHREE GANESH PLAZASHIVAJI CHOWKHINJEWADI411021
Estimated costRs 80.10 cr
Cost incurredRs 3.62 cr
Work done4.52%
BuildingWingEstimatedIncurred
D WingNARs 65.20 crRs 2.95 cr
-NARs 8.01 crRs 36.21 lakh
A WingNARs 6.89 crRs 31.15 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectLANDMARK DESIGN GROUP Usha Rangarajan
EngineerGanesh Kadam
Chartered AccountantNAVDEEPP JINDAL AND ASSOCIATES NAVDEEP JINDAL
PartnerRole in project
URWAY INFRA LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA04022619716Mar 2029 → Mar 2030

Reason as filed by the promoterThe original date of completion was set for 31-03-2029 and we would like to extend it till 31-03-2030 due to typographical error.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Mar 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Mar 2026
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2030

Documents filed28

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1 Mar_26 New.pdf22 Apr 2026
Withdrawal Update Form 1File: Form-1 Mar_26 New.pdf22 Apr 2026
Withdrawal Update Form 2File: Form-2 Mar_26.pdf22 Apr 2026
Withdrawal Update Form 2File: Form-2 Mar_26.pdf22 Apr 2026
Withdrawal Update Form 3File: Form 3 Mar_26 Sign.pdf22 Apr 2026
Withdrawal Update Form 3File: Form 3 Mar_26 Sign.pdf22 Apr 2026
Building plan approvalFile: scan (1).pdf20 Mar 2026
Building plan approvalFile: scan (2).pdf20 Mar 2026
Building plan approvalFile: scan (3).pdf20 Mar 2026
Building plan approvalFile: scan (4).pdf20 Mar 2026
Building plan approvalFile: scan (5).pdf20 Mar 2026
Building plan approvalFile: scan (6).pdf20 Mar 2026
Building plan approvalFile: scan (7).pdf20 Mar 2026
Building plan approvalFile: scan (8).pdf20 Mar 2026
Building plan approvalFile: scan (9).pdf20 Mar 2026
Building plan approvalFile: scan (10).pdf20 Mar 2026
Building plan approvalFile: scan (11).pdf20 Mar 2026
Building plan approvalFile: scan (12).pdf20 Mar 2026
Building plan approvalFile: scan (13).pdf20 Mar 2026
Building plan approvalFile: scan (14).pdf20 Mar 2026
Layout approvalFile: Layout_rotated.pdf20 Mar 2026
Withdrawal Update Form 1File: Form-1.pdf24 Jan 2026
Withdrawal Update Form 2File: Form 2 Dec 25.pdf24 Jan 2026
Withdrawal Update Form 3File: form 3 Signed.pdf24 Jan 2026
Layout approvalFile: Layout.pdf24 Nov 2025
Building plan approvalFile: 1-2.pdf24 Nov 2025
Building plan approvalFile: 3-4.pdf24 Nov 2025
Declaration and undertaking (Annexure A)File: 33 ANNEXURE - A declaration for one plot one project.pdf24 Nov 2025

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AIKYAM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ravet13,700+ in Pune

2 kmAIKYAMCompleted 108Lapsed / revoked 52Other 133Dot size: filed unitsN

Filed coordinates, straight-line distance. 293 registered projects within 2 km.

Builder: URWAY INFRA LLP

URWAY INFRA LLP has 1 registration on MahaRERA, including AIKYAM. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if AIKYAM is delayed beyond 31 Mar 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AIKYAM?

The registered promoter entity is URWAY INFRA LLP, a limited liability partnership as per the filing. Its LLPIN ACF-2309 and GSTIN 27AAIFU1759J1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AIKYAM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AIKYAM?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AIKYAM?

The professionals named in the filing: Architect: LANDMARK DESIGN GROUP Usha Rangarajan; Engineer: Ganesh Kadam; Chartered Accountant: NAVDEEPP JINDAL AND ASSOCIATES NAVDEEP JINDAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AIKYAM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AIKYAM. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AIKYAM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.