Home / Browse projects / Palghar, Maharashtra / ADORE GREENS A WING

Registered No litigation declared Residential / Group Housing project

ADORE GREENS A WING

By VEDPRAKASH GIRIJASHANKAR PANDEY

RG-MH-06896 · RERA P99000053774 · Last updated on MahaRERA portal: 9 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 97 documents Report an error

ADORE GREENS A WING is a Residential / Group Housing project by VEDPRAKASH GIRIJASHANKAR PANDEY in Palghar, Maharashtra, registered with MahaRERA as P99000053774 on 28 Nov 2023. Possession is promised by 31 Dec 2027.

At a glance

Project

  • NameADORE GREENS A WING
  • TypeResidential / Group Housing
  • Location
    • Vevoor
    • Palghar
    • 401404
  • Pincode401404
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000053774
  • ReraGenie IDRG-MH-06896

Builder

  • NameVEDPRAKASH GIRIJASHANKAR PANDEY
  • Entity typeIndividual

Key dates

this monthRegisteredNov 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Nov 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed97 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ADORE GREENS A WINGNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

ADORE GREENS A WING: 36% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed25

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots25
Closed/Covered25

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area488 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Prakash Hemraj BafnaPalghar Palghar

Approvals and building plan

Permissible FSI1326.69
Proposed, not sanctioned1,327 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLokhandwala Complex Kandivali Mumbai 400101

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectChirag Bafna Architect And Associates
EngineerMrudula M Kale
Chartered AccountantB R Kotecha And Co
Chartered AccountantASWIN P MALDE
Chartered AccountantEESHA
PartnerRole in project
VEDPRAKASH GIRIJASHANKAR PANDEY-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed97

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1_Q4_FY2025-26___.pdf9 Jun 2026
Form 2File: Form 2_Q4_FY 2025-26.pdf9 Jun 2026
Form 3File: Form 3_Q4_FY2025-26.pdf9 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold Inventory Q4 FY 2025-26.pdf9 Jun 2026
Form 2A (FY 2024-2025)File: GV 3 -FORM 2-24-25.pdf14 Feb 2026
Form 1File: Form 1_Q3_FY2025-26_GV3.pdf8 Feb 2026
Form 2File: Form 2_Q3_FY 2025-26_Eng Certificate_GV3 A WING.pdf8 Feb 2026
Form 3File: Form 3_Q3_FY2025-26_CACertificate_GV3_A wing.pdf8 Feb 2026
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY_Q3_FY2025-26_GV3 A WING.pdf8 Feb 2026
Form 1File: Form 1_Q2_FY2025-26_GV3.pdf25 Dec 2025
Form 2File: Form 2_Q2_FY 2025-26_Eng Certificate_GV3_A WING.pdf25 Dec 2025
Form 3File: Form 3_Q2_FY2025-26_CACertificate_GV3_A wing.pdf25 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY_Q2_FY2526_GV3.pdf25 Dec 2025
Form 1File: FORM 1_SCANNED COPY GV3.pdf25 Dec 2025
Form 2File: Form 2_ENGINEER CERTFICATE FOR GV3.pdf25 Dec 2025
Form 3File: Form 3_Q4FY23-24_GV3HD_signed.pdf25 Dec 2025
Disclosure of Sold and Booked InventoryFile: GV3 SOLD INVENTORY Q4.pdf25 Dec 2025
Form 1File: Form 1.pdf25 Dec 2025
Form 2File: FORM 2 KALE GV3 Q3_2023-24 signed.pdf25 Dec 2025
Form 3File: Form 3_signed.pdf25 Dec 2025
Disclosure of Sold and Booked InventoryFile: GV3 SOLD INVENTORY Q3.pdf25 Dec 2025
Form 1File: Form 1_Q1_FY2025-26_GV3.pdf17 Aug 2025
Form 2File: Form 2_Q1_FY2025-26_Eng Certificate_GV3.pdf17 Aug 2025
Form 3File: Form 3_Q1_FY2025-26_GV3.pdf17 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY Q1_FY2526 GV3 27072025.pdf17 Aug 2025
Form 1File: Form1 Q4_FY24-25 Archi Certificate GV3 A WING.pdf17 Aug 2025
Form 2File: Form2 Q4 FY 2024-25 Eng Certificate GV3 A WING.pdf17 Aug 2025
Form 3File: Form3 GV3 Signed.pdf17 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY Q4_FY2425 GV3 260425.pdf17 Aug 2025
Form 1File: Form1 Q3 FY 2024-25 Eng Certificate GV3 A WING.pdf17 Aug 2025
Form 2File: Form2 Q3 FY 2024-25 Eng Certificate GV3 A WING.pdf17 Aug 2025
Form 3File: Form3_Q3_2425 _CACertificate_Bakulesh Kotecha_GV3HD_190125.pdf17 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY Q3 GV3 202425.pdf17 Aug 2025
Form 1File: Form1 Q2 FY 2024-25 Eng Certificate GV3 A WING.pdf17 Aug 2025
Form 2File: Form2 Q2 FY 2024-25 Eng Certificate GV3 A WING.pdf17 Aug 2025
Form 3File: Form3_Q2_24_25 _CACertificate_Bakulesh Kotecha_GV3HD_281024 signed.pdf17 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY Q2 GV3 RERA.pdf17 Aug 2025
Form 1File: FORM 1 Q1 24 25 GV3 28 7.pdf17 Aug 2025
Form 2File: Form2_Q1_FY2425_GV3.pdf17 Aug 2025
Form 3File: Form3_Q1_24_25 _CACertificate_Bakulesh Kotecha_GV3HD_281024 signed.pdf17 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory FORM Q1 GV3 RERA.pdf17 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Q4_FY24-25 Eng Certificate GV3 A WING.pdf26 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3_Q3_2425 _CACertificate_Bakulesh Kotecha_GV3HD_190125.pdf26 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Q4 FY 2024-25 Eng Certificate GV3 A WING.pdf26 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY Q4_FY2425 GV3 260425.pdf26 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY Q4_FY2425 GV3 260425.pdf26 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY Q4_FY2425 GV3 260425.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Q3_FY 24-25_GV.pdf15 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Q3 FY 2024-25 Eng Certificate GV3 A WING.pdf15 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY Q3 GV3 202425.pdf15 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q1 24 25 GV3 28 7.pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 Q2 GV3 RERA.pdf29 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3_Q1_24_25 _CACertificate_Bakulesh Kotecha_GV3HD_281024 signed.pdf29 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3_Q2_24_25 _CACertificate_Bakulesh Kotecha_GV3HD_281024 signed.pdf29 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: signed_Form2.pdf29 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: signed_Form2.pdf29 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory FORM Q1 GV3 RERA.pdf29 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY Q2 GV3 RERA.pdf29 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Signed_Form 5 GV3 HOUSING CERTIFICATE.pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_SCANNED COPY GV3.pdf6 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_ENGINEER CERTFICATE FOR GV3.pdf6 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A _QUALITY ASSURANCE GV3.pdf6 Jun 2024
Disclosure of sold/ booked inventoryFile: GV3 SOLD INVENTORY Q4.pdf6 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Q4FY23-24_GV3HD_signed.pdf6 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 KALE GV3 Q3_2023-24 signed.pdf28 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_signed.pdf21 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf2 Mar 2024
Disclosure of sold/ booked inventoryFile: GV3 SOLD INVENTORY Q3.pdf2 Mar 2024
Copy of the legal title reportFile: Comp_Adv Tahir Legal Title Report_Final.pdf3 Nov 2023
Details of encumbrances concerned to FinanceFile: __LegalAndFinance.pdf29 Oct 2023
Details of encumbrances concerned to LegalFile: __LegalAndFinance.pdf29 Oct 2023
CERSAI detailsFile: Final_No Declaration Cersai.pdf29 Oct 2023
Other - TechnicalFile: Architect Declaration_.pdf29 Oct 2023
Other - TechnicalFile: Comp_Revised Adore Greens Passing DWG Wing- A.pdf29 Oct 2023
Details of encumbrances concerned to FinanceFile: Final_Both_DECLARATION OF ENCUMBRANCE FINANCE N LEGAL.pdf17 Oct 2023
Details of encumbrances concerned to LegalFile: Final_Both_DECLARATION OF ENCUMBRANCE FINANCE N LEGAL.pdf17 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FINAL ENGINEER CERTIFICATE GV3 16 10.pdf17 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST ANNEXURE A GV3 13 10.pdf17 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION OF BANK ACCOUNT FORMAT A GV3 13 10.pdf17 Oct 2023
Deviation Report with respect to model copy of AgreementFile: Final_DECLARATION OF NO DEVIATION (AFS) A GV3 14 10 2023.pdf17 Oct 2023

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ADORE GREENS A WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Palghar3,200+ in Palghar

2 kmADORE GREENS A WINGCompleted 103Lapsed / revoked 55Other 112Dot size: filed unitsN

Filed coordinates, straight-line distance. 270 registered projects within 2 km.

Builder: VEDPRAKASH GIRIJASHANKAR PANDEY

VEDPRAKASH GIRIJASHANKAR PANDEY has 1 registration on MahaRERA, including ADORE GREENS A WING. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if ADORE GREENS A WING is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ADORE GREENS A WING?

The registered promoter entity is VEDPRAKASH GIRIJASHANKAR PANDEY, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ADORE GREENS A WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ADORE GREENS A WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ADORE GREENS A WING?

The professionals named in the filing: Architect: Chirag Bafna Architect And Associates; Engineer: Mrudula M Kale; Chartered Accountant: B R Kotecha And Co; Chartered Accountant: ASWIN P MALDE; Chartered Accountant: EESHA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ADORE GREENS A WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ADORE GREENS A WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ADORE GREENS A WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.